Brooklyn Park - Play Area Safety and ADA$120,750
Asset as named in source: Brooklyn Park
Removal and replacement of existing Wildwood play structures. Wildwood play equipment is no longer manufactured. Structures have outlived their useful life.
KGW table row 58. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair blacktop pathway near SE 16th$117,605
Asset as named in source: Brooklyn Park
Repair blacktop trail / pathway near SE 16th. Asphalt is heaved by tree roots in numerous locations.
KGW table row 59. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate Basketball sport court at Brooklyn Park$114,377
Asset as named in source: Basketball Court
Fix or replace the Nike Resurf surface of the court that is rated 4 through courts' assessment
KGW table row 60. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Baseball Field and North Side Drainage Improvement$43,628
Asset as named in source: Brooklyn Park
Runoff from baseball field / park slope floods neighboring property owned by private party. This short masonry wall and trench will replace temporary sandbag measures to prevent runoff from entering neighboring property.
KGW table row 55. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Renovation$34,030
Asset as named in source: Brooklyn Park
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
KGW table row 56. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Restroom Renovation$28,225
Asset as named in source: Brooklyn Park
- Replace the roof of Restrrom A
- This project derived from Building assessment
KGW table row 57. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-III_Buildings Lighting to LEDs$11,760
Asset as named in source: Restroom - Storage
LED conversion for Exterior and Interior Lights
KGW table row 61. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