ParksAtlas
St. Johns · District 2 · Very large park · 85 acres

Pier Park

Developed parkPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: let my kids play, run through water, and play on a field.

Hours
5am to midnight
Getting there
N Lombard Street and Bruce Avenue Portland, OR 97203
Dogs
Dogs on leash
Access
Accessible restroom, accessible picnic area
Pier Park Disc GolfPhoto from the City's park page

Park history

The park was named for Stanhope S. Pier, who served as a Portland city commissioner in the late 1920s and as acting mayor in 1931. In 1930, Commissioner Pier proposed several improvements, including a pool in Albina, the expansion of Mt Scott and Lents Parks, and the development of Pier Park in the style of Laurelhurst, then considered the most beautiful park in the city.

Thanks to funding from the Parks Replacement Bond, a new Portland Loo was installed to replace Restroom A (also known as the "Tin Shed") at Pier Park. The project also included a new drinking fountain and new ADA accessible pathways to improve access to the Loo and informational kiosks.

From the City's page for this park.

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…stay a while
…play
…cool off
…compete
…get here and move

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Evening use — Programming after dusk — leagues, classes, walks.
  • League play — Organized sport seasons.
  • Summer water play — Cooling and swim programs.
  • Youth drop-in — Free unstructured play with somewhere for adults to sit.
  • Nature education — Environmental programs and guided walks.
  • Markets & festivals — Vendor events and neighborhood festivals.
One addition to investigate
  • Gatherings & events — needs stage or amphitheater or plaza or terrace
  • All-weather indoor — needs indoor space or community center or arts or cultural center or gymnasium

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

School grounds nearby

Public school grounds within a half mile, by straight line. What is listed is what OpenStreetMap mappers have recorded, not an inventory. The district sets public access.

  • Sitton Elementary · Portland Public Schools · 6.9 acres
    0.2 mi

    On record: 6 tracks, 3 playgrounds, 3 tetherball pitchs, 2 basketball pitchs, 2 baseball pitchs, 2 four square pitchs, 1 kickball pitch, 1 garden. Not recorded in this property’s inventory: running track. PP&R runs a SUN Community School here.

Beyond parks explains what opening a school ground would take.

School grounds: Metro RLIS. Features inside them: © OpenStreetMap contributors (ODbL).

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • use a restroom
  • gather out of the rain
  • walk or roll on pavement
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • +8 more
    • let my kids play
    • let every kid play
    • play on a court
    • shoot hoops
    • play pickleball
    • skate
    • walk a soft path
    • picnic with everyone
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • let my kids play
  • play on a field
  • play soccer
  • play ball
  • walk a soft path
  • use a restroom
  • +11 more
    • use an accessible restroom
    • sit down to eat
    • gather out of the rain
    • be in a park
    • let every kid play
    • play on a court
    • shoot hoops
    • play pickleball
    • skate
    • walk or roll on pavement
    • picnic with everyone
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • sit down to eat
  • run through water
  • use a restroom
  • use an accessible restroom
  • gather out of the rain
  • be in a park
  • +12 more
    • let my kids play
    • let every kid play
    • play on a court
    • shoot hoops
    • play pickleball
    • play on a field
    • play soccer
    • play ball
    • skate
    • walk or roll on pavement
    • walk a soft path
    • picnic with everyone
145 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • use a restroom
  • gather out of the rain
  • play on a field
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • +11 more
    • let my kids play
    • let every kid play
    • play on a court
    • shoot hoops
    • play pickleball
    • play soccer
    • play ball
    • skate
    • walk or roll on pavement
    • walk a soft path
    • picnic with everyone
0 programs · 1 event starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
4520
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
030
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

Upcoming at Pier Park

All park events

Reserve at Pier Park

This park has facilities you can reserve. Booking happens on the city's official systems — every link below goes straight there.

Picnic sites
Reserve a site
SiteTablesFeeFeatures
A22$149.25
B22$149.25
C12$83.25
D12$159.50
Sheltered
E6$41.00
F9$59.25
G4$35.25
H4$35.25

Fees and inventory from PP&R's 2026 picnic brochure. A $27.50 application fee applies. Reserve online or call 503-823-2525.

Partners & friends

The whole ecosystem

Community organizations that steward, fund, operate, or run programs at Pier Park. Labels show what is confirmed and what is still being filled in.

