Portland ParksAtlas

296 candidate targets, with the evidence still to verify.

A research register for checking what was adopted, funded and delivered. Missing or incompatible evidence does not establish failure.

Reviewed September 12, 2026. Earlier delivery grades withdrawn; source locators and comparable outcome measures are being verified.

Plans and commitments: evidence register

Review correction — September 12, 2026. Earlier delivered/not-delivered grades and the aggregate scoreboard have been withdrawn. Some comparisons used different measures (including tree stocking versus canopy coverage), and the underlying adoption, funding, baseline and deadline evidence was not consistently established.

This register contains 296 candidate entries from 24 plans and initiatives. These are research leads, not 296 verified or deduplicated legal commitments. All delivery judgments remain not yet verified. The earlier 295-entry headline did not match the current table-row count; the count now comes from the register. Similar targets across plans may overlap.

How an entry earns a delivery status

Verify the adopted source and exact page/table; determine whether the item is a funded commitment, policy requirement or aspirational goal; record its baseline, eligible population, denominator, deadline and responsible entity; then compare an outcome measured on the same basis and period. Missing reporting is not proof of failure. A different metric cannot establish that a target was met or missed.

The linked material is a starting point for that review, not certified evidence for the transcribed target. A backlog total cannot establish maintenance spending as a percentage of replacement value, and tree canopy coverage cannot establish tree stocking. No overall completion percentage is published while these checks remain unresolved.

The October 2025 City audit separately documents findings about fiscal sustainability and lifecycle funding. Those supported audit findings remain available; this register does not replace the auditor's conclusions.

Plan-by-plan ledger

Parks 2020 Vision (2001)

Candidate targetReported deadlineReview statusSources to inspect
Neighborhood Park within 1/2 mile and Community Park within 1 mile of every resident (80% met in 2001)2020Not yet verifiedSource 1; Source 2
20 acres parkland per 1,000 residents (grow 10,070 → 11,940 acres) — reaffirmed in Land Acquisition Strategy 2016 (3,000-acre gap in 2001; 1,640 closed by 2016)2020Not yet verifiedSource 1; Source 2; Source 3
Full-service community center within 3 miles of every resident2020Not yet verifiedSource 1; Source 2; Source 3
100 new sports fields (220 → 320)2020Not yet verifiedSource 1; Source 2
Finish the 40-Mile Loop Trail (60% complete in 2001)2020Not yet verifiedSource 1; Source 2
Double trails from 150 to 300 miles2020Not yet verifiedSource 1; Source 2
Increase protected habitat land by 620 acres (1,440 → 2,060, excl. Forest Park)2020Not yet verifiedSource 1; Source 2
Street tree stocking 60% → 80%; park stocking 80% → 90%2020Not yet verifiedSource 1; Source 2
90% of public rating parks quality good/very good (from 84%)2020Not yet verifiedSource 1; Source 2
Volunteer-to-paid-hours ratio ≥30% (from 25%)2020Not yet verifiedSource 1; Source 2
Gifts/grants/donations 0.5% → 10% of budget2020Not yet verifiedSource 1; Source 2
Building maintenance funding 1% → 2% of replacement value2020Not yet verifiedSource 1; Source 2
Reduce recreation-fee reliance 50% → 25% of Recreation budget2020Not yet verifiedSource 1; Source 2
Raise satisfaction metrics to ~90% across five measures2020Not yet verifiedSource 1
Establish a Parks FoundationNot yet verifiedSource 1; Source 2
Establish an advisory Parks BoardNot yet verifiedSource 1; Source 2
20-year infrastructure/capital master plan within 18 months, updated annually~2003Not yet verifiedSource 1; Source 2
Comprehensive integrated marketing/community involvement planNot yet verifiedSource 1; Source 2
Comprehensive partnership plan (incl. school district agreements)Not yet verifiedSource 1
Seek voter approval of GO bondsNot yet verifiedSource 1; Source 2
Seek voter approval of an operations levyNot yet verifiedSource 1; Source 2; Source 3
Long-term strategies for dependable parks fundingNot yet verifiedSource 1; Source 2

Urban Forest Management Plan (2004)

