Renovate Tennis sport court at Mt Scott Park$1,033,221
Asset as named in source: Tennis Court
Fix or replace the Asphalt surface of the court that is rated 4 through courts' assessment
KGW table row 708. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate sport field$545,473
Asset as named in source: Ball Field 1
Sport fields rated 4 or 5 in condition assessment
KGW table row 700. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pool Filter Replacement$352,277
Asset as named in source: Mt Scott Community Center & Pool
Description:
- Filter needs to be replaced due to age and ability to maintain. Would like it to be replaced with a Defender Filter.
- The leisure pool filters are undersized and need to be replaced. Currently filters need to be backwashed twice a day to keep them operational, an expensive use of water and labor.
Location: Pool Mechanical Room
Alt Contact: Andy Amato
KGW table row 701. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pool Shell Replaster$264,415
Asset as named in source: Mt Scott Community Center & Pool
This is Recurrence paroject that due every 10. Mt Scott pool will need to be replastered on or before 2027. See Project phases
KGW table row 702. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace old HVAC system$238,883
Asset as named in source: Mt. Scott Community Center & Pool
Placeholder: replace HVAC system that was installed before 2000
KGW table row 704. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Renovation$107,189
Asset as named in source: Mt Scott Park
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
KGW table row 707. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Change light poles base connection$58,140
Asset as named in source: Light poles
Case: Some light poles are connected to the footing by steel wires that deteriorating over time because of water/moisture influence. Additionally , these bases are not designed for lateral loads produced by wind and other tension equipment.
Proposal: replace wire type connection by other type that resist coded lateral loads and more durable against environmental effects
Number of poles is 19 approximately with estimated cost $3000/ pole.
KGW table row 699. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace Backflow preventer device$24,000
Asset as named in source: Property
- Replace out of compliance backflow preventers
- Assembly: Double Check Valve Assembly (DCVA)
- Move to property line, if needed
- Hazard: ROW and Aquatics
- See components for detail
KGW table row 703. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-III_Buildings Lighting to LEDs$11,760
Asset as named in source: Community Center & Pool
LED conversion for Exterior and Interior Lights
KGW table row 705. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-III_Buildings Lighting to LEDs$11,760
Asset as named in source: Restroom
LED conversion for Exterior and Interior Lights
KGW table row 706. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