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

Pier Park

$6M

18 distinct source rows. Proposed repair and improvement costs, not a current funding gap.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

What the estimates cover

Pools & water features$2.4M
Courts, fields & golf$2.4M
Paths & access$828.7K
Roofs & buildings$185.2K
Other / mixed scope$83.5K
Play & gathering$78.3K
Energy & building systems$41.5K

Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.

The work, cost & reason (18 source rows)
Pool Mehanical System Upgrades$2,398,884

Asset as named in source: Pier Park

Replacement of mechanical systems at Pier Pool. This includes replacement of all the plumbing as well as the pumps, motors, pipes, strainer baskets, chemical controllers, sanitation systems and sand filters. Additionally, install a UV system to help with the sanitation of the pool water.

KGW table row 840. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate sport field$2,040,004

Asset as named in source: Ball Field 4, Sports Field 3

Sport fields rated 4 or 5 in condition assessment

KGW table row 841. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Pathway Renovation$772,786

Asset as named in source: Pier Park

Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

KGW table row 832. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate the Roof of Maintenance building$153,994

Asset as named in source: Maintenance Building

Fix or replace the Roof that is rated 4 through buildings' assessment

KGW table row 843. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Repair Basketball surface$148,177

Asset as named in source: Pier Park

There is a large (around 2' long) gouge out of the court and another area, maybe 18"x18" where the top surface is stripped away. Not sure what happened but I have a picture if you want it. Trip hazard

KGW table row 844. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Irrigation upgrade$136,353

Asset as named in source: Pier Park

Upgrade the rest of the irrigation system. Replaces CIP 1967, projects were split out.

KGW table row 845. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
PREPHub Pilot Project$59,967

Asset as named in source: Pier Park

No reason or scope description supplied.

KGW table row 833. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Pathway improvements.$55,940

Asset as named in source: Pier Park

Improve paths. Replaces CIP 1967, projects were split out.

KGW table row 834. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Sports field renovation, including ballfield light$46,616

Asset as named in source: Pier Park

Sports field renovation, replace ballfield lights. Replaces CIP 1967, projects were split out.

KGW table row 835. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Picnic area improvements$46,616

Asset as named in source: Pier Park

Improve lights at picnic areas, and add ash bins and water access. Replaces CIP 1967, projects were split out.

KGW table row 836. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate shelter, add utilities.$31,699

Asset as named in source: Pier Park

Assess and renovate shelter roof, and add utilites - lights and electricity- and install a hose bib nearby.

KGW table row 837. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate the Structure of Restroom building$31,171

Asset as named in source: Restroom A

Fix or replace the Structure that is rated 4 through buildings' assessment

KGW table row 838. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Pool Solar Thermal Installation$30,961

Asset as named in source: Pier Park

Installation of a new solar thermal hot water system.

KGW table row 839. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Replace Backflow preventer device$18,000

Asset as named in source: Pool

- Replace out of compliance backflow preventers - Assembly: Double Check Valve Assembly (DCVA) - Move to property line, if needed - Hazard: Aquatics and ROW - See components for detail

KGW table row 842. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-III_Buildings Lighting to LEDs$11,760

Asset as named in source: Maintenance

LED conversion for Exterior and Interior Lights

KGW table row 846. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-III_Buildings Lighting to LEDs$11,760

Asset as named in source: Restroom

LED conversion for Exterior and Interior Lights

KGW table row 847. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Install gate to the enterance on Columbia blvd$11,760

Asset as named in source: Pier Park

Problem: The service entrance on Columbia blvd is only closed with a chain. This chain has now been cut 5 times Solution: Install a real, metal gate at this location and locate this gate farther back into the park so we can park in front of the gate to unlock it.

KGW table row 848. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Repair the net post$11,760

Asset as named in source: Pier Park

The net post in tennis courts has been bent by vandals so the net no longer hangs properly

KGW table row 849. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗

45 of 253 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

$193.8K in linked site-account budgets

This is the known portion across 1 named account, including personnel, materials, City services and any capital outlay. It is budgeted, not actual spending or the full cost of this park.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 2

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
7,935
Households within a half mile
3,391

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
25
Closed backlog IDs
5

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
2
Estimated cost, as published
$150,000
Funding source codes, as published
MM

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

Stewardship group on record

A conservancy, friends group or stewardship partner is on record here. The split of tasks between staff and volunteers is not published.