Candidate targetReported deadlineReview statusSources to inspect
Coordinate bureaus via a standing Urban Forestry Policy GroupNot yet verifiedSource 1; Source 2
Document forest health/condition (tree inventories)Not yet verifiedSource 1; Source 2
Repeat canopy studies every 5-8 yearsRecurringNot yet verifiedSource 1; Source 2
Preserve/maintain/restore the urban forest (healthy forest by 2020)2020Not yet verifiedSource 1; Source 2
35-40% residential canopyNot yet verifiedSource 1; Source 2
35% street tree canopyNot yet verifiedSource 1; Source 2
15% industrial/institutional canopyNot yet verifiedSource 1
Increase quality/quantity of large canopy treesNot yet verifiedSource 1; Source 2
Stable, adequate urban forest fundingNot yet verifiedSource 1; Source 2
Unify/strengthen tree regulationsNot yet verifiedSource 1; Source 2

Protect the Best (2007–)

Candidate targetReported deadlineReview statusSources to inspect
Prevent invasive infestations in most ecologically healthy areas; build buffer habitatOngoingNot yet verifiedSource 1
Deliver annual treatment schedules under PP&R-BES MOUAnnualNot yet verifiedSource 1; Source 2
Track all treatments in ArcGISOngoingNot yet verifiedSource 1
Biannual program reports to BES and PP&R managementTwice yearlyNot yet verifiedSource 1
Annual spring EDRR treatment (garlic mustard etc., 2-3 weeks) — also a Natural Areas Restoration Plan commitmentAnnualNot yet verifiedSource 1; Source 2
Reduce total invasives on more acres at lower cost/less herbicideNot yet verifiedSource 1; Source 2

Skatepark System Plan (2008)

Candidate targetReported deadlineReview statusSources to inspect
Build the 19-site network (13 skatespots, 5 district, 1 regional)Not yet verifiedSource 1; Source 2
Regional "crown jewel" skatepark at ODOT Steel Bridge site (30,000-35,000 sf)Not yet verifiedSource 1; Source 2
Six named sites: Pier, Glenhaven, Holly Farm, Ed Benedict, Gabriel, BerrydaleNot yet verifiedSource 1; Source 2
Remaining 12 planned sites: I-405, Kenton, University Park, Alberta, Fernhill, Parkrose HS, Brentwood, Lents, Powell, Westmoreland, Woodstock, VenturaNot yet verifiedSource 1; Source 2
Skate facility within 1 mile of every PortlanderNot yet verifiedSource 1; Source 2
Cover and light district/regional facilities for year-round useNot yet verifiedSource 1; Source 2
Dedicated skatepark program coordinatorYears 1-2Not yet verifiedSource 1
Standing skatepark advisory group (SPLAT successor)Not yet verifiedSource 1; Source 2
Consider skateparks in master plans for Thompson, Beech, Glenfair, Parklane, GatesDuring master planningNot yet verifiedSource 1; Source 2

Trail Design Guidelines (2009)

Candidate targetReported deadlineReview statusSources to inspect
Establish trail design standards for all trail typesNot yet verifiedSource 1; Source 2
Guide staff/consultants/developers/volunteers on all future trailsOngoingNot yet verifiedSource 1
Accessible trails meeting/exceeding Forest Service accessibility guidelinesOngoingNot yet verifiedSource 1
Rebuild substandard trail sections as funding allowsAs fundedNot yet verifiedSource 1; Source 2
Consistent regional trail signage programNot yet verifiedSource 1

Natural Areas Restoration Plan (2010, updated 2015)

Candidate targetReported deadlineReview statusSources to inspect
Review/update the plan every 3-5 yearsRecurringNot yet verifiedSource 1; Source 2
Restore degraded medium/high-value areas via BES crews + friends-group MOUsOngoingNot yet verifiedSource 1; Source 2
Oak woodland restoration (Elk Rock Island, Powell Butte, Forest Park, Willamette escarpment, Terwilliger)Not yet verifiedSource 1
Wetland/riparian restoration (Oaks Bottom culvert, Beggars-Tick, April Hill, Powers Marine, Columbia Slough) + wetlands inventoryNot yet verifiedSource 1
Continue acquisition per 2006 Natural Area Acquisition StrategyOngoingNot yet verifiedSource 1; Source 2
Water-quality BMPs: Golf Greenway testing, Maxicom irrigation conversion, culvert inventory~2015Not yet verifiedSource 1
Public engagement: friends-group MOUs, interpretation program, youth programs, environmental education~2015Not yet verifiedSource 1; Source 2
Systemwide ecosystem-health monitoring programNot yet verifiedSource 1; Source 2
Natural-area asset survey + site-based restoration databaseNot yet verifiedSource 1; Source 2
Comprehensive research program; share via Intertwine/UERCNot yet verifiedSource 1
Watershed-based salmon recovery; maintain Salmon-Safe certificationOngoingNot yet verifiedSource 1; Source 2

