The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.
Classification and evidence
Official page label: Park; Atlas classification rules. Classification: inferred.
Source captured: 2026-06-02. Human verification: Pending.
Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.
Enabling assets recorded
Youth drop-in— Free unstructured play with somewhere for adults to sit.
Nature education— Environmental programs and guided walks.
One addition to investigate
Evening use— needs park lighting
League play— needs any sport field or any sport court
Summer water play— needs splash pad or wading pool or all swimming pools or interactive fountain
All-weather indoor— needs indoor space or community center or arts or cultural center or gymnasium
Markets & festivals— needs plaza or terrace or paved path
Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.
What else should this park let you do?
Something specific to this park — the thing you'd use it for if it were here.
Public school grounds within a half mile, by straight line. What is listed is what OpenStreetMap mappers have recorded, not an inventory. The district sets public access.
Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.
Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.
Winter
Dec–Feb
Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.
use a restroom
find a published trail
use an accessible restroom
sit down to eat
be in a park
skate
+2 more
ride a bike
walk a soft path
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May
Fields and gardens open; showers between sun. Leagues, planting, first picnics.
walk a soft path
find a published trail
use a restroom
use an accessible restroom
sit down to eat
be in a park
+2 more
skate
ride a bike
0 programs · 0 events starts captured
Summer
Jun–Aug
Water, shade, long evenings — the season the system is built around.
sit down to eat
use a restroom
use an accessible restroom
be in a park
skate
ride a bike
+2 more
walk a soft path
find a published trail
0 programs · 0 events starts captured
Fall
Sep–Nov
Light shortens and leagues wind down; shelters and lighting carry the season.
use a restroom
find a published trail
use an accessible restroom
sit down to eat
be in a park
skate
+2 more
ride a bike
walk a soft path
0 programs · 0 events starts captured
What the record holds here, by season
Season
Programs
Recurring events
One-time
Winter Dec–Feb
Not yet published
—
—
—
Spring Mar–May
Recorded from 2026-06-11
0
0
0
Summer Jun–Aug
Recorded from 2026-06-11
0
0
0
Fall Sep–Nov
Recorded from 2026-06-11
0
0
0
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 17 weekly catalog snapshots (2026-06-11 to 2026-11-02). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-11; later months fill in as registration opens. Winter counts fill in when winter registration opens.
What's on
No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.
Story
History, context and plans
Aspirational projects · what a park group wants here
Help people find Gateway Green, and give them reasons to stay
Proposed by Friends of Gateway Green · Building programs and asking for small fixes, as of October 2026
Gateway Green's last phase opened in October 2024. Friends of Gateway Green, the volunteers who helped design and fund it, now want it to work for whole families, not only riders: easy to find, comfortable on a hot afternoon, and used by youth groups from nearby East Portland neighborhoods. Most of what they ask for is small: signs, shade, power, a repair stand. The hard parts, they say, are building ties with the groups that serve young people nearby and getting people to make a first trip.
This is the group's plan, not PP&R's, and nothing here is funded or approved. The Atlas lists it so anyone can see what the group wants and what it still needs.
The plan, step by step
1Make the park easy to find. Signs in the park and wayfinding to it. The group says the park is hard to find, and that the walk in is long enough that Summer Free For All turned down an event there.
2Fill the gaps in the finished park. Shade, reliable power at the hub and a few small facilities, listed below.
3Bring in groups that don't ride. The group doesn't see itself as a major program provider. It wants to help youth organizations use the park, with permits, service-road access, publicity and bike coaches, and to add events that aren't about bikes in 2027.
What the group still needs
Upkeep for the natural areasAbout 10 of the park's 25 acres are wooded. In the group's view, the natural areas, especially the native plantings along the spine trail, need more care than they get.
A renewed agreement with PP&RThe group's written agreement from about 2015 covered designing and paying for construction. A follow-on draft stalled after PP&R staff changes.
Relationships with youth groups nearbyThe group says the neighborhoods closest to the park have a higher share of low-income families, immigrants and people of color than much of the city. For the past couple of years it has focused on building ties with the organizations that serve their young people, which it says takes sustained effort.
Realistic limitsThere's no room for a sports field, indoor space is very unlikely, and a water feature would be hard because the park runs on its own well and septic system.
What the group wants built
ShadeA shade structure was dropped from the original plan to save money, so there is little afternoon shade until the new trees grow.
