Everybody Plays — new playground. Everybody Plays scope named in the FY2025–26 report.
Portland Parks FoundationPP&R FY2025–26 Partnerships & Volunteerism report, p. 9Raymond Park
The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.
Classification and evidence
Official page label: Park; Atlas classification rules. Classification: inferred.
Source captured: 2026-06-02. Human verification: Pending.
Check current official informationConfirm the inferred property type with PP&R.
Published activities: let my kids play, run through water, and use a restroom.
Photo from the City's park pagePark history
In 2018, a Portland Loo was installed with funding from the 2014 Parks Replacement Bond.
From the City's page for this park.
Visitor amenities
Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.
- use a restroomRestroom
- use an accessible restroomAccessible restroom
- sit down to eatPicnic table
- let my kids playPlayground
- let every kid playAccessible play area
- run through waterSplash pad
- play on a courtAny sport court
- shoot hoopsBasketball court
- be in a parkAny park
- walk or roll on pavementPaved path
Potential additions to investigate
Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.
- Evening use — Programming after dusk — leagues, classes, walks.
- League play — Organized sport seasons.
- Summer water play — Cooling and swim programs.
- Youth drop-in — Free unstructured play with somewhere for adults to sit.
- Nature education — Environmental programs and guided walks.
- Markets & festivals — Vendor events and neighborhood festivals.
- Gatherings & events — needs stage or amphitheater or plaza or terrace
- All-weather indoor — needs indoor space or community center or arts or cultural center or gymnasium
Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.
Something specific to this park — the thing you'd use it for if it were here.
Send an idea for this park →Through the year
Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.
Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.
Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.
- use a restroom
- walk or roll on pavement
- use an accessible restroom
- sit down to eat
- be in a park
- let my kids play
+3 more
- let every kid play
- play on a court
- shoot hoops
Fields and gardens open; showers between sun. Leagues, planting, first picnics.
- let my kids play
- use a restroom
- use an accessible restroom
- sit down to eat
- be in a park
- let every kid play
+3 more
- play on a court
- shoot hoops
- walk or roll on pavement
Water, shade, long evenings — the season the system is built around.
- sit down to eat
- run through water
- use a restroom
- use an accessible restroom
- be in a park
- let my kids play
+4 more
- let every kid play
- play on a court
- shoot hoops
- walk or roll on pavement
Light shortens and leagues wind down; shelters and lighting carry the season.
- use a restroom
- use an accessible restroom
- sit down to eat
- be in a park
- let my kids play
- let every kid play
+3 more
- play on a court
- shoot hoops
- walk or roll on pavement
| Season | Programs | Recurring events | One-time |
|---|---|---|---|
Winter Dec–Feb Not yet published | — | — | — |
Spring Mar–May Recorded from 2026-06-11 | 0 | 0 | 0 |
Summer Jun–Aug Recorded from 2026-06-11 | 0 | 0 | 0 |
Fall Sep–Nov Recorded through 2026-10; 1 month still to come | 0 | 0 | 0 |
What's on
No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.
Partners & friends
The whole ecosystemCommunity organizations that steward, fund, operate, or run programs at Raymond Park. Labels show what is confirmed and what is still being filled in.
Support this park
Real ways to help Raymond Park and parks like it. This site does not process donations; every link below goes to an official giving or volunteering channel.
How it's holding up
The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.
Historical cost profile · 2023 reporting
Raymond Park
$390.8K
5 distinct source rows. Proposed repair and improvement costs, not a current funding gap.
All-in annual service cost: Not established
Current remaining repair cost: Not verified
What the estimates cover
Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.
The work, cost & reason (5 source rows)
Playground renovation$328,039
Asset as named in source: Play Area A
- Renovation or repair playground that was rated as 4 during playground assessment in 2020 - Fix sewer connection
KGW table row 903. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair Basketball court surface$29,401
Asset as named in source: Raymond Park
Repair the hole in the rubber mat under the hoop. Trip hazard
KGW table row 904. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate park fence$15,000
Asset as named in source: Chain link fence
Renovate fence rate 5 in condition assessment
KGW table row 905. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair play structure$10,935
Asset as named in source: Not specified
Failed Inspection Point from WO 304649 Structure platform is corroded and starting to crack where the bridge is connected
KGW table row 906. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Raymond Park$7,443
Asset as named in source: Not specified
Raymond Park; Close Portland Water Bureau (PWB) Account #2958496800 (Mtr #46307626). No use of this account in years.. FIM Name: 07.01-0561 Consolidate Utility Meters
KGW table row 902. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗6 of 115 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.
Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.
Compare repair estimates across parks →Annual service · FY 2026–27 adopted
A complete annual cost is not yet available.
This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.
Later budget supplements and unallocated shared services are not included.
Annual breakdown & district context →District picture · District 1
This park in the district picture
The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.
People nearby
- Residents within a half mile
- 8,492
- Households within a half mile
- 2,988
2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.
Recorded backlog
- Open backlog IDs
- 5
- Closed backlog IDs
- 5
Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.
Active capital projects
- Active geocoded projects
- 1
- Estimated cost, as published
- $1,500,000
- Funding source codes, as published
- MM-EPDX Play
Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.
Who is on record
No partner agreement on record
The department-provided directory names no agreement here. Friends groups without a formal agreement are not captured.
From the department-provided partnership directory. It records what is on paper, not who does each task.
Condition across all assets
Citywide condition atlasAcross 115 assessed assets at this park, 5% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.
This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.
Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.
Repair ledger
Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.
| Asset | Condition | Status | Replacement | Assessed |
|---|---|---|---|---|
Permanent Bollard Condition rated poor (code 4); status is Removed. Priority high. Record 4887 | Poor condition code 4 | Removed | no | 2007-08-13 |
Permanent Bollard Condition rated poor (code 4); status is Removed. Priority high. Record 7566 | Poor condition code 4 | Removed | no | 2007-08-13 |
Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.
Send a condition note →Public assets
All 68Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.
Related capital projects
Raymond Park
From the City's park page
Raymond Park on Portland.gov
Portland Parks & Recreation, with support from Nike and the Portland Trail Blazers, has given the Raymond Park basketball court a brand new look. This work was completed in July 2022.
You can learn more about this exciting Portland Park & Recreation partnership with Nike and the Portland Trail Blazers on the Basketball Court Revitalization Project page.
A Basic Earthquake Emergency Communication Node (pronounced beacon) is a place to go in Portland after a major earthquake to ask for emergency assistance if phone service is down, or report severe damage or injury. More BEECN information here.
Park hours: 5:00am-10:00pm
All dogs must be leashed in this park.
This page, on a sign
The QR label for this park points here. Print labels →
https://parks.portlandciviclab.org/parks/raymond-park-561?utm_source=park_qr&utm_medium=sign&utm_campaign=park_561
Where this comes from
Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.