Willamette River Recreation Strategy (2012)

Candidate targetReported deadlineReview statusSources to inspect
No-net-loss of river recreation capacity; protect three motorized boat rampsOngoingNot yet verifiedSource 1; Source 2
Willamette Park: dredge basin, repair ramp toe, debris boom~2027Not yet verifiedSource 1; Source 2
Swan Island: replace boarding floats~2027Not yet verifiedSource 1
Cathedral Park: full boating facility renovation per 2009 master plan (priority capital site)~2027Not yet verifiedSource 1; Source 2
Madison Street dock reconfiguration (PF&R) with public access5-15 yrsNot yet verifiedSource 1
Sellwood Riverfront Park: replace aging dock5-15 yrsNot yet verifiedSource 1; Source 2
McCarthy Park: rebuild southern path toe for non-motorized launching5-15 yrsNot yet verifiedSource 1
Replace Ankeny Dock with new westside public dock~2027Not yet verifiedSource 1
SE Spokane Street light-watercraft launch node5-15 yrsNot yet verifiedSource 1
South Waterfront public dock~2027Not yet verifiedSource 1
Acquire former Staff Jennings site for passive river recreationNot yet verifiedSource 1
Holistic beach/shore access evaluation incl. Waterfront Park bowl swimmingNot yet verifiedSource 1; Source 2
Improve shoreline fishing accessNot yet verifiedSource 1; Source 2
Standing citizen river recreation advisory committee2012Not yet verifiedSource 1
Convene marine law enforcement; improve river education/programming2012Not yet verifiedSource 1
River recreation survey/data program + economic impact study2012Not yet verifiedSource 1
Dock siting/design BMP criteria to unblock permitting2012Not yet verifiedSource 1
River-facility asset management and replacement funding plan2012Not yet verifiedSource 1
Regular updates to the StrategyPeriodicNot yet verifiedSource 1

ADA Title II Transition Plan (citywide 2014) + Parks Facilities Supplement (2015)

Candidate targetReported deadlineReview statusSources to inspect
Citywide barrier inventory + transition plan (342 facilities, ~25,000 barriers)Not yet verifiedSource 1; Source 2
Parks-specific supplement (adjusted schedule)2015Not yet verifiedSource 1; Source 2
Programmatic-access Self-Evaluation "in the next phase"Not yet verifiedSource 1; Source 2
Remove 17,008 scheduled barriers over 20 years (~$130M min. per HPHP 2023)~FY2035-36Not yet verifiedSource 1; Source 2; Source 3
Years 1-2: remove 2,567 high-priority maintenance barriersFY2017/18Not yet verifiedSource 1; Source 2
Years 3-5: remove 3,293 maintenance barriersFY2020/21Not yet verifiedSource 1; Source 2
Years 6-10: remove 6,847 barriers (incl. 3,962 unfunded capital)FY2025/26Not yet verifiedSource 1; Source 2; Source 3
Years 11-20: remove remaining 4,301 barriers~FY2035/36Not yet verifiedSource 1; Source 2
Track every barrier in MicroMain work-order system to mitigationNot yet verifiedSource 1; Source 2
Pursue capital funding (bond etc.) and opportunistic removal in capital projectsNot yet verifiedSource 1; Source 2

2014 Parks Replacement Bond (Measure 26-159)

Candidate targetReported deadlineReview statusSources to inspect
Fix/replace 7-15 closed or deficient play areasNot yet verifiedSource 1; Source 2
Repair community pools (Matt Dishman, Peninsula, Grant)Not yet verifiedSource 1
Restore Pioneer Courthouse SquareNot yet verifiedSource 1
Repair Forest Park/Springwater trails and bridges; restrooms, roofs, deficient structuresNot yet verifiedSource 1
ADA accessibility improvements across park locationsNot yet verifiedSource 1
Improve maintenance buildings (Mt. Tabor Maintenance Yard — final project)Not yet verifiedSource 1
Issue up to $68M without raising the tax rate ($0.0877/$1,000)Not yet verifiedSource 1
Five-person citizen oversight committee + annual reports until closeoutAnnualNot yet verifiedSource 1
At least two audits (midpoint + closeout)CloseoutNot yet verifiedSource 1
Exceed equity contracting goals (20% City target)Not yet verifiedSource 1; Source 2

