Scores, sources, growth labels and equity, housing and variety scores are PP&R's fields in its public backlog map workbook, extract dated 2026-10-12, downloaded 2026-10-13. In this extract 1,505 of 1,521 scored items divide evenly by their equity score, and the quotients are products of two numbers from 1 to 5, consistent with the stated formula; the scales and weights are not published. Housing and Variety scores have no public definition. 941 items have an unambiguous match to a November 2023 estimate row, totaling $506.2M; those are 2023 proposals.
- score
- PP&R Project Score as published in the backlog workbook; higher is higher priority in the bureau's capital-maintenance process. Unchanged by the Atlas.
- equity
- PP&R Equity Score (1 to 5) from the bureau's equity index: youth, people of color and low-income households nearby.
- housing
- PP&R Housing Score as published; definition not public.
- variety
- PP&R Variety Score as published; definition not public.
- riskProduct
- Project Score divided by Equity Score when it divides evenly; consistent with likelihood × consequence on 1 to 5 scales. An Atlas reading, not a City field.
- band
- Atlas reading bands on the published score: Top 75+, High 48–74, Medium 24–47, Lower 1–23, Unscored (no score, or a score of 0, which the 1-to-5 scales cannot produce).
- closureRisk
- The property and asset family appear on the January 2025 briefing's "Assets at Highest Risk of Closure" slides, and the item's title or description matches that family. closureRiskProperty is true for every item at a named property.
- ada
- The item's title or description mentions ADA or accessibility; an Atlas keyword flag, not a Transition Plan link.
- los
- Project Source is "Level of Service": the item came from the 2022 LOS guidance process.
- growth
- Growth % above zero or SDC-eligible: added capacity, not maintenance of an existing asset.
- levyCategory
- Restroom or playground scope, the categories the 2025 levy names for its capital share; a keyword flag.
- capitalFY27
- FY 2026–27 adopted capital budget in project lines tied to this property by a hand-reviewed list, the project number, or an unambiguous park name in the title. Budget authority for the year, not spending; it does not say which backlog item, if any, the money pays for.
- workType
- What kind of work the item is, read by the Atlas from PP&R's title and then its description with ordered keyword rules, plus a hand-reviewed list for large or mixed items (scripts/build-backlog-priorities.py). One type per item; not a City field. Whether an item adds capacity is PP&R's own Growth %, kept separately.
- historicalEstimate
- Sum of November 2023 KGW estimates whose title and description match this item at the same property (unambiguous matches only); a 2023 proposal, not a current estimate.