Replace sport field surface$6,000,000
Asset as named in source: sport field
Recurrence project to replace sport field turf every 10 years
KGW table row 222. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate the Roof of Maintenance - Storage building$3,925,991
Asset as named in source: Urban Forestry Barn
Fix or replace the Roof that is rated 4 through buildings' assessment
KGW table row 230. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Additional Improvements; concessions, bleachers, r$1,393,267
Asset as named in source: East Delta Park
Build concession stand, bleachers and restroom for Strasser Field. Add security improvements ($.9M)
KGW table row 246. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park$675,161
Asset as named in source: Not specified
Replace existing HPS Field Lighting with LED Fixtures. Existing Poles to remain.. FIM Name: 09.01-0034 Baseball Field Lighting LED Conversion
KGW table row 219. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate the Roof of Administration building$376,772
Asset as named in source: Urban Forestry Office
Fix or replace the Roof that is rated 4 through buildings' assessment
KGW table row 227. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Field lighting$239,866
Asset as named in source: East Delta Park
Replace non-functional field lighting at outer fields at Owens Sports Complex
KGW table row 232. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Secure hanging fiberglass insulation$231,421
Asset as named in source: Maintenance Building
Problem: Fiberglass insulation of tool storage barn attached to naintenance building is falling. Rain water go through the roof, make the fiberglass wet and heavy, and tend to fall
Solution1 (Recommended): Fix the roof and replace the insulation
Solution2 (Temporary): Use steel strap to hold the fiberglass where there is potentially falling. Straps, screws and washers can be delivered to technicians in East Delta park rather than submit WO whenever there is problem
KGW table row 233. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park$220,947
Asset as named in source: Not specified
Replace existing HPS fixtures with LED fixtures. Existing poles to remain.. FIM Name: 09.02-0034 Soccer Field Lighting LED Conversion
KGW table row 234. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Renovation$196,098
Asset as named in source: East Delta Park
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
KGW table row 237. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Net and poles of play field$179,900
Asset as named in source: East Delta Park
- Repair/replace netting and poles at Owens Sports Complex
- The flaky paint and brittle netting is becoming a safety hazard
KGW table row 238. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Wooden bleachers$149,916
Asset as named in source: East Delta Park
Replace obsolete and non-compliant wooden bleachers at Strasser Field
KGW table row 240. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate Electrical and Mechanical Equipment$100,000
Asset as named in source: HQ, Owens complex, UF office
Electrical and mechanical equipment’s passed 25 year of service and need to replace.
KGW table row 241. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Playground renovation$78,302
Asset as named in source: Play Area A
Renovation or repair playground that was rated as 4
during playground assessment in 2020
KGW table row 216. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park$68,821
Asset as named in source: Not specified
East Delta Park - Retro commission all irrigation sprinkler systems and heads to ensure proper thrown and timing. Replace 10% of all rotary and spray heads.. FIM Name: 18.10-0034 Irrigation System Improvements
KGW table row 218. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Workspace- Interior building renovation$60,000
Asset as named in source: North District Headquarters, ID-70
Project components as below:
Improvement Type: Building, Category: Operations, Subcategory: NA, Description: Implement staggered shifts, Invest#: 70.07
Improvement Type: Building, Category: Health & Safety, Subcategory: Haz Mat Storage, Description: Provide ventilated Haz Mat storage and Safety Shower, Invest#: 70.04
Improvement Type: Building, Category: Health & Safety, Subcategory: Envelope Repair, Description: Repair roof and ceiling insulation, Invest#: 70.05
Improvement Type: Building, Category: MEP, Subcategory: Plumbing - Repair, Description: Repair showers?, Invest#: 70.06
Improvement Type: Building, Category: Envelope, Subcategory: NA, Description: Repair transluscent panels, Invest#: 70.08
Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Improve workspace configuration, Invest#: 70.03
KGW table row 220. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate North District HQ roof$58,802
Asset as named in source: East Delta Park
- The roof is in end of life cycle
- This project derived from Building assessment
KGW table row 223. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Workspace- Interior building renovation$40,000
Asset as named in source: Urban Forestry Office, ID-71
Project components as below:
Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Provide lockers?, Invest#: 71.04
Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Reconfigure workspaces, Invest#: 71.03
Improvement Type: Building, Category: Health & Safety, Subcategory: Envelope Repair, Description: Repair Roof and ceiling, Invest#: 71.05
Improvement Type: Building, Category: Wellness, Subcategory: Wellness room, Description: Wellness/Lactation Room, Invest#: 71.01
KGW table row 224. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Workspace- Parking area configuration$40,000
