Scores, sources, growth labels and equity, housing and variety scores are PP&R's fields in its public backlog map workbook, extract dated 2026-10-12, downloaded 2026-10-13. In this extract 1,505 of 1,521 scored items divide evenly by their equity score, and the quotients are products of two numbers from 1 to 5, consistent with the stated formula; the scales and weights are not published. Housing and Variety scores have no public definition. 941 items have an unambiguous match to a November 2023 estimate row, totaling $506.2M; those are 2023 proposals.
score PP&R Project Score as published in the backlog workbook; higher is higher priority in the bureau's capital-maintenance process. Unchanged by the Atlas.
equity PP&R Equity Score (1 to 5) from the bureau's equity index: youth, people of color and low-income households nearby.
housing PP&R Housing Score as published; definition not public.
variety PP&R Variety Score as published; definition not public.
riskProduct Project Score divided by Equity Score when it divides evenly; consistent with likelihood × consequence on 1 to 5 scales. An Atlas reading, not a City field.
band Atlas reading bands on the published score: Top 75+, High 48–74, Medium 24–47, Lower 1–23, Unscored.
closureRisk The property and asset family appear on the January 2025 briefing's "Assets at Highest Risk of Closure" slides, and the item's title or description matches that family. closureRiskProperty is true for every item at a named property.
ada The item's title or description mentions ADA or accessibility; an Atlas keyword flag, not a Transition Plan link.
los Project Source is "Level of Service": the item came from the 2022 LOS guidance process.
growth Growth % above zero or SDC-eligible: added capacity, not maintenance of an existing asset.
levyCategory Restroom or playground scope, the categories the 2025 levy names for its capital share; a keyword flag.
historicalEstimate Sum of November 2023 KGW estimates whose title and description match this item at the same property (unambiguous matches only); a 2023 proposal, not a current estimate. PP&R backlog projects map workbook (public download) ↗ PP&R, A sustainable future (scoring criteria) ↗ PP&R capital maintenance briefing, January 2025 ("Assets at Highest Risk of Closure", slides 5–8) ↗ 2025 Parks Levy: capital share for restrooms, playgrounds and facilities ↗ KGW historical project estimates, November 2023 (crosswalk, unambiguous matches only) ↗ Every open item with scores, flags and evidence (CSV)Properties with their highest score and counts (CSV) The January 2025 closure-risk list, as transcribed (CSV) Definitions and method