Parks SDC Methodology (2015) + 20-Year Capacity Project List (2016, Ord. 187770)

Candidate targetReported deadlineReview statusSources to inspect
Use SDC revenue (~$552M/20 yrs) for acquisition, new parks, capacity improvementsNot yet verifiedSource 1; Source 2
Maintain the 20-year SDC-CIP as a living Council-amendable listNot yet verifiedSource 1; Source 2
Fund major listed projects: 3 new community/aquatic centers ($54-63M each), Washington-Monroe ($48M), ADA tranches ($30M), greenway trail segments~2036Not yet verifiedSource 1; Source 2
Complete the 10-year methodology/rates/project-list updateSummer 2026Not yet verifiedSource 1; Source 2; Source 3
During housing SDC exemption (2025-2028): adjust project priorities for ~$27M forgone revenue; report every 6 monthsThrough Sept 2028Not yet verifiedSource 1; Source 2; Source 3

Land Acquisition Strategy (2016)

Candidate targetReported deadlineReview statusSources to inspect
Move "in time" to a needs-based acquisition methodologyNot yet verifiedSource 1
Prioritize trail-corridor acquisitions (40-Mile Loop, Willamette Greenway, 2006 Trails Strategy)Not yet verifiedSource 1; Source 2
Comprehensive cultural-resource inventory of park propertiesNot yet verifiedSource 1
Run a standing acquisition program (7 areas, willing sellers, equity weighting, public nominations)Not yet verifiedSource 1; Source 2

Renew Forest Park (~2016–)

Candidate targetReported deadlineReview statusSources to inspect
Restore: ecological health + wildfire risk reductionOngoingNot yet verifiedSource 1
Rebuild: bridges, culverts, trails, Leif Erikson, firelanesAs fundedNot yet verifiedSource 1
Reconnect: Forest Park Entrance (~$18M) incl. future Nature CenterPhasedNot yet verifiedSource 1; Source 2
Public transit connections to Forest ParkNot yet verifiedSource 1
Information/safety signage (traffic signs 2022-23, Google Maps fixes)2022-23Not yet verifiedSource 1
Multi-lingual community hikes/welcoming programsOngoingNot yet verifiedSource 1
Comprehensive accessibility assessment + barrier removalNot yet verifiedSource 1

PP&R Strategic Plan 2017-2020 (2017)

Candidate targetReported deadlineReview statusSources to inspect
Maintenance standards for parks, trails, natural areas2020Not yet verifiedSource 1
Sustainable Landscapes Initiative pilots2020Not yet verifiedSource 1
Complete the Urban Forestry Management Plan update (also: UFMP 2004 update commitment; Racial Equity Plan 5.3.a; 2017 Tree Code audit recommendation)2020Not yet verifiedSource 1; Source 2; Source 3
Citywide tree planting strategy prioritizing low-canopy/low-income neighborhoods (also Racial Equity Plan 5.3.b)2020Not yet verifiedSource 1; Source 2
Improved tree-permit service-level tracking2020Not yet verifiedSource 1
Equity-focused programming model (Arts/Culture/Summer/Urban Parks; Gateway Discovery; IFCC)2020Not yet verifiedSource 1
Aquatics equity plan (participation + employment)2020Not yet verifiedSource 1
Revised scholarship policy + fiscal process2020Not yet verifiedSource 1; Source 2
Re-initiate PREP demographic data collection2020Not yet verifiedSource 1; Source 2
Preschool full cost recovery plan (Council budget note)FY 2017-18Not yet verifiedSource 1
Golf financial action plan with culturally responsive outreach2020Not yet verifiedSource 1
Update design Specifications Library2020Not yet verifiedSource 1
Assessment standards/protocols for high-priority asset categories2020Not yet verifiedSource 1
Energy savings performance contracts2020Not yet verifiedSource 1
Improved seasonal hiring for a diverse workforce2020Not yet verifiedSource 1
Bureau training plan + onboarding processes2020Not yet verifiedSource 1
Health/safety/environment compliance program + SAFE task force2020Not yet verifiedSource 1
Graphics standards manual, bureau CRM, five-year marketing plan, language-skills assessment2020Not yet verifiedSource 1
Strengthen CBO partnerships; language access plan; Language Line bureau-wide2020Not yet verifiedSource 1
Level of Service analysis (parks/natural areas; community centers/pools)2020Not yet verifiedSource 1
Economic impact study + 15-year demographic forecast2020Not yet verifiedSource 1
Update the Cost Recovery Policy (restated in HPHP 2023 as "currently updating")2020Not yet verifiedSource 1; Source 2
Five-year financial plan for fiscal sustainability2020Not yet verifiedSource 1
Successor long-term vision plan beyond 2020 (also Racial Equity Plan measure 1.2.b: Council-adopted 2030 Vision by 2020)2020Not yet verifiedSource 1; Source 2