A reliable outlet at the hubEvent power near the hub seating. The outlet there often fails, and the ones on the north lawn are too far away.
A bike repair stationA simple one. The open question is how to protect it from vandalism.
A staffed kioskSomeday, an attendant renting or lending bikes and helmets and game equipment like volleyballs, and selling drinks, snacks and park merchandise, so people can come without their own gear.
A shelter, evening lights and a dirt boxWorth exploring, the group says. The hub already has a packed-gravel plaza that festivals use.
A link to Rocky ButteThe original dream: an under- or overpass across I-205 to trails and viewpoints on Rocky Butte. Still alive, the group says, though not achievable anytime soon.
A MAX stop at the hubSome basic groundwork for a station went in when the MAX Red Line was built. The group was told it would have to show enough riders to justify the stop and pay to build it, so this one is a long shot.
Other ways inA bike-taxi shuttle from Gateway Shopping Center on event days, and someday a walking trail through the wooded part of the park.
Who's behind it
Friends of Gateway Green formed in 2009, raised more than $100,000 in crowdfunding in 2013 and about $90,000 in 2016, and has no paid staff. Northwest Trail Alliance maintains the bike features under contract, and the Friends hold warm-season cleanups and a BMX Day every July since 2023.
Community organizations that steward, fund, operate, or run programs at Gateway Green. Labels show what is confirmed and what is still being filled in.
Friends of Gateway GreenStewards this parkConfirmed
Northwest Trail AllianceStewards this parkConfirmed
Programmatic nonprofits
Maintains and stewards the park’s off-road cycling facilities under a formal agreement with PP&R. The City’s partnership directory lists the agreement from March 2021 to August 2026.
Ways to help Portland's parks, Gateway Green among them. This site does not process donations; every link below goes to the organization's own giving or volunteering page.
The City’s own inventory of what is here and the condition it last recorded for each item.
Dates are the source’s; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates are separate from these condition records.
Across 4 assessed assets at this park, 0% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.
This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.
Good · 4Above fair · 0Fair · 0Poor · 0Very bad · 0
Assessed asset families here
Buildings2018Playground equipment2020
Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.
Repair ledgerNo repair candidates flagged in public data
Public data does not currently flag repair candidates for this park. Additional PP&R maintenance exports can be added without changing the page structure.
Know this park?
Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.
Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.
This park in its districtThe same public records, read the same way for every property
District picture · District 3
This park in the district picture
The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.
People nearby
Residents within a half mile
6,539
Households within a half mile
2,771
2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.
Recorded backlog
Open backlog IDs
1
Closed backlog IDs
1
Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.
Active capital projects
Active geocoded projects
0
Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.
Who is on record
Stewardship group on record
A conservancy, friends group or stewardship partner is on record here. The split of tasks between staff and volunteers is not published.
Northwest Trail Alliance · Stewardship Agreement, Mar 3, 2021 to Aug 28, 2026Off-road cycling facilities maintenance
Union Pacific Railroad · Lease, from Aug 23, 2021, no end dateUPRR Lease 03211-80 at Gateway Green
Partners at assets here: Northwest Trail Alliance (stewardship)
From the department-provided partnership directory. It records what is on paper, not who does each task. Each agreement links to its entry on PP&R's agreements with partners, with the public text where it's posted, how to request it where it isn't, and the rules that govern partnerships.
Gateway Green Park provides much-needed off-road cycling and outdoor recreation opportunities in East Portland. Now accessible directly by public transit, there's a system of soft-surface and paved multi-use trails to explore the unique site and connect to the regional trail and cycling network.
Gateway Green trails and pump tracks are open for use during regular park hours (5am to 9pm). Please ride conscientiously and avoid damaging trails. Please do not ride wet or soft soil trails until they heal from recent construction.
This park is car-free! Access Gateway Green along the I-205 bike and pedestrian path, between Maywood Park and the Gateway Transit Center. The only public access points are by bike or foot along this path. Visitors should plan on a quarter to half a mile walk, roll, or ride along the I-205 Trail. Walkers and bicycle riders can reach the site via the Hub entry, on the eastern side of the park near the Pump Track. Walkers and bicycle riders can reach the site via the Hub entry, on the eastern side of the park near the Pump Track.
Dogs are required to be on a leash at all times in the park.
City label
Park
Year acquired
2014
Official acres
25.267
City section
East
Neighborhood
Madison South
Location
Along I-205 bike and pedestrian path Portland, OR 97220
Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.