ParksAtlas
East Columbia · District 2 · Very large park · 87 acres

East Delta Park

Developed parkPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: let my kids play, play on a field, and sit down to eat.

The participants of the 2018 Portland World Soccer Tournament at Delta ParkPhoto from the City's park page

Park history

Delta Park and the Portland International Raceway were built on the site of the city of Vanport City, which was destroyed by a flood in 1948. Prior to its destruction, Vanport was the second largest city in Oregon. Vanport was constructed in order to house the thousands of war-time shipbuilders that Henry Kaiser, of Henry Kaiser Industries, had recruited from New York to help with the war effort. Vanport, which was constructed in under a year, was deemed 'The Miracle City.' It had its own post office, nine schools, a fire station, a 400-seat cafeteria, a 785-seat theater, a library, a hospital, fourteen playgrounds, five commercial centers, and a police station staffed by twenty-two officers.

The problem with this instant city was that the quality of housing and building construction left much to be desired. On Sunday, May 30, 1948, just one day after the general manager of Vanport announced that the city was "not in any foreseeable danger" from rising flood waters, a segment of the ring-like dike surrounding the city collapsed. A 12-foot wall of water rushed through the community, wiping out all of the poorly-constructed houses. The residents were never officially notified that they were in danger.

Delta Park has been the site of quite a bit of controversy over the years. In 1964 there were some hotly contested plans to build a domed stadium in the park. Had the plans gone through, the stadium would have been the largest of its kind, with permanent seating for 60,000 and temporary seating up to 80,000. The plans were not approved and we now have a place for all sorts of outdoor activities.

Since June 1970, the site has been host to the Annual Delta Park Powwow and Encampment event on the third weekend in June. The annual event, organized and produced by the Bow & Arrow Culture Club, is a Portland tradition that draws Native American, and non-native participants and spectators from across the Pacific Northwest to enjoy intertribal dancing, cultural exhibitions, arts and craft vendors, fry bread and other delicious food. The event is a free and family-friendly celebration of Native American culture.

From the City's page for this park.

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…stay a while
…play
…compete
…get here and move

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Youth drop-in — Free unstructured play with somewhere for adults to sit.
  • Nature education — Environmental programs and guided walks.
  • All-weather indoor — Programming that survives a Portland winter.
One addition to investigate
  • Evening use — needs restroom
  • League play — needs restroom
  • Summer water play — needs splash pad or wading pool or all swimming pools or interactive fountain
  • Markets & festivals — needs restroom

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • walk or roll on pavement
  • sit down to eat
  • be in a park
  • let my kids play
  • play on a court
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • let my kids play
  • play on a field
  • play soccer
  • play ball
  • sit down to eat
  • be in a park
  • +3 more
    • play on a court
    • play volleyball
    • walk or roll on pavement
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • sit down to eat
  • be in a park
  • let my kids play
  • play on a court
  • play volleyball
  • play on a field
  • +3 more
    • play soccer
    • play ball
    • walk or roll on pavement
0 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • play on a field
  • sit down to eat
  • be in a park
  • let my kids play
  • play on a court
  • play volleyball
  • +3 more
    • play soccer
    • play ball
    • walk or roll on pavement
0 programs · 0 events starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
000
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
000
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

What's on

No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.

Reserve at East Delta Park

This park has facilities you can reserve. Booking happens on the city's official systems — every link below goes straight there.

Partners & friends

The whole ecosystem
Opportunity signal

No known partner is currently linked to East Delta Park in the Partnership Atlas. This is an opportunity signal, not an official priority.

See opportunity signals

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

East Delta Park

$14.2M

33 distinct source rows. Proposed repair and improvement costs, not a current funding gap.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

What the estimates cover

Courts, fields & golf$6M
Roofs & buildings$4.6M
Other / mixed scope$1.8M
Energy & building systems$1.4M
Play & gathering$258.2K
Paths & access$206.1K
Parking & site infrastructure$21.9K

Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.

