Cathedral Park Master Plan$10,413,957
Asset as named in source: Not specified
Cathedral Park MP Improvements
KGW table row 94. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate parking lot_Parking Area A and B$3,269,099
Asset as named in source: Parking Area A and B
Repair parking lot that was rated 5 in condition assessment. Repair include surface, drainage and curb. approx area= 111428 sq.ft
KGW table row 87. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Improve Waterfront$2,909,990
Asset as named in source: Cathedral Park
Improvements to waterfront area of park including utilities, retaining walls, paving, landscaping and habitat features and site furninshings. Dock = separate project.
KGW table row 89. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Improve Upper Park$2,643,848
Asset as named in source: Cathedral Park
Improvements to upper area of park (eastern portion) including retaining walls, paving and stairs, landscaping and site furnishings.
KGW table row 90. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Improve Middle Park$1,897,322
Asset as named in source: Cathedral Park
Improvements to middle area of park under the bridge including structures, paving, landscaping and site furnishings.
KGW table row 95. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Improve Lower Park$940,393
Asset as named in source: Cathedral Park
Improvements to lower area of park (largest portion) including utilities, retaining walls, paving, landscaping and site furnishings.
KGW table row 83. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Crawford Street Access$687,288
Asset as named in source: Cathedral Park
Improvements to access through park on Crawford Street, including utilities, paving and landscaping.
KGW table row 84. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Dock & Log Boom Replacement$588,024
Asset as named in source: Cathedral Park
- Replace 6 failed dock sections and 2 log booms. At ramp and fishing dock.
- The boom logs between the northern most pillars have come disconnected there by allowing logs to push up against the dock again.
KGW table row 85. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Improve Upland Habitat$348,803
Asset as named in source: Cathedral Park
Improvements to upland habitat on North side of bridge adjacent to developed area.
KGW table row 86. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Renovation$294,012
Asset as named in source: Cathedral Park
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
KGW table row 88. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate parking lot_Parking Area C$176,448
Asset as named in source: Parking Area C
Repair parking lot that was rated 4 in condition assessment. Repair include surface, drainage and curb. approx area= 10792 sq.ft
KGW table row 92. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace Backflow preventer device$18,000
Asset as named in source: Irrigation and Potable water
- Replace out of compliance backflow preventers
- Assembly: Double Check Valve Assembly (DCVA)
- Move to property line, if needed
- Hazard: well Site
- See components for detail
KGW table row 91. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Hauling dock sections from shoreline$17,357
Asset as named in source: Boat Ramp
Remove dock sections from shoreline sometime in mid-April. Contractor will lift dock sections to shore/upland for dismantling and haul-off.
KGW table row 93. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