ParksAtlas
Powellhurst-Gilbert · District 1 · Mid-size park · 6.1 acres

Raymond Park

Developed parkPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: let my kids play, run through water, and use a restroom.

Hours
5:00am-10:00pm
Getting there
SE 118th Avenue and Raymond Street Portland, OR 97266
Dogs
Dogs on leash
Access
Accessible restroom
View of Raymond Park playground area with evergreen trees in the background.  A swing set and play structure are on the left and rockers in the foreground all sit on a woodchipped surface.  Photo from the City's park page

Park history

In 2018, a Portland Loo was installed with funding from the 2014 Parks Replacement Bond.

From the City's page for this park.

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…stay a while
…play
…cool off
…compete
…get here and move

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Evening use — Programming after dusk — leagues, classes, walks.
  • League play — Organized sport seasons.
  • Summer water play — Cooling and swim programs.
  • Youth drop-in — Free unstructured play with somewhere for adults to sit.
  • Nature education — Environmental programs and guided walks.
  • Markets & festivals — Vendor events and neighborhood festivals.
One addition to investigate
  • Gatherings & events — needs stage or amphitheater or plaza or terrace
  • All-weather indoor — needs indoor space or community center or arts or cultural center or gymnasium

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • use a restroom
  • walk or roll on pavement
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • let my kids play
  • +3 more
    • let every kid play
    • play on a court
    • shoot hoops
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • let my kids play
  • use a restroom
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • let every kid play
  • +3 more
    • play on a court
    • shoot hoops
    • walk or roll on pavement
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • sit down to eat
  • run through water
  • use a restroom
  • use an accessible restroom
  • be in a park
  • let my kids play
  • +4 more
    • let every kid play
    • play on a court
    • shoot hoops
    • walk or roll on pavement
0 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • use a restroom
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • let my kids play
  • let every kid play
  • +3 more
    • play on a court
    • shoot hoops
    • walk or roll on pavement
0 programs · 0 events starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
000
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
000
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

What's on

No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.

Partners & friends

The whole ecosystem

Community organizations that steward, fund, operate, or run programs at Raymond Park. Labels show what is confirmed and what is still being filled in.

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

Raymond Park

$390.8K

5 distinct source rows. Proposed repair and improvement costs, not a current funding gap.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

What the estimates cover

Play & gathering$339K
Courts, fields & golf$29.4K
Parking & site infrastructure$15K
Energy & building systems$7.4K

Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.

The work, cost & reason (5 source rows)
Playground renovation$328,039

Asset as named in source: Play Area A

- Renovation or repair playground that was rated as 4 during playground assessment in 2020 - Fix sewer connection

KGW table row 903. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Repair Basketball court surface$29,401

Asset as named in source: Raymond Park

Repair the hole in the rubber mat under the hoop. Trip hazard

KGW table row 904. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate park fence$15,000

Asset as named in source: Chain link fence

Renovate fence rate 5 in condition assessment

KGW table row 905. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Repair play structure$10,935

Asset as named in source: Not specified

Failed Inspection Point from WO 304649 Structure platform is corroded and starting to crack where the bridge is connected

KGW table row 906. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Raymond Park$7,443

Asset as named in source: Not specified

Raymond Park; Close Portland Water Bureau (PWB) Account #2958496800 (Mtr #46307626). No use of this account in years.. FIM Name: 07.01-0561 Consolidate Utility Meters

KGW table row 902. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗

6 of 115 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

A complete annual cost is not yet available.

This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 1

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
8,492
Households within a half mile
2,988

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
5
Closed backlog IDs
5

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
1
Estimated cost, as published
$1,500,000
Funding source codes, as published
MM-EPDX Play

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

No partner agreement on record

The department-provided directory names no agreement here. Friends groups without a formal agreement are not captured.

From the department-provided partnership directory. It records what is on paper, not who does each task.

Condition across all assets

Citywide condition atlas

Across 115 assessed assets at this park, 5% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 4Above fair · 21Fair · 84Poor · 3Very bad · 3
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Buildings2018Fences2022Pathways & trailsPlayground equipment2020Sport courts

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.

AssetConditionStatusReplacementAssessed
Permanent Bollard
Condition rated poor (code 4); status is Removed. Priority high.
Record 4887
Poor condition
code 4
Removedno2007-08-13
Permanent Bollard
Condition rated poor (code 4); status is Removed. Priority high.
Record 7566
Poor condition
code 4
Removedno2007-08-13
Showing all 2 public repair candidates.
Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 68

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Permanent Bollard×50
4×23×442×11×3
Bench×9
333333232
Picnic Table×4
3232
Permanent Trash Can×3
32–
Bike Rack×1
2
Drinking Fountain×1
2

Related capital projects

Raymond Park Playground and Sewer Renovation

Raymond Park

ActivePhase pending$1,500,000
Official Portland.gov profile

From the City's park page

Raymond Park on Portland.gov

Open official page

Portland Parks & Recreation, with support from Nike and the Portland Trail Blazers, has given the Raymond Park basketball court a brand new look. This work was completed in July 2022.

You can learn more about this exciting Portland Park & Recreation partnership with Nike and the Portland Trail Blazers on the Basketball Court Revitalization Project page.

A Basic Earthquake Emergency Communication Node (pronounced beacon) is a place to go in Portland after a major earthquake to ask for emergency assistance if phone service is down, or report severe damage or injury. More BEECN information here.

City label
Park
Year acquired
1993
Official acres
6.115
City section
East
Neighborhood
Powellhurst-Gilbert
Location

SE 118th Avenue and Raymond Street Portland, OR 97266

Directions
Hours

Park hours: 5:00am-10:00pm

Amenities and activities
Accessible play areaAccessible restroomHorseshoe pitPicnic tablePlaygroundPaths (paved)Splash padBasketball court

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/raymond-park-561?utm_source=park_qr&utm_medium=sign&utm_campaign=park_561

Where this comes from

Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.