A Park · $634.7K
Row 1: Renovate sport field · $264,467
Sport fields rated 4 or 5 in condition assessment
Row 2: Wildwood Playground Equipment Replacement (2 struc · $216,786
Removal and replacement of existing Wildwood play structures. Wildwood play equipment is no longer manufactured. Structures have outlived their useful life. Expand footprint of play area, make ADA accessible. Also remove whirly due to lead base. Note that these improvements could trigger the requirement to bring other aspects of the park up to ADA.
Row 3: Renovate restroom · $141,727
Renovate buildings rate 4 or 5 in condition assessment
Row 4: ESPC-III_Buildings Lighting to LEDs · $11,760
LED conversion for Exterior and Interior Lights
Bridlemile Elementary School · $154.8K
Row 54: Bridlemile ES - 1 Soccer Field, 1 Ball Field · $154,807
- Bridlemile ES - 1 Soccer Field, 1 Ball Field.
- CONTRIBUTION toward improvements at selected schools such as installing irrigation, improved goals, backstops, bleachers, etc.
Butterfly Park · $83.5K
Row 80: Ecological Restoration_ Butterfly Park · $73,503
Placholder for Ecological health restoration
Part of (Willamette Moorage and Butterfly Park) project
Row 81: Replace Backflow preventer device · $10,000
- Replace out of compliance backflow preventer
- Assembly: Double Check Valve Assembly (DCVA)
- Premises Isolation (PI): 1.5" Reduced Pressure (RP)+ Enclosure. Serial # 4086005
- Move to property line, if needed
- Hazard: Flood Plain
Centennial SUN Community School · $154.8K
Row 98: Centennial HS - 3 Soccer, 2 Ball Fields · $154,807
CONTRIBUTION toward converting natural grass at selected schools to synthetic turf. Lights.
Downtown Service Zone - Work Unit · $12K
Row 201: Repair the stair handrail · $11,993
"Hand rail has a section of it (approx. 10-15') laying on the ground in the ivy that needs to be reattached to the rail and there is a bicycle rack that needs to be bolted down. needed work:
- Complete missing handrail segment
- Complete missing parts of exsisting handrail
- Bolt down the bicycle rack"
Faubion Elementary School · $692.7K
Row 284: Contribution to school sports fields citywide · $692,709
Contribution towards turf and irrigation renovation at Faubion school sports field. Replaces CIP 2220, projects were split out by site.
General Locations · $2.6M
Row 375: Electrical system replacement · $594,933
Electrical system is corroded and will fail in the near future. This is for installation of a new system.
Row 376: Jefferson HS - 3 Soccer, 1 Ball Fields · $234,340
CONTRIBUTION toward improvements at selected schools such as installing irrigation, improved goals, backstops, bleachers, etc.
Row 377: Marshall HS - 2 Soccer, 1 Ball Fields · $23,221
CONTRIBUTION toward converting natural grass at selected schools to synthetic turf. Lights.
Row 378: Parkrose HS - 3 Soccer, 2 Ball Fields · $154,807
CONTRIBUTION toward converting natural grass at selected schools to synthetic turf. Lights.
Row 379: Menlo Park MS - 2 Soccer Fields · $154,807
CONTRIBUTION toward improvements at selected schools such as installing irrigation, improved goals, backstops, bleachers, etc.
Row 380: Develop a Community Gardens Center · $1,393,267
Part of Tabor Yard?
Hayhurst Elementary School · $43.3K
Row 428: Renovate irrigation at PPS Sports field · $43,294
Renovate irrigation system at Hayhurst ES school field to provide more field capacity. Replaces CIP 2291, projects were split out by site.
Horticultural Services - Work Unit · $54.7K
Row 456: Reroof Tabor Horticulture Building and Associated Repairs · $54,673
The roof is just old and leaks a lot. Roof contains asbestos, roof removal will likely trigger seismic URM upgrades and possibly historic design review. Roof replacement can’t occur until the greenhouse structure is removed as part of the Tabor renovation
Kelly Elementary School · $33.8K
Row 513: Renovate irrigation at PPS Sports field · $33,824
Renovate irrigation system at Kelly ES school field to provide more field capacity. Replaces CIP 2291, projects were split out by site.
Lee (Jason) Elementary School · $33.8K
Row 579: Pathway Renovation · $33,808
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
Macleay Park · $10K
Row 608: Replace Backflow preventer device · $10,000
- Replace out of compliance backflow preventer
- Assembly: Double Check Valve Assembly (DCVA)
- Premises Isolation (PI): 2" Double Check (DC)+ Vault. Serial # 11045
- Move to property line, if needed
- Hazard: Right of Way (ROW)
Maint Facility - SE 136th and Reedway - Southeast · $853.7K
Row 645: Building Renovation · $739,490
Renovate buildings rated 4 or 5 in condition assessment
Row 646: ESPC-II_ Maint Facility - SE 136th and Holgate · $6,186
Add R-38 fiberglass batt insulation to underside of roof deck in shop area.. FIM Name: 13.02-0675 Add Roof Insulation
Row 647: Renovate electrical and mechanical equipment · $50,000
Electrical and mechanical equipment’s passed 25 year of service and need to replace.
Row 648: ESPC-II_ Maint Facility - SE 136th and Holgate · $5,098
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-0675 Building Interior Lighting LED Conversion
Row 649: ESPC-II_ Maint Facility - SE 136th and Holgate · $48,229
Move the existing CCTV/security station cabinet on E wall of the building into the maintenance supervisor’s office. Cabinet to be mounted so that the top of the cabinet is at the same height as the supervisor’s desk. Propose relocating to the left of the window on the southern wall of the supervisor’s office.. FIM Name: 20.00-0675 Relocate Existing CCTV/Security User Interface
Row 650: ESPC-II_ Maint Facility - SE 136th and Holgate · $1,997
Tighten schedules and setpoints to match occupancy and maintain a 5F deadband between occupied heating and cooling setpoints.. FIM Name: 04.01-0675 DDC/Control System Optimization
Row 651: ESPC-II_ Maint Facility - SE 136th and Holgate · $1,649
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0675 Building Exterior Lighting LED Conversion
Row 652: ESPC-II_ Maint Facility - SE 136th and Holgate · $1,098
Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0675 Building Exterior Lighting Controls
Row 653: Upgrade building upon workspace assessment outcome · $0
Mary Rieke Elementary School · $1.5M
Row 667: Replace sport field surface · $1,500,000
Recurrence project to replace sport field turf every 10 years
Rigler Elementary School · $154.8K
Row 914: Rigler ES - 3 Soccer Fields, 1 Ball Fields · $154,807
CONTRIBUTION toward improvements at selected schools such as installing irrigation, improved goals, backstops, bleachers, etc.
Smith Elementary School · $154.8K
Row 977: Smith ES - 1 Soccer Field, 2 Ball Fields Renovat · $154,807
CONTRIBUTION toward improvements at selected schools such as installing irrigation, improved goals, backstops, bleachers, etc.
SW Carwash Fountain · $111.1K
Row 1020: Electrical system replacement · $111,054
Electrical system is unsafe to operate and has been disconnected. Fountain cannot operate until new system is installed. This is for installation of new system.
Willamette Greenway Trail · $3.8M
Row 1151: Drainage Repair · $320,831
Install new drainage at low point near trestle to prevent flooding
Row 1152: Greenway Westside · $3,471,319
Greenway Westside - Repair Existing Failing Sections
Woodlawn Elementary School · $692.7K
Row 1168: Contribution to school sports field · $692,709
- Contribution to school sports fields citywide