Five-Year Racial Equity Plan (2017)

Candidate targetReported deadlineReview statusSources to inspect
Division-level racial equity plans by 2019; equity statements posted by 20172019Not yet verifiedSource 1
Racial equity lens + Vulnerability Index on four major projects; integrate into next vision plan2017Not yet verifiedSource 1; Source 2
Annual budget equity analysis reviewed by BAC/OEHRAnnual 2017-21Not yet verifiedSource 1; Source 2
Training coordinator + racial equity training measures (100% onboarding, 80% adequacy, 100% work-plan goals)2018Not yet verifiedSource 1
35% of recreation arbitration hires people of color2017Not yet verifiedSource 1
Full-time employees of color 21% → 35%2021Not yet verifiedSource 1
Seasonal-to-FT conversion equity; +20% youth-of-color apprenticeship pipeline; 100% career guidance2020Not yet verifiedSource 1
85% agree workplace is comfortable regardless of identity (from 70%)2021Not yet verifiedSource 1
Culturally responsive outreach standards by 2018; 80% partner-collaboration rating by 20192018-19Not yet verifiedSource 1
Five-year comms strategy for communities of color; 10 safe-harbor languages; Facebook growth 1,900 → 6,0002019Not yet verifiedSource 1
Advisory bodies 35% POC/immigrant/disability; 35% of budget input from communities of color; monthly Native American leader meetings2018Not yet verifiedSource 1
100% friends/partner groups equity-trained; equity language in 50/75/100% of agreements2019Not yet verifiedSource 1
Language Access Plan (Title VI), Language Line training, ADA Title II self-assessment2019Not yet verifiedSource 1
Build parks in park-deficient Cully and East Portland: Cully, Luuwit View, Gateway Discovery, Parklane Phase 12020Not yet verifiedSource 1; Source 2
Complete 2014 bond projects in underserved East Portland (Argay, Wilkes, Ventura, Parklane, Lynchview, Ed Benedict, Bloomington)2020Not yet verifiedSource 1; Source 2
Vulnerability Index-driven acquisitions/CIP scoring; know POC households' half-mile access2020Not yet verifiedSource 1
Expand Teen Program, youth ambassadors, Parks for New Portlanders; track SFFA attendance by community2021Not yet verifiedSource 1
Meet/exceed MBE/MWESB contracting goals with quarterly tracking2021Not yet verifiedSource 1

City Auditor Audits & Bureau Responses (2017-2025)

Candidate targetReported deadlineReview statusSources to inspect
Tree Code 2017: address workload/permitting-technology constraints; improve compliance monitoringNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Scholarships 2018: clarify/update scholarship policyNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Scholarships 2018: dedicated scholarship fundingNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Scholarships 2018: periodic Council reporting on costs/performanceNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Scholarships 2018: strategic outreach plan addressing language barriersNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Golf 2019: present alternative financial forecast scenarios to CouncilNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Golf 2019: define program mission in operator contracts w/ equity provisionsNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Golf 2019: increase operator contract-compliance monitoringNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Golf 2019: present golf contracts to Council for approvalNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Golf 2019: address ~$43M golf deferred maintenance via asset management plan ($1.9M/yr)Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Asset Mgmt 2025: Citywide Asset Management Strategy (governance, decisions, funding, buy-in)Sept 2027Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Asset Mgmt 2025: present strategy to Council publicly + public webpage with updatesBy Sept 2027Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Parks Fiscal Mgmt 2025 Rec 1: fiscal sustainability / long-range financial plan with LOS goals (also committed in 2024-25 Levy Annual Report)June 30, 2028Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Parks Fiscal Mgmt 2025 Rec 2: cost-savings webpage by Dec 31, 2025Dec 31, 2025Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Parks Fiscal Mgmt 2025 Rec 3: level of service plan with CouncilJune 30, 2028Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Parks Fiscal Mgmt 2025 Rec 4: base asset investments on systemwide LOS goalsJune 30, 2028Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Parks Fiscal Mgmt 2025 Rec 5: transparent funding-needs communication (maintenance + lifecycle) for new capital projects per FIN-2.03Dec 31, 2025Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Parks Fiscal Mgmt 2025 Rec 6: update City Financial Policy FIN-2.03 (CFO)Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5
Unified CIP initiative across Public Works Service Area incl. PP&RNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5