  • The Belmont Goats · License, from Jul 1, 2025, no end dateCare of Goat Herd housed at Pier Park
  • TriMet · Lease, Jul 1, 2021 to Apr 30, 2027TriMet bus layover lease at Pier Park

From the department-provided partnership directory. It records what is on paper, not who does each task. Each agreement links to its entry on PP&R's agreements with partners, with the public text where it's posted, how to request it where it isn't, and the rules that govern partnerships.

Condition across all assets

Citywide condition atlas

Across 253 assessed assets at this park, 18% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 1Above fair · 69Fair · 138Poor · 33Very bad · 12
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Buildings2018Fences2022Pathways & trailsPlayground equipment2020Sport fieldsSport courts

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.

AssetConditionStatusReplacementAssessed
Picnic Table
Condition rated poor (code 4). Priority high.
Public note: see cad for location
Record 172
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 1373
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 1491
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 1731
Poor condition
code 4
Activeno2007-07-19
Bleacher
Condition rated poor (code 4). Priority high.
Record 1922
Poor condition
code 4
Activeno2007-07-19
Drinking Fountain
Condition very bad. Priority urgent.
Record 0513-DF-2
Very bad condition
code 5
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 2678
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition very bad. Priority urgent.
Record 3269
Very bad condition
code 5
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Public note: see cad
Record 3330
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 3512
Poor condition
code 4
Activeno2007-07-19
Permanent Bollard
Condition rated poor (code 4). Priority high.
Record 4163
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 4611
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 4657
Poor condition
code 4
Activeno2007-07-19
Bleacher
Condition rated poor (code 4). Priority high.
Record 4899
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition very bad. Priority urgent.
Record 4906
Very bad condition
code 5
Activeno2007-07-19
Drinking Fountain
Condition rated poor (code 4). Priority high.
Record 0513-DF-1
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 5085
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition very bad. Priority urgent.
Record 5471
Very bad condition
code 5
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 5491
Poor condition
code 4
Activeno2007-07-19
Drinking Fountain
Condition very bad. Priority urgent.
Record 0513-DF-3
Very bad condition
code 5
Activeno2007-07-19
Barbeque
Status is Removed. Priority urgent.
Record 5821
Very bad condition
code 5
Removedno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 7040
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 7689
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Public note: see cad for location
Record 7715
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 8193
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 8517
Poor condition
code 4
Activeno2007-07-19
Picnic Table
Condition rated poor (code 4). Priority high.
Record 8571
Poor condition
code 4
Activeno2007-07-19
Showing all 27 public repair candidates.
Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 167

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Picnic Table×90
5×34×173×522×18
Bench×22
3×52×17
Permanent Trash Can×22
3×32×15–×4
Permanent Bollard×13
4×13×92×1–×2
Bleacher×11
4×23×62×3
Bike Rack×4
3222
Drinking Fountain×3
545
Art Work×1
2
Barbeque×1
5

Related capital projects

Remove Pier Park At-Risk Assets

No public description.

ActivePhase pending$75,000
Remove Pier Park At-Risk Assets

No public description.

ActivePhase pending$75,000
Official Portland.gov profile

From the City's park page

Pier Park on Portland.gov

Open official page

This page contains information about Pier Park in North Portland's St. Johns neighborhood.

Pier Park, a large 85-acre park in North Portland's St. Johns neighborhood, is perfect for spending time outside. With so many amenities, there really is something for everyone.

One of the main attractions is the disc golf course, which is set among tall trees and is considered one of the top disc golf courses in the country. It’s fun for both beginners and experienced players.

Families will love the playgrounds, open sports fields, and the skate park where kids can practice their moves. If you enjoy a quiet walk, there are shaded trails where you can take in the sights and sounds of nature. The park’s forest is home to birds and other wildlife, so you might spot something interesting on your walk.

City label
Park
Year acquired
1920
Official acres
84.998
City section
North
Neighborhood
St. Johns
Location

N Lombard Street and Bruce Avenue Portland, OR 97203

Directions
Hours

Park hours: 5am to midnight To reserve a sports field or picnic area, call 503-823-2525

Amenities and activities
Accessible picnic areaAccessible play areaAccessible restroomDisc golfPicnic shelterPicnic tablePlaygroundSkate parkPaths (paved)Paths (unpaved)Baseball fieldSoccer fieldSoftball fieldSplash padBasketball courtPickleball court

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/pier-park-513?utm_source=park_qr&utm_medium=sign&utm_campaign=park_513

Where this comes from

Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.