The work, cost & reason (33 source rows)
Replace sport field surface$6,000,000

Asset as named in source: sport field

Recurrence project to replace sport field turf every 10 years

KGW table row 222. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate the Roof of Maintenance - Storage building$3,925,991

Asset as named in source: Urban Forestry Barn

Fix or replace the Roof that is rated 4 through buildings' assessment

KGW table row 230. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Additional Improvements; concessions, bleachers, r$1,393,267

Asset as named in source: East Delta Park

Build concession stand, bleachers and restroom for Strasser Field. Add security improvements ($.9M)

KGW table row 246. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park$675,161

Asset as named in source: Not specified

Replace existing HPS Field Lighting with LED Fixtures. Existing Poles to remain.. FIM Name: 09.01-0034 Baseball Field Lighting LED Conversion

KGW table row 219. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate the Roof of Administration building$376,772

Asset as named in source: Urban Forestry Office

Fix or replace the Roof that is rated 4 through buildings' assessment

KGW table row 227. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Field lighting$239,866

Asset as named in source: East Delta Park

Replace non-functional field lighting at outer fields at Owens Sports Complex

KGW table row 232. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Secure hanging fiberglass insulation$231,421

Asset as named in source: Maintenance Building

Problem: Fiberglass insulation of tool storage barn attached to naintenance building is falling. Rain water go through the roof, make the fiberglass wet and heavy, and tend to fall Solution1 (Recommended): Fix the roof and replace the insulation Solution2 (Temporary): Use steel strap to hold the fiberglass where there is potentially falling. Straps, screws and washers can be delivered to technicians in East Delta park rather than submit WO whenever there is problem

KGW table row 233. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park$220,947

Asset as named in source: Not specified

Replace existing HPS fixtures with LED fixtures. Existing poles to remain.. FIM Name: 09.02-0034 Soccer Field Lighting LED Conversion

KGW table row 234. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Pathway Renovation$196,098

Asset as named in source: East Delta Park

Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

KGW table row 237. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Net and poles of play field$179,900

Asset as named in source: East Delta Park

- Repair/replace netting and poles at Owens Sports Complex - The flaky paint and brittle netting is becoming a safety hazard

KGW table row 238. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Wooden bleachers$149,916

Asset as named in source: East Delta Park

Replace obsolete and non-compliant wooden bleachers at Strasser Field

KGW table row 240. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate Electrical and Mechanical Equipment$100,000

Asset as named in source: HQ, Owens complex, UF office

Electrical and mechanical equipment’s passed 25 year of service and need to replace.

KGW table row 241. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Playground renovation$78,302

Asset as named in source: Play Area A

Renovation or repair playground that was rated as 4 during playground assessment in 2020

KGW table row 216. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park$68,821

Asset as named in source: Not specified

East Delta Park - Retro commission all irrigation sprinkler systems and heads to ensure proper thrown and timing. Replace 10% of all rotary and spray heads.. FIM Name: 18.10-0034 Irrigation System Improvements

KGW table row 218. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Workspace- Interior building renovation$60,000

Asset as named in source: North District Headquarters, ID-70

Project components as below: Improvement Type: Building, Category: Operations, Subcategory: NA, Description: Implement staggered shifts, Invest#: 70.07 Improvement Type: Building, Category: Health & Safety, Subcategory: Haz Mat Storage, Description: Provide ventilated Haz Mat storage and Safety Shower, Invest#: 70.04 Improvement Type: Building, Category: Health & Safety, Subcategory: Envelope Repair, Description: Repair roof and ceiling insulation, Invest#: 70.05 Improvement Type: Building, Category: MEP, Subcategory: Plumbing - Repair, Description: Repair showers?, Invest#: 70.06 Improvement Type: Building, Category: Envelope, Subcategory: NA, Description: Repair transluscent panels, Invest#: 70.08 Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Improve workspace configuration, Invest#: 70.03

KGW table row 220. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate North District HQ roof$58,802

Asset as named in source: East Delta Park

- The roof is in end of life cycle - This project derived from Building assessment

KGW table row 223. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Workspace- Interior building renovation$40,000

Asset as named in source: Urban Forestry Office, ID-71

Project components as below: Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Provide lockers?, Invest#: 71.04 Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Reconfigure workspaces, Invest#: 71.03 Improvement Type: Building, Category: Health & Safety, Subcategory: Envelope Repair, Description: Repair Roof and ceiling, Invest#: 71.05 Improvement Type: Building, Category: Wellness, Subcategory: Wellness room, Description: Wellness/Lactation Room, Invest#: 71.01

KGW table row 224. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Workspace- Parking area configuration$40,000

Asset as named in source: Parking lots

Project components: Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking - Bike, Description: Bike Parking (OK to Share with Visitors), Invest#: 34.09 Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking , Description: Fleet Parking Allocation on Site , Invest#: 34.07 Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking, Description: FTE Parking Allocation on Site , Invest#: 34.08 Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking - Negotiate, Description: Negotiate Additional Parking, Invest#: 34.1