Sustainable Future (2019–)

Candidate targetReported deadlineReview statusSources to inspect
Bring a long-term funding proposal to Council in 20202020Not yet verifiedSource 1; Source 2
Fund Scenario 2 "Maintain" (+$50M) or Scenario 3 "Fulfill" (+$119M) rather than "Decline"Not yet verifiedSource 1
Option 1: pursue a GO bond for capital needsNot yet verifiedSource 1; Source 2
Option 2: pursue a special park & recreation districtNot yet verifiedSource 1; Source 2
Option 3: pursue a five-year local option levyNot yet verifiedSource 1; Source 2
Option 4: pursue a prepared food & beverage taxNot yet verifiedSource 1
Options 5-6: transient lodging tax and cell phone taxNot yet verifiedSource 1; Source 2
Explore an income tax (added at Council's instruction)Not yet verifiedSource 1
Overall: lead PP&R in a financially sustainable direction for the long termNot yet verifiedSource 1; Source 2

2019 Metro Parks & Nature Bond — Local Share (Portland, project slate approved May 25, 2022)

Candidate targetReported deadlineReview statusSources to inspect
Implement all ten Local Share projects ($31.82M)Not yet verifiedSource 1
Columbia Boulevard ped/bike crossing to Chimney Park ($3M)Not yet verifiedSource 1; Source 2
Hoyt Arboretum Bristlecone Pine Trail ADA renovation ($3M)Not yet verifiedSource 1
Wilkes Headwaters master plan + restoration ($4M)Not yet verifiedSource 1
Rose City Golf Course perimeter trail ($2M)Not yet verifiedSource 1
Multi-site packages: LED lighting (30 parks), restroom roofs (5), trail bridges (8), ADA/paths (8), natural-area access/signs, Forest Park trails/firelanesNot yet verifiedSource 1
Community engagement per project, Metro IGA, regular reporting, COBID contractingNot yet verifiedSource 1; Source 2
Serve POC, Indigenous, low-income, and disabled communities per Metro criteriaNot yet verifiedSource 1

2020 Parks Levy (Measure 26-213) — Ballot Commitments, Annual Reports & Oversight (2020-2026)

Candidate targetReported deadlineReview statusSources to inspect
C1: Enhance/preserve parks, rivers, wetlands, treesFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
C2: Serve diverse populationsFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
C3: Increase access to nature for POC and low-income childrenFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
C4: Prevent recreation cuts and center/pool closuresFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
C5: Enhance park maintenance (clean/safe)FY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D1: Protect water quality/habitat; remove invasives across ~8,000 acresFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D2: Recreation programs (education, camps, concerts, swim, meals)FY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D3: Remove financial barriers (Access Discount)FY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D4: Litter/hazardous waste, grounds, safety checksFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D5: Keep restrooms open and cleanFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D6: Plant trees in low-canopy communities (also Racial Equity Plan 5.3.c)FY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D7: Proactive maintenance of 1.2M park treesFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D8: Modernize data systemsFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
D9: Prioritize POC and low-income householdsFY2025-26Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Oversight: community committee reporting annually + independent auditAudit Yrs 3-5Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: Hire all approved maintenance positions (23 of 68 in Y1; complete remainder incl. Y2's 20-30)Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: 5 urban forestry positions + 12 arborists for proactive tree careFY2022-23Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: Access Pass registration system replacing "Pay What You Can"FY2022-23Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: Survey Portlanders on cost-barrier reductionNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: Expand environmental education (extra Teen Nature Team week)FY2022-23Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: Complete the $5M work order system upgradeNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: Deploy volunteer management databaseFY2022-23Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: First PLOC report fall 2022, then annuallyFall 2022+Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6; Source 7
Y1: Spend the $25.58M underspend on voter commitmentsLevy periodNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y1: Second HPHP "Listening & Learning" wave in 20222022Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6; Source 7
Y2: Park tree maintenance ramp-up late 2023 (116-property pilot)Late 2023Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y2: ~30 career fairs annually for aquatics recruitingAnnualNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y2: Stabilize Summer Free For All with underserved partnersOngoingNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y2: Continue Renew Forest Park; expand Soft Surface Trails teamOngoingNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y2: Seek capital funding for the ~$600M deferred maintenance backlog (also urged by PLOC FY24; also 2024 Citywide Assets Report gap-closing commitment)Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6; Source 7; Source 8
Y3: Expand Schools to Pools toward all second gradersNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y3: Publish first-ever Park Tree Maintenance Plan (3-5 yr rotations)FY2023-24Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y3: Community Needs Survey summer 2024Summer 2024Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y3: Complete Mt. Scott Community Center retrofit and reopenNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6; Source 7
Y3: Rebuild storm-damaged Mt. Tabor shelter with salvaged lumberNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y3: 2024 Natural Asset Assessment pilot (31 natural areas + 7 nature patches)2024Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y3: Daily checks + at-least-annual CPSC playground inspectionsOngoingNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y4: PCEF partnership for additional tree plantings (2023-2028)2028Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
Y4: Secure levy renewal to avoid cutting 1/3-1/2 of operationsNov 2025Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6; Source 7
PLOC FY22: continue Leveraged Funding Model (levy funds spent last)OngoingNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
PLOC FY22: apply equity lens + share PLOC materials publiclyOngoingNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
PLOC FY23: refine performance measures beyond complianceNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
PLOC FY23: increase levy spending/service delivery (fix Y1-2 underspend)Years 3-5Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
PLOC FY23: expand partnerships and urban forestry capacityNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
PLOC FY24: disseminate audit findings publicly in early 2025Early 2025Not yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6; Source 7
PLOC FY24: quantify per-commitment metrics; succinct visual communicationsNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
PLOC FY25: broaden communication (22.7% Access Discount awareness) + visual graphsNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6
PLOC FY25: continued financial transparency; keep levy additive, not substitutive of General FundOngoingNot yet verifiedSource 1; Source 2; Source 3; Source 4; Source 5; Source 6