Asset as named in source: Parking lots
Project components:
Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking - Bike, Description: Bike Parking (OK to Share with Visitors), Invest#: 34.09
Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking , Description: Fleet Parking Allocation on Site , Invest#: 34.07
Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking, Description: FTE Parking Allocation on Site , Invest#: 34.08
Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking - Negotiate, Description: Negotiate Additional Parking, Invest#: 34.1
KGW table row 225. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Workspace- Safety and security$40,000
Asset as named in source: Property site
Project components:
Improvement Type: Site, Category: Safety, Subcategory: Security - Cameras, Description: Additional Cameras, Invest#: 34.04
Improvement Type: Site, Category: Safety, Subcategory: Security - Lighting, Description: Lighting by gate for saftey (24 hour staff), Invest#: 34.02
Improvement Type: Site, Category: Safety, Subcategory: Security - Gate, Description: New automatic gate with keyless entry, Invest#: 34.01
Improvement Type: Site, Category: Safety, Subcategory: Security - Fencing, Description: Upgraded Fencing, Invest#: 34.03
KGW table row 226. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Workspace- Interior building renovation$30,000
Asset as named in source: Urban Forestry Trailer, ID-76
Project components as below:
Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Furniture Solution for additional FTEs, Invest#: 76.01
Improvement Type: Building, Category: Renovation, Subcategory: NA, Description: Increase office and meeting areas, Invest#: 76.03
Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Provide Lockers, Invest#: 76.04
KGW table row 228. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Workspace- Interior and exterior building renovation$30,000
Asset as named in source: Modular Bldg, ID-1806
Project components:
Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Furniture Solution for additional FTEs, Invest#: 1806.01
Improvement Type: Building, Category: Storage - Outdoor, Subcategory: NA, Description: Provide additional exterior storage, Invest#: 1806.06
Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Provide Lockers, Invest#: 1806.05
KGW table row 229. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park$22,625
Asset as named in source: Not specified
For non-Musco field lights, an astronomical clock to keep field lights off until dusk/dark
For non-Musco field lights, dim at 10pm, off at 11
For non-Musco field lights, occupancy sensors to keep them on. FIM Name: 09.11-0034 Baseball Field Lighting Controls
KGW table row 235. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Install fencing in the front walkway at the delta sports office$21,869
Asset as named in source: Sport office
Install fencing in the front walkway at the delta sports office. talks still need to happen on what kind of fence
KGW table row 236. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park - Owens Sports Complex$15,589
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-1123 Building Interior Lighting LED Conversion
KGW table row 239. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park$10,606
Asset as named in source: Not specified
Refurbish existing well at East Delta Park via sonar-jet cleaning of well casing to disintegrate mineral and bacterial deposits.. FIM Name: 18.01-0034 Refurbish Existing Well
KGW table row 242. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Workspace- Provide ADA accessibility$10,000
Asset as named in source: Urban Forestry Trailer, ID-76
Improvement Type: Building, Category: Accessibility, Subcategory: ADA, Description: Provide ADA assessment, Invest#: 76.05
KGW table row 243. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park$9,899
Asset as named in source: Not specified
Install a GE control node on each pole that controls the light fixtures on that pole. Qty of 4 poles.. FIM Name: 09.12-0034 Soccer Field Lighting Controls
KGW table row 215. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park$7,890
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0034 Building Exterior Lighting LED Conversion
KGW table row 217. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park - Owens Sports Complex$6,592
Asset as named in source: Not specified
Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-1123 Building Exterior Lighting Controls
KGW table row 221. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park - Owens Sports Complex$3,809
Asset as named in source: Not specified
Tighten schedules and setpoints to match occupancy and maintain a 5F deadband between occupied heating and cooling setpoints.. FIM Name: 04.01-1123 DDC/Control System Optimization
KGW table row 231. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park$1,831
Asset as named in source: Not specified
Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0034 Building Exterior Lighting Controls
KGW table row 244. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park - Owens Sports Complex$1,528
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-1123 Building Exterior Lighting LED Conversion
KGW table row 245. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ East Delta Park - Owens Sports Complex$1,061
Asset as named in source: Not specified
Install Vending Misers vending machine plug load management system for (3x) cold drink machines at East Delta Owens Sports Complex.. FIM Name: 16.00-1123 Install Vending Misers
KGW table row 247. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.