General Improvements - Phase 2 (newer buidlings)$9,002,054
Asset as named in source: Multnomah Arts Center
Newer Buildings: General Preventative Maintenance plus service delivery and revenue generation upgrades to newer portions of site except Pottery, which has own line.
KGW table row 734. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace old HVAC system$5,100,009
Asset as named in source: Multnomah Arts Center
Placeholder: replace HVAC system that was installed before 2000
KGW table row 738. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Seismic / Structural$4,644,224
Asset as named in source: Multnomah Art Center, Pottery Bldg
There are 10 distinct 'blocks' that require slightly different treatments. See 2008 Comprehensive Seismic Repair Report by Waterleaf Architecture.
KGW table row 740. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair and Replace Clay Barrel Tile Roof & Str$680,929
Asset as named in source: Multnomah Arts Center
The clay barrel tile roof system at MAC is in very poor to failed condition. Many tile are broken, crumbling, and delaminating. The sleepers that the tile are attached to have become brittle and are splitting and breaking and do not provide a proper anchorage for the tile which allow the tile to come loose and slip. The felt paper under the tile and sleepers has become brittle and has come apart in many areas. The skip sheeting under the felt paper is old and brittle and is in poor condition in many areas. there are areas of dry rot in the skip sheeting and the structural framing underneath. Many of the lead flashings are failing. The system as a whole springs multiple leaks annually which cause water damage to the building interior finishes and fixtures.
KGW table row 735. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate Basketball court$411,617
Asset as named in source: Multnomah Art Center Annexes
Ground/court:
- Hole developed where it appears fireworks The surface of the basketball court has a tripping hazard on the playing surface that continues to get worse, being both deeper and wider. It is located just right of the free throw line on the north end of the court.
- The surface of the outdoor covered basketball court is deteriorating and is again becoming a potential safety hazard for the public.
Court Roof:
Replace failing siding, roofing, and water drainage system. Modify structure to include seismic upgrades.
KGW table row 739. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Fire Protection improvement$359,799
Asset as named in source: Multnomah Arts Center
- Provide automatic sprinklers in unprotected areas such as cottages
- Upgrade fire alarm system
KGW table row 741. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Window Replacement$270,694
Asset as named in source: Multnomah Arts Center
1- Dance studio has high ceilings and single-pane windows that are inefficient. Cement and glazing are failing, water has leaked onto wood flooring. These windows are the #1 priority for MAC manager.
2- Gym has high ceilings and single-pane windows that are inefficient. Cement and glazing are failing, water has leaked onto wood flooring. These windows are the #2 priority for MAC manager.
3- Replacement of approximately 2/3 of the windows that are original 1913-1918 single pane windows, with energy efficient windows.
KGW table row 743. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Playground renovation$137,052
Asset as named in source: Play Area A
Renovation or repair playground that was rated as 4
during playground assessment in 2020
KGW table row 749. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Improvements to hallway lighting$98,596
Asset as named in source: Multnomah Arts Center
Replacement and expansion of hallway lighting system to adequately light the halls. Additional benefit and potential revenue could be achieved through proper lighting of consigment art displays (existing and future). Energy efficient fixtures will also reduce energy costs.
KGW table row 733. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Security System Upgrade$61,435
Asset as named in source: Multnomah Arts Center
Improvements to current security system due to difficulty in monitoring a large facility. Upgrade system to monitor facility with CCTV and alarming of additional facilities to minimize risk of theft. CCTV to be installed in hallways to cover 7 separate entraces, gallery, courtyard and other art facilties.
KGW table row 736. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair stormwater plumbing$55,586
Asset as named in source: Multnomah Arts Center
Address stormwater drainage issues that have caused damage to the facility and the grounds through major gutter and underground pipe repairs. Some existing gutters, drains, and underground plumbing is clogged or collapsed, which has caused flooding both inside and outside the building.
KGW table row 737. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Exterior Paint for N and NW side$35,980
Asset as named in source: Multnomah Arts Center
critical painting of exterior of main facility to prevent further deterioration of building, especially at N and NW areas of building. The Parapet maybe absorbing the water from the roof cause the paint to deteriorate
KGW table row 742. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Sewer repair$26,441
Asset as named in source: Multnomah Arts Center
Repair sewer line at MAC.
KGW table row 744. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Dance studio and performance space improvements$26,317
Asset as named in source: Multnomah Arts Center
Remodel current dance studio into professional rehersal / performance space with new floor, mirrors, theater lighting and board, audience risers, etc
KGW table row 745. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Multimedia computer lab and technology center$23,221
Asset as named in source: Multnomah Arts Center
Remodel existing spaces to provide room for 20 desktop computer stations, 1 teaching station with projector and screen, 10 stations for music technology instruction, etc.
KGW table row 746. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Safe Entry Ramp from sideway$17,990
Asset as named in source: Multnomah Arts Center
Install an ADA-accessible sidewalk that connects the existing sidewalk on SW 31st Avenue up the curved driveway to the existing sidewalk near the rear entrance of the senior center in the Multnomah arts center.
KGW table row 747. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace the deteriorating carpet$17,990
Asset as named in source: Multnomah Arts Center
The carpet in Senior Center Lobby in end of life cycle and there is hole and tearing in some places. The hole is currently covered by duct tape
KGW table row 748. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Water system evalution$10,200
Asset as named in source: Community center
Water system is deteriorating and need evaluation to determine the needed scope of work. The evaluation needs to include HVAC and potable water pipes
KGW table row 750. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace Backflow preventer device$10,000
Asset as named in source: Property
- Replace out of compliance backflow preventer
- Premises Isolation (PI): 3" Reduced Pressure (RB)+ Enclosure.
- Move to property line, if needed
KGW table row 751. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.