Replace tennis Court Surfaces$1,157,106
Asset as named in source: Tennis courts
Court is unplayable, designated as "keep" in Strategy. Replace the tennis courts surfacing (subgrade, pavement, court surfacing, striping) Aprox arae 13,500 sq.ft
KGW table row 595. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate parking lot_Parking Area D$854,732
Asset as named in source: Parking Area D
Repair parking lot that was rated 4 in condition assessment. Repair include surface, drainage and curb. approx area= 52277 sq.ft
KGW table row 581. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace sport field surface$750,000
Asset as named in source: sport field
Recurrence project to replace sport field turf every 10 years
KGW table row 583. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate the Roof of Restroom building$98,585
Asset as named in source: Restroom A
Fix or replace the Roof that is rated 4 through buildings' assessment
KGW table row 580. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Lents Park$80,884
Asset as named in source: Not specified
Replace Lents Park's old well pump/pump motor with a new and more efficient pump/pump motor.. FIM Name: 18.02-0234 Replace Well Pump
KGW table row 582. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate the Roof of Restroom - Storage building$67,834
Asset as named in source: Restroom B
Fix or replace the Roof that is rated 4 through buildings' assessment
KGW table row 584. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗PREPHub Pilot Project$59,967
Asset as named in source: Lents Park
Emergency gathering stations
KGW table row 585. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Renovation$48,969
Asset as named in source: Internal Pathway/ Sidewalk
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
KGW table row 586. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Tennis Court Lighting Replacement$21,673
Asset as named in source: Lents Park
Replace light fixtures for energy efficiency and directionality at Lents Tennic Courts.
KGW table row 587. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Lents Park$18,559
Asset as named in source: Not specified
Refurbish existing well at Lents Park via sonar-jet cleaning of well casing to disintegrate mineral and bacterial deposits.. FIM Name: 18.01-0234 Refurbish Existing Well
KGW table row 589. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Roof repair replacment$15,481
Asset as named in source: Restroom A
Replace roof on restroom and internal finishing at Lents Park. Replaces previous CIP 2287, projects were split out by site.
KGW table row 590. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair steps to Pavilion$11,760
Asset as named in source: Lents Park
-Stair steps to Pavilion seating third base side: repair top step. Top step is fractional higher rise and at an angel. Trip hazzard.
- the stairs are exactly the same height all the way up until you reach the top. And up there, it is higher on one side than the other and at a bit of an angle. The last game I was at on 8/2, there were several people that tripped and fell coming up those stairs.
KGW table row 591. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair Green box seats$11,760
Asset as named in source: Lents Park
- Green box seats need to be fixed - front side sags down when seated
- Outside of PRMS scope
KGW table row 592. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Lents Park$2,564
Asset as named in source: Not specified
Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0234 Building Exterior Lighting Controls
KGW table row 588. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Lents Park$1,644
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-0234 Building Interior Lighting LED Conversion
KGW table row 593. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Lents Park$1,589
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0234 Building Exterior Lighting LED Conversion
KGW table row 594. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