KGW table row 225. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Workspace- Safety and security$40,000

Asset as named in source: Property site

Project components: Improvement Type: Site, Category: Safety, Subcategory: Security - Cameras, Description: Additional Cameras, Invest#: 34.04 Improvement Type: Site, Category: Safety, Subcategory: Security - Lighting, Description: Lighting by gate for saftey (24 hour staff), Invest#: 34.02 Improvement Type: Site, Category: Safety, Subcategory: Security - Gate, Description: New automatic gate with keyless entry, Invest#: 34.01 Improvement Type: Site, Category: Safety, Subcategory: Security - Fencing, Description: Upgraded Fencing, Invest#: 34.03

KGW table row 226. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Workspace- Interior building renovation$30,000

Asset as named in source: Urban Forestry Trailer, ID-76

Project components as below: Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Furniture Solution for additional FTEs, Invest#: 76.01 Improvement Type: Building, Category: Renovation, Subcategory: NA, Description: Increase office and meeting areas, Invest#: 76.03 Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Provide Lockers, Invest#: 76.04

KGW table row 228. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Workspace- Interior and exterior building renovation$30,000

Asset as named in source: Modular Bldg, ID-1806

Project components: Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Furniture Solution for additional FTEs, Invest#: 1806.01 Improvement Type: Building, Category: Storage - Outdoor, Subcategory: NA, Description: Provide additional exterior storage, Invest#: 1806.06 Improvement Type: Building, Category: Interior, Subcategory: Furnishings, Description: Provide Lockers, Invest#: 1806.05

KGW table row 229. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park$22,625

Asset as named in source: Not specified

For non-Musco field lights, an astronomical clock to keep field lights off until dusk/dark For non-Musco field lights, dim at 10pm, off at 11 For non-Musco field lights, occupancy sensors to keep them on. FIM Name: 09.11-0034 Baseball Field Lighting Controls

KGW table row 235. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Install fencing in the front walkway at the delta sports office$21,869

Asset as named in source: Sport office

Install fencing in the front walkway at the delta sports office. talks still need to happen on what kind of fence

KGW table row 236. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park - Owens Sports Complex$15,589

Asset as named in source: Not specified

Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-1123 Building Interior Lighting LED Conversion

KGW table row 239. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park$10,606

Asset as named in source: Not specified

Refurbish existing well at East Delta Park via sonar-jet cleaning of well casing to disintegrate mineral and bacterial deposits.. FIM Name: 18.01-0034 Refurbish Existing Well

KGW table row 242. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Workspace- Provide ADA accessibility$10,000

Asset as named in source: Urban Forestry Trailer, ID-76

Improvement Type: Building, Category: Accessibility, Subcategory: ADA, Description: Provide ADA assessment, Invest#: 76.05

KGW table row 243. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park$9,899

Asset as named in source: Not specified

Install a GE control node on each pole that controls the light fixtures on that pole. Qty of 4 poles.. FIM Name: 09.12-0034 Soccer Field Lighting Controls

KGW table row 215. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park$7,890

Asset as named in source: Not specified

Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0034 Building Exterior Lighting LED Conversion

KGW table row 217. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park - Owens Sports Complex$6,592

Asset as named in source: Not specified

Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-1123 Building Exterior Lighting Controls

KGW table row 221. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park - Owens Sports Complex$3,809

Asset as named in source: Not specified

Tighten schedules and setpoints to match occupancy and maintain a 5F deadband between occupied heating and cooling setpoints.. FIM Name: 04.01-1123 DDC/Control System Optimization

KGW table row 231. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park$1,831

Asset as named in source: Not specified

Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0034 Building Exterior Lighting Controls

KGW table row 244. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park - Owens Sports Complex$1,528

Asset as named in source: Not specified

Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-1123 Building Exterior Lighting LED Conversion

KGW table row 245. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ East Delta Park - Owens Sports Complex$1,061

Asset as named in source: Not specified

Install Vending Misers vending machine plug load management system for (3x) cold drink machines at East Delta Owens Sports Complex.. FIM Name: 16.00-1123 Install Vending Misers

KGW table row 247. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗

33 of 331 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

A complete annual cost is not yet available.

This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 2

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
823
Households within a half mile
527

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
41
Closed backlog IDs
13

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
0

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

Agreement on record

A lease, license, permit or similar agreement names this property. It may be a utility easement rather than park work.