Level of Service Guidance & LOS Project (April 2022)

Candidate targetReported deadlineReview statusSources to inspect
Developed park or natural area within 1/2 mile of every household (reaffirms Parks 2020 Vision; measured on developed-park basis)Not yet verifiedSource 1; Source 2
Full-service community center within 3 miles — requires 4 new centers (next: central Eastside, then NE)Not yet verifiedSource 1; Source 2
Close gaps with 110 new recreational assets (42 play areas, 20 gardens, 16 spray-play, 11 skateparks, etc.)Not yet verifiedSource 1; Source 2
Add 29 developed parks (154 → 183)Not yet verifiedSource 1; Source 2
Two all-weather sports-field complexes (East + SW Portland)Not yet verifiedSource 1; Source 2
Maintain/expand North Portland aquatics within 5 years (Columbia Pool funded only through June 2022)~2027Not yet verifiedSource 1; Source 2; Source 3
Use LOS Guidance annually in capital funding prioritization and undeveloped-property planningAnnualNot yet verifiedSource 1; Source 2
Accommodate emerging sports (futsal, pickleball, bike hockey) in existing tennis facilitiesNot yet verifiedSource 1; Source 2
Engage public on community-center needs "when timing is appropriate"Not yet verifiedSource 1; Source 2
Share LOS recommendations/reports publiclyNot yet verifiedSource 1; Source 2
Complete/present LOS plans for parks and community centers (Council FY2019-20 budget note)Not yet verifiedSource 1; Source 2; Source 3
Build a comprehensive systemwide Level of Service Plan (the guidance's stated aspiration; now audit Rec 3)Not yet verifiedSource 1; Source 2
Update community-center LOS after arts/recreation strategy work concludesNot yet verifiedSource 1; Source 2

Healthy Parks, Healthy Portland (framework 2020–; first report July 2023)

Candidate targetReported deadlineReview statusSources to inspect
Adopt new mission, vision, values, six outcomes, Equity & Anti-Racism Commitment via co-design2023Not yet verifiedSource 1; Source 2
Implement HPHP core components (listening cycle, Actions & Results Framework, Decision Support Tool, closing-the-loop, investment-results links) by end of 2024End 2024Not yet verifiedSource 1
Anti-racism "We will" actions (voice, belonging, inclusive policy, workforce diversity, learning)Not yet verifiedSource 1
Reach 33.3% citywide canopy by 2030 with equitable distribution (City goal)2030Not yet verifiedSource 1; Source 2
Cut PP&R carbon emissions below 5,000 MT by 20302030Not yet verifiedSource 1
Complete Mill Park and Parklane Park (East Portland access 69.4% → 71%)Not yet verifiedSource 1; Source 2
Close the East Portland access gap (~13 more parks, ~$300M)Not yet verifiedSource 1
Conduct a community survey in 2023 (updating 2017)2023Not yet verifiedSource 1
Make the low-income tree permit fee waiver permanent in FY2023-24FY2023-24Not yet verifiedSource 1

