ParksAtlas
Pearl District · District 4 · Plaza or memorial · 0.9 acres

Jamison Square

Plaza or memorialPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: use a restroom, use an accessible restroom, and meet in a public square.

Hours
5:00am-midnight
Getting there
810 NW 11th Avenue Portland, OR 97209
Dogs
Dogs on leash
Access
Accessible restroom
Jamison Square SignPhoto from the City's park page

Park history

From the beginning of the planning efforts for the Pearl District in the early 1990s, the creation of a network of open spaces was an important goal of both the neighborhood and the City. In 1998, a conceptual plan for the new parks and open spaces was proposed by the Tanner Creek & Water Feature Steering Committee and approved by City Council. Those recommendations served as a point of departure for planning the district's parks.

In June 1999, Peter Walker & Partners, a landscape architecture firm, was retained to provide concepts for three new parks between Tenth and Eleventh Avenues in the River District. They developed and refined plans for the parks with input from a Project Steering Committee and two public workshops. The final plan is characterized by a series of recurring elements that strengthen the connection between each of the three parks.

Located between NW Johnson and Kearney, Jamison Square was the first to be developed. It is named in honor of William Jamison, whose presence was pivotal in the development of the River District. He was an exceptional person in his ability to influence and connect with a wide variety of people. His personal magnetism, in addition to the size and scope of his art gallery, drew many people into the Pearl District.

The focal point of the park is a fountain which simulates a shallow tidal pool. Water cascades from stone joints into low pools as the fountain continuously recirculates treated water with energy-efficient pumps and motors. Along the edge of the park, are four 30-foot-tall sculptures covering the streetcar catenary poles; the Tikitotemoniki Totems, also known as Tiki Totems, were created by artist Kenny Scharf. Another art installation in the park is Contact II, the 1972 metal sculpture by Alexander Liberman that was donated to the City of Portland in 2002 by Ed Cauduro in memory of his parents.

From the City's page for this park.

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…stay a while
…gather
…cool off
…get here and move
…remember and belong

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Evening use — Programming after dusk — leagues, classes, walks.
  • Gatherings & events — Concerts, movies, cultural events.
  • Summer water play — Cooling and swim programs.
  • Nature education — Environmental programs and guided walks.
  • Markets & festivals — Vendor events and neighborhood festivals.
One addition to investigate

No single-addition candidate passes this preliminary screen.

Outside the size-and-type screen for this 0.9-acre park property: play in a league (any sport field or any sport court); let my kids play while I sit (playground); be inside when it rains (indoor space or community center or arts or cultural center or gymnasium).

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

School grounds nearby

Public school grounds within a half mile, by straight line. What is listed is what OpenStreetMap mappers have recorded, not an inventory. The district sets public access.

  • Scuola Italiana · Portland Public Schools · 0.9 acres
    0.4 mi

    Nothing recorded inside the grounds yet.

Beyond parks explains what opening a school ground would take.

School grounds: Metro RLIS. Features inside them: © OpenStreetMap contributors (ODbL).

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • use a restroom
  • use an accessible restroom
  • meet in a public square
  • be in a park
  • sit by a fountain
  • see public art
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • use a restroom
  • use an accessible restroom
  • meet in a public square
  • be in a park
  • splash in a fountain
  • sit by a fountain
  • +1 more
    • see public art
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • use a restroom
  • use an accessible restroom
  • meet in a public square
  • be in a park
  • splash in a fountain
  • sit by a fountain
  • +1 more
    • see public art
0 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • use a restroom
  • use an accessible restroom
  • meet in a public square
  • be in a park
  • splash in a fountain
  • sit by a fountain
  • +1 more
    • see public art
0 programs · 0 events starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
010
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
000
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

What's on

No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.

Partners & friends

The whole ecosystem
Opportunity signal

No known partner is currently linked to Jamison Square in the Partnership Atlas. This is an opportunity signal, not an official priority.

See opportunity signals

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

Jamison Square

$23.8K

2 distinct source rows. Proposed repair and improvement costs, not a current funding gap.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

What the estimates cover

Energy & building systems$23.8K

Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.

The work, cost & reason (2 source rows)
Replace Backflow preventer device$12,000

Asset as named in source: Property

- Replace two out of compliance backflow preventers - Assembly: Double Check Valve Assembly (DCVA) - Premises Isolation (PI): 2" Reduced Pressure (RP)+ Enclosure. Serial # KR557, IZ322 - Move to property line, if needed - Hazard: Aquatics

KGW table row 490. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-III_Buildings Lighting to LEDs$11,760

Asset as named in source: Restroom - Loo

LED conversion for Exterior and Interior Lights

KGW table row 491. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗

0 of 53 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

A complete annual cost is not yet available.

This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 4

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
18,071
Households within a half mile
13,742

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
1
Closed backlog IDs
1

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
0

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

No partner agreement on record

The department-provided directory names no agreement here. Friends groups without a formal agreement are not captured.

From the department-provided partnership directory. It records what is on paper, not who does each task.

Condition across all assets

Citywide condition atlas

Across 53 assessed assets at this park, 0% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 2Above fair · 48Fair · 3Poor · 0Very bad · 0
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Buildings2018Pathways & trails

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Public data does not currently flag repair candidates for this park. Additional PP&R maintenance exports can be added without changing the page structure.

Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 51

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Bench×35
2×35
Art Work×5
–––––
Bike Rack×5
22212
Permanent Trash Can×4
2222
Drinking Fountain×1
2
Litter Bag Dispenser×1
1
Official Portland.gov profile

From the City's park page

Jamison Square on Portland.gov

Open official page

Jamison Fountain is on for the season and will remain in operation until early fall.

City label
Park
Year acquired
2000
Official acres
0.941
City section
Downtown
Neighborhood
Pearl District
Location

810 NW 11th Avenue Portland, OR 97209

Directions
Hours

Park hours: 5:00am-midnight

Amenities and activities
Accessible restroomPlazaStatue or public artFountainFountain (interactive)

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/jamison-square-1140?utm_source=park_qr&utm_medium=sign&utm_campaign=park_1140

Where this comes from

Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.