Rose City Park · District 3 · Mid-size park · 8.4 acres

Rose City Park

Developed parkPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: let my kids play, play on a field, and use a restroom.

Hours
5:00am-midnight
Getting there
NE 62nd Avenue and Tillamook Street Portland, OR 97213
Dogs
Dogs on leash
Access
Accessible restroom
Rose City Park FieldPhoto from the City's park page

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…stay a while
…play
…compete
…get here and move

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Evening use — Programming after dusk — leagues, classes, walks.
  • League play — Organized sport seasons.
  • Youth drop-in — Free unstructured play with somewhere for adults to sit.
  • Nature education — Environmental programs and guided walks.
  • Markets & festivals — Vendor events and neighborhood festivals.
One addition to investigate
  • Gatherings & events — needs stage or amphitheater or plaza or terrace
  • Summer water play — needs splash pad or wading pool or all swimming pools or interactive fountain
  • All-weather indoor — needs indoor space or community center or arts or cultural center or gymnasium

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

School grounds nearby

Public school grounds within a half mile, by straight line. What is listed is what OpenStreetMap mappers have recorded, not an inventory. The district sets public access.

  • Rose City Park Elementary · Portland Public Schools · 3.7 acres
    0.3 mi

    On record: 2 playgrounds, 1 basketball pitch. Not recorded in this property’s inventory: basketball court.

Beyond parks explains what opening a school ground would take.

School grounds: Metro RLIS. Features inside them: © OpenStreetMap contributors (ODbL).

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • use a restroom
  • walk or roll on pavement
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • let my kids play
  • +4 more
    • let every kid play
    • play on a court
    • play tennis
    • walk a soft path
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • let my kids play
  • play on a field
  • play soccer
  • play ball
  • walk a soft path
  • use a restroom
  • +7 more
    • use an accessible restroom
    • sit down to eat
    • be in a park
    • let every kid play
    • play on a court
    • play tennis
    • walk or roll on pavement
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • sit down to eat
  • use a restroom
  • use an accessible restroom
  • be in a park
  • let my kids play
  • let every kid play
  • +7 more
    • play on a court
    • play tennis
    • play on a field
    • play soccer
    • play ball
    • walk or roll on pavement
    • walk a soft path
0 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • use a restroom
  • play on a field
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • let my kids play
  • +7 more
    • let every kid play
    • play on a court
    • play tennis
    • play soccer
    • play ball
    • walk or roll on pavement
    • walk a soft path
0 programs · 0 events starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
010
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
000
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

What's on

No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.

Reserve at Rose City Park

This park has facilities you can reserve. Booking happens on the city's official systems — every link below goes straight there.

Partners & friends

The whole ecosystem

Community organizations that steward, fund, operate, or run programs at Rose City Park. Labels show what is confirmed and what is still being filled in.

Public asset value at this park

Public value created when partners operate, maintain, fund, program, or steward park assets.

Full asset value view
1
Asset value entries
—
Annual value
Amount not yet listed
—
One-time capital
Amount not yet listed
Everybody Plays playground fundraising model
Portland Parks Foundation · Philanthropic partnership
Record: Unconfirmed

Community fundraising accelerates replacement of aging play assets across multiple districts.

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

Rose City Park

$873.4K

10 distinct source rows. Proposed repair and improvement costs, not a current funding gap.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

What the estimates cover

Courts, fields & golf$588K
Paths & access$264.6K
Energy & building systems$20.8K

Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.

The work, cost & reason (10 source rows)
Replace tennis court surface$588,024

Asset as named in source: Rose City Park

-The surface of tennis court is fully deteriorated, the surface and subgrade need to replace. -This project is derived from court assessment

KGW table row 928. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Concrete stairs replacement$217,539

Asset as named in source: Rose City Park

The main entrance to the north side of the park has a concrete stairway with two levels on a perpendicular turn. The lower level of stairs has a wide gap between the structural support wall and the concrete stairs. Stairs have compromised structural integrity, and need to be replaced.

