Brooklyn · District 3 · Mid-size park · 3.6 acres

Brooklyn School Park

Developed parkPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: let my kids play, sit down to eat, and walk or roll on pavement.

Brooklyn School Park PlaygroundPhoto from the City's park page

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…stay a while
…play
…get here and move

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Youth drop-in — Free unstructured play with somewhere for adults to sit.
  • Nature education — Environmental programs and guided walks.
  • All-weather indoor — Programming that survives a Portland winter.
One addition to investigate
  • Evening use — needs restroom
  • League play — needs restroom
  • Summer water play — needs splash pad or wading pool or all swimming pools or interactive fountain
  • Markets & festivals — needs restroom

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • walk or roll on pavement
  • sit down to eat
  • be in a park
  • let my kids play
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • let my kids play
  • sit down to eat
  • be in a park
  • walk or roll on pavement
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • sit down to eat
  • be in a park
  • let my kids play
  • walk or roll on pavement
0 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • sit down to eat
  • be in a park
  • let my kids play
  • walk or roll on pavement
0 programs · 0 events starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
000
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
000
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

What's on

No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.

Reserve at Brooklyn School Park

This park has facilities you can reserve. Booking happens on the city's official systems — every link below goes straight there.

Picnic sites
Reserve a site
SiteTablesFeeFeatures
A3$35.25
B3$35.25
  • · No vehicle access allowed.

Fees and inventory from PP&R's 2026 picnic brochure. A $27.50 application fee applies. Reserve online or call 503-823-2525.

Partners & friends

The whole ecosystem
Opportunity signal

No known partner is currently linked to Brooklyn School Park in the Partnership Atlas. This is an opportunity signal, not an official priority.

See opportunity signals

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

Brooklyn School Park

$1.1M

3 distinct source rows. Proposed repair and improvement costs, not a current funding gap.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

What the estimates cover

Courts, fields & golf$1M
Play & gathering$35.3K
Energy & building systems$31.8K

Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.

The work, cost & reason (3 source rows)
Renovate Tennis sport court at Brooklyn School Park$1,037,930

Asset as named in source: Tennis Court

Fix or replace the Asphalt surface of the court that is rated 4 through courts' assessment

KGW table row 64. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Playground Surface Area$35,281

Asset as named in source: Brooklyn School Park

Playground Surfacing - EWF level is insufficient and a majority of the existing EWF has decomposed. Area should be completely excavated and new EWF added. Failed Inspection Point from WO 287133

KGW table row 62. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-III_Pathway Lighting to LEDs$31,753

Asset as named in source: Not specified

Pathway Lighting Conversion to LEDs and Controls. Aprox: 9 Poles

KGW table row 63. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗

9 of 50 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

A complete annual cost is not yet available.

This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 3

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
4,387
Households within a half mile
2,261

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
4
Closed backlog IDs
3

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
0

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

No partner agreement on record

The department-provided directory names no agreement here. Friends groups without a formal agreement are not captured.

From the department-provided partnership directory. It records what is on paper, not who does each task.

Condition across all assets

Citywide condition atlas

Across 50 assessed assets at this park, 18% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 4Above fair · 6Fair · 31Poor · 7Very bad · 2
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Fences2022Pathways & trailsPlayground equipment2020Sport fieldsSport courts

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.

AssetConditionStatusReplacementAssessed
Picnic Table
Condition rated poor (code 4). Priority high.
Record 5082
Poor condition
code 4
Activeno2007-09-11
Picnic Table
Condition rated poor (code 4); replacement field says yes. Priority high.
Record 8432
Poor condition
code 4
Activeyes2007-09-11
Showing all 2 public repair candidates.
Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 19

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Bench×8
33333233
Picnic Table×6
234343
Barbeque×2
22
Drinking Fountain×1
3
Memorial×1
–
Permanent Trash Can×1
2
Official Portland.gov profile

From the City's park page

Brooklyn School Park on Portland.gov

Open official page
City label
Park
Year acquired
1979
Official acres
3.588
City section
SE
Neighborhood
Brooklyn
Location

SE 15th Avenue and Bush Street Portland, OR 97202

Directions
Hours

Park hours: 5:00am-midnight To reserve a picnic area, call 503-823-2525. Picnic Sites & Info

Amenities and activities
Picnic tablePlaygroundPaths (paved)

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/brooklyn-school-park-68?utm_source=park_qr&utm_medium=sign&utm_campaign=park_68

Where this comes from

Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.