Seismic / Structural$9,288,448
Asset as named in source: Overlook House Community Center
Seismic upgrades of unreinforced masonry units
KGW table row 784. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate the Roof of Community Center building$1,442,495
Asset as named in source: Overlook Community Center
Fix or replace the Roof that is rated 4 through buildings' assessment
KGW table row 791. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Lead/asbestos remediation$80,997
Asset as named in source: Community Center
Lead/asbestos remediation
KGW table row 785. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Exterior damage/repairs$57,855
Asset as named in source: Community Center
Original request: Exterior damage/repairs (windows/stucco/siding/other)
WO request:
- Upstairs windows on the South and West face of the building have significant rot and are difficult/dangerous to open and close. Please review for repair or replacement. Section 4 G of lease agreement
- Upstairs back door to spiral staircase the glass relite gasket has failed allowing moisture to be trapped in the glass. Door has no weather stripping and moisture has been found inside the building during heavy rain events. Section 4 G of the lease agreement
KGW table row 786. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Basement water intrusion$46,284
Asset as named in source: Community Center
Basement water intrusion
KGW table row 787. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace old HVAC system$20,154
Asset as named in source: Overlook Community Center
Placeholder: replace HVAC system that was installed before 2000
KGW table row 788. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace wooden fence$20,000
Asset as named in source: Community Center
Problem
- The entire wooden fence along the East frontage of the property is rotted and a large segment fell down in the last wind storm.
- This is a huge safety issue as the property drops off to a ravine immediately behind this fence.
- Most posts failed and diagonal braced to prevent further collapsing
- About 40% of boards are rotten
- The gate is fully deteriorated
- Tree branches affect some posts
- According to overlook house coordinator, this fence fell twice in 2022 and 2023
Approximate dimention: 100 ft length X 5.0 ft high
Solutions:
Recommended option: Replace whole fence with same architectural style.
Less costly option: replace the posts and damaged/rotten boards.
KGW table row 789. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-III_Buildings Lighting to LEDs$11,760
Asset as named in source: Community Center
LED conversion for Exterior and Interior Lights
KGW table row 790. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.