KGW table row 931. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Pathway Renovation$47,042

Asset as named in source: Rose City Park

Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

KGW table row 929. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Replace Backflow preventer device$10,000

Asset as named in source: Property

- Replace out of compliance backflow preventer - Assembly: Double Check Valve Assembly (DCVA) - Premises Isolation (PI): 3" Reduced Pressure (RP) + Enclosure. Serial # 03164 - Move to property line, if needed - Hazard: Right of Way (ROW)

KGW table row 932. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Rose City Park$6,618

Asset as named in source: Not specified

Rose City Park - Retro commission all irrigation sprinkler systems and heads to ensure proper thrown and timing. Replace 10% of all rotary and spray heads.. FIM Name: 18.10-0573 Irrigation System Improvements

KGW table row 927. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Rose City Park$1,796

Asset as named in source: Not specified

Retrocommission all astronomical and mechanical timeclocks to ensure proper operation and correct current time.. FIM Name: 05.00-0573 Retro Commissioning Astronomical & Mech Timeclocks

KGW table row 933. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Rose City Park$1,027

Asset as named in source: Not specified

Install low flow aerators, low flow shower heads, and RCx water closet flush valves.. FIM Name: 18.00-0573 Water Fixture Retrofits

KGW table row 934. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Rose City Park$875

Asset as named in source: Not specified

Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-0573 Building Interior Lighting LED Conversion

KGW table row 925. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Rose City Park$366

Asset as named in source: Not specified

Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0573 Building Exterior Lighting Controls

KGW table row 930. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Rose City Park$85

Asset as named in source: Not specified

Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0573 Building Exterior Lighting LED Conversion

KGW table row 926. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗

18 of 71 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

A complete annual cost is not yet available.

This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 3

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
8,165
Households within a half mile
3,649

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
12
Closed backlog IDs
3

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
1
Estimated cost, as published
$25,000
Funding source codes, as published
MM-ADA

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

No partner agreement on record

The department-provided directory names no agreement here. Friends groups without a formal agreement are not captured.

From the department-provided partnership directory. It records what is on paper, not who does each task.

Condition across all assets

Citywide condition atlas

Across 71 assessed assets at this park, 25% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 4Above fair · 16Fair · 33Poor · 10Very bad · 8
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Buildings2018Fences2022Pathways & trailsPlayground equipment2020Sport fieldsSport courts

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.

AssetConditionStatusReplacementAssessed
Picnic Table
Condition rated poor (code 4). Priority high.
Record 3260
Poor condition
code 4
Activeno2007-08-03
Bench
Condition rated poor (code 4). Priority high.
Record 6049
Poor condition
code 4
Activeno2007-08-03
Other
Condition rated poor (code 4). Priority high.
Record 8338
Poor condition
code 4
Activeno2007-08-03
Bench
Condition rated poor (code 4). Priority high.
Record 8856
Poor condition
code 4
Activeno2007-08-03
Showing all 4 public repair candidates.
Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 21

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Bench×7
2234324
Permanent Trash Can×4
3322
Bleacher×3
332
Picnic Table×3
343
Drinking Fountain×2
33
Bike Rack×1
2
Other×1
4

Related capital projects

Rose City Park Staircase Design Assessment

No public description.

ActivePhase pending$25,000
Official Portland.gov profile

From the City's park page

Rose City Park on Portland.gov

Open official page

Take a virtual tour of the trees at Rose City Park

City label
Park
Year acquired
1920
Official acres
24
City section
NE
Neighborhood
Rose City Park
Location

NE 62nd Avenue and Tillamook Street Portland, OR 97213

Directions
Hours

Park hours: 5:00am-midnight To reserve a sports field, call 503-823-2525.

Amenities and activities
Accessible play areaAccessible restroomPicnic tablePlaygroundPaths (paved)Paths (unpaved)Soccer fieldSoftball fieldTennis court (lighted)

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/rose-city-park-573?utm_source=park_qr&utm_medium=sign&utm_campaign=park_573

Where this comes from

Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.