ParksAtlas
Portland Downtown · District 4 · Plaza or memorial · 1.1 acres

Lovejoy Fountain

Plaza or memorialPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: walk or roll on pavement, meet in a public square, and be in a park.

Lovejoy Fountain ParkPhoto from the City's park page

Park history

This park is named for Asa Lawrence Lovejoy, one of the first owners of the Portland townsite. He and Francis W. Pettygrove took part in the famous coin flip which decided whether the name of the new frontier town would be Portland or Boston. Pettygrove, from Portland, Maine won. Lovejoy was the director of Oregon's first telegraph company and was an active participant in railroad development in the Willamette Valley.

Lovejoy Fountain Park, along with Pettygrove Park, is in what was known in the 1960s as the 'urban renewal area.' The same coin that Mr. Lovejoy and Mr. Pettygrove used to determined whether our city would be called Portland or Boston was flipped to determine which park would be Lovejoy and which would be Pettygrove.

The Lovejoy Fountain was designed by Lawrence Halprin, the well-known San Franciscan architect. The concrete fountain was installed in 1966. "The fountain wonderfully captures the spirit of Oregon's streams. Pouring in a sheet over the lip of the upper pool, the water is whipped into a foaming cascade as it splashes down over an irregular series of stairsteps and then out again into a placid lower basin." (The Oregonian, 7/28/66)

From the City's page for this park.

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…gather
…cool off
…get here and move

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Nature education — Environmental programs and guided walks.
One addition to investigate
  • Summer water play — needs splash pad or interactive fountain
  • Markets & festivals — needs restroom

Outside the size-and-type screen for this 1.1-acre park property: let my kids play while I sit (playground); be inside when it rains (indoor space or community center or arts or cultural center or gymnasium).

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

School grounds nearby

Public school grounds within a half mile, by straight line. What is listed is what OpenStreetMap mappers have recorded, not an inventory. The district sets public access.

  • Emerson School · Portland Public Schools · 1.4 acres
    0.1 mi

    Nothing recorded inside the grounds yet.

  • 0.3 mi

    Nothing recorded inside the grounds yet.

Beyond parks explains what opening a school ground would take.

School grounds: Metro RLIS. Features inside them: © OpenStreetMap contributors (ODbL).

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • walk or roll on pavement
  • meet in a public square
  • be in a park
  • sit by a fountain
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • meet in a public square
  • be in a park
  • sit by a fountain
  • walk or roll on pavement
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • meet in a public square
  • be in a park
  • sit by a fountain
  • walk or roll on pavement
0 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • meet in a public square
  • be in a park
  • sit by a fountain
  • walk or roll on pavement
0 programs · 0 events starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
000
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
000
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

What's on

No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.

Partners & friends

The whole ecosystem

Community organizations that steward, fund, operate, or run programs at Lovejoy Fountain. Labels show what is confirmed and what is still being filled in.

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

Lovejoy Fountain

Not available

No historical estimate matched to this property. This does not mean no repair needs.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

2 of 12 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

A complete annual cost is not yet available.

This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 4

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
10,332
Households within a half mile
7,256

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
1
Closed backlog IDs
0

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
0

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

Stewardship group on record

A conservancy, friends group or stewardship partner is on record here. The split of tasks between staff and volunteers is not published.

  • Halprin Landscape Conservancy · Stewardship Agreement, Apr 1, 2022 to May 31, 2027Stewardship of Portland Open Space Sequence

Partners at assets here: Halprin Landscape Conservancy (stewardship)

From the department-provided partnership directory. It records what is on paper, not who does each task. Each agreement links to its entry on PP&R's agreements with partners, with the public text where it's posted, how to request it where it isn't, and the rules that govern partnerships.

Condition across all assets

Citywide condition atlas

Across 12 assessed assets at this park, 17% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 0Above fair · 2Fair · 8Poor · 1Very bad · 1
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Buildings2018Pathways & trails

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.

AssetConditionStatusReplacementAssessed
Drinking Fountain
Replacement field says yes. Priority urgent.
Record 1979
Very bad condition
code 5
Activeyesnot published
Showing all 1 public repair candidates.
Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 8

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Bench×4
3323
Permanent Trash Can×3
23–
Drinking Fountain×1
5
Official Portland.gov profile

From the City's park page

Lovejoy Fountain Park on Portland.gov

Open official page

Learn more about closures and postponements related to the COVID-19 pandemic response.

A project of the Halprin Landscape Conservancy

City label
Park
Year acquired
1963
Official acres
1.108
City section
Downtown
Neighborhood
Portland Downtown
Location

SW 3rd Avenue and Harrison Street Portland, OR 97204

Directions
Hours

Park hours: 5:00am-midnight

Amenities and activities
PlazaPaths (paved)Fountain

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/lovejoy-fountain-242?utm_source=park_qr&utm_medium=sign&utm_campaign=park_242

Where this comes from

Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.