  • Portland Metro Softball Association (PMSA) · Use Agreement, Mar 4, 2026 to Mar 3, 2029PMSA Office Sapce at East Delta Park

From the department-provided partnership directory. It records what is on paper, not who does each task. Each agreement links to its entry on PP&R's agreements with partners, with the public text where it's posted, how to request it where it isn't, and the rules that govern partnerships.

Condition across all assets

Citywide condition atlas

Across 331 assessed assets at this park, 10% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 18Above fair · 119Fair · 161Poor · 27Very bad · 6
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Buildings2018Fences2022Pathways & trailsPlayground equipment2020Sport fieldsSport courts

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.

AssetConditionStatusReplacementAssessed
Permanent Bollard
Condition rated poor (code 4). Priority high.
Record 538
Poor condition
code 4
Activeno2007-08-07
Bleacher
Condition rated poor (code 4). Priority high.
Record 1334
Poor condition
code 4
Activeno2007-08-07
Picnic Table
Condition very bad. Priority urgent.
Record 2075
Very bad condition
code 5
Activeno2007-08-07
Bleacher
Condition rated poor (code 4). Priority high.
Record 2847
Poor condition
code 4
Activeno2007-08-07
Picnic Table
Condition rated poor (code 4). Priority high.
Record 3287
Poor condition
code 4
Activeno2007-08-07
Bleacher
Condition rated poor (code 4). Priority high.
Record 3566
Poor condition
code 4
Activeno2007-08-07
Picnic Table
Condition rated poor (code 4). Priority high.
Record 4259
Poor condition
code 4
Activeno2007-08-07
Picnic Table
Condition rated poor (code 4). Priority high.
Record 5685
Poor condition
code 4
Activeno2007-08-07
Permanent Bollard
Condition rated poor (code 4). Priority high.
Record 6034
Poor condition
code 4
Activeno2007-08-07
Picnic Table
Condition rated poor (code 4). Priority high.
Record 7139
Poor condition
code 4
Activeno2007-08-07
Drinking Fountain
Condition rated poor (code 4). Priority high.
Record 0034-DF-2
Poor condition
code 4
Activeno2007-08-07
Picnic Table
Condition rated poor (code 4). Priority high.
Record 8259
Poor condition
code 4
Activeno2007-08-07
Bleacher
Condition rated poor (code 4). Priority high.
Record 8550
Poor condition
code 4
Activeno2007-08-07
Bleacher
Condition rated poor (code 4). Priority high.
Record 8694
Poor condition
code 4
Activeno2007-08-07
Showing all 14 public repair candidates.
Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 114

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Permanent Trash Can×27
3×62×21
Picnic Table×26
5×14×53×20
Bleacher×20
4×53×52×9–×1
Bench×14
2×111×3
Score Board×7
1321111
Flag Pole×6
––––––
Drinking Fountain×4
3234
Litter Bag Dispenser×3
232
Permanent Bollard×3
442
Bike Rack×2
22
Kiosk×1
2
Memorial×1
1
Official Portland.gov profile

From the City's park page

Delta Park on Portland.gov

Open official page

Delta Park is the largest public municipal sports complex in Portland. Since 1970, Delta Park is home to the longest running Powwow west of the Mississippi River.

The 2025 Delta Park Powwow and Encampment will be held Friday, June 13 - Sunday, June 15, 2025. More details will be added here as they are available.

Thank you to the enormous cast of volunteers who help make the Delta Park Powwow and Encampment happen each year.

Welcome to the Annual City of Roses Delta Park Powwow and Encampment. The annual event, organized and produced by the Bow & Arrow Culture Club, is a Portland tradition that draws Native American, and non-native participants and spectators from across the Pacific Northwest to enjoy intertribal dancing, cultural exhibitions, arts and craft vendors, fry bread, and other delicious food.

City label
Park
Year acquired
1950
Official acres
87.466
City section
North
Neighborhood
East Columbia
Location

N Denver Avenue and Martin Luther King Jr Blvd Portland, OR 97217

Directions
Hours

Park hours: 6am to 10pm To reserve a sports field, call 503-823-2525

Amenities and activities
Picnic tablePlaygroundPaths (paved)Soccer fieldSoftball fieldSynthetic turfVolleyball court

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/east-delta-park-34?utm_source=park_qr&utm_medium=sign&utm_campaign=park_34

Where this comes from

Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.