Off-Road Cycling Master Plan (2023; drafted 2015-2017)

Candidate targetReported deadlineReview statusSources to inspect
New off-road cycling facilities at 23 park sitesNot yet verifiedSource 1; Source 2
Forest Park trail improvements + cycling loop (Firelane 1, St. Helens Rd parallel trail, 53rd Dr trail)Not yet verifiedSource 1
River View Natural Area: design sustainable shared-use trail (interim bike ban)Not yet verifiedSource 1
Three urban off-road cycling trail corridorsNot yet verifiedSource 1; Source 2
Improve all existing facilities (Gateway Green, Ventura pump tracks)Not yet verifiedSource 1
Incorporate ORCMP projects into the CIP for annual budgetsAnnualNot yet verifiedSource 1; Source 2

2024 Citywide Assets Report — Parks Sections (2024)

Candidate targetReported deadlineReview statusSources to inspect
Develop a clearer natural-area investment picture via the new assessment processNot yet verifiedSource 1
Advance asset-management maturity (lifecycle costing, alternatives analysis, maintenance optimization, handover, resource-service alignment)Not yet verifiedSource 1

Natural Area Assessment Program (2025 report, published January 2026)

Candidate targetReported deadlineReview statusSources to inspect
Complete first full-system assessment (incl. ~5,000 Forest Park acres)2029Not yet verifiedSource 1
Reassess the entire system every 5 years thereafterFrom 2029Not yet verifiedSource 1
Comprehensive natural-asset Asset Management Plan (service levels, risk, valuation)Post-2029Not yet verifiedSource 1
Publish all data via interactive dashboardOngoingNot yet verifiedSource 1; Source 2
Updated Site/Assessment Unit maps for all unassessed sitesBefore 2029Not yet verifiedSource 1

Portland Urban Forest Plan (2025)

Candidate targetReported deadlineReview statusSources to inspect
45% citywide canopy within 40 years~2065Not yet verifiedSource 1
At least 25% canopy in every neighborhoodNot yet verifiedSource 1
35% canopy over streets in 20 years~2045Not yet verifiedSource 1
Pattern-area targets (Western 66%, Central City 20%, Inner 45%, Eastern 50%, Rivers 20%)Not yet verifiedSource 1
PCEF Tree Protection & Care: $65M City-run street tree maintenance program2029Not yet verifiedSource 1
PCEF Equitable Tree Canopy: $40M, ≥15,000 trees with 5-year establishment care2029Not yet verifiedSource 1; Source 2
$5M Tree Canopy Maintenance Reserve for income-qualified owners2029Not yet verifiedSource 1
$5M 82nd Avenue Street Tree Expansion (sidewalks + tree space)2029Not yet verifiedSource 1
$840K Arborist Trainee Program (≥3 paid positions, pathway to permanent)2 yrs from launchNot yet verifiedSource 1
Plan for City to assume legal/financial responsibility for street trees (action 2-3)Nov 2027Not yet verifiedSource 1
Plan for City responsibility for street-tree sidewalk repairs (action 2-4, PBOT)2028Not yet verifiedSource 1
Permanent Trees in the Curb Zone program with annual reporting (action 3-2)Nov 2027+Not yet verifiedSource 1
Update Tree Code (Title 11) to align with the plan (action 7-2)2026-2028Not yet verifiedSource 1; Source 2
Citywide canopy assessment every 5 years (action 6-3; also the Levy Year-4 FY25-26 canopy-survey commitment)RecurringNot yet verifiedSource 1; Source 2
Public tree-planting data dashboard (action 6-4)OngoingNot yet verifiedSource 1
Street tree list review every 5 yrs; regular inventories; survival monitoring (actions 7-1, 6-1, 6-5)OngoingNot yet verifiedSource 1
Review the plan itself every 10 years~2035Not yet verifiedSource 1

September 2026 partnership reporting addendum

The Council evidence review distinguishes reported program progress from completed commitments. A report of a software launch does not establish compliance with every earlier database or reporting target.