ParksAtlas
Sellwood-Moreland · District 4 · Large park · 17 acres

Sellwood Park

Developed parkPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: let my kids play, play on a field, and use a restroom.

Hours
5:00am-midnight. Parking lot closed at 10:00pm.
Getting there
SE 7th Avenue and Miller Street Portland, OR 97202
Dogs
Dogs on leash
Access
Accessible restroom, accessible picnic area
Sellwood Park Flower BedPhoto from the City's park page

Park history

In 1893, the town of Sellwood was merged into Portland, but has managed to keep its own identity throughout the years. The area is named for John Sellwood, an Episcopal minister who owned the land claim in what is now the Sellwood area. Sellwood Park used to be the site of the City View Racetrack.

In 2019, the Sellwood Park Kitchen roof and structural columns were replaced with funding from the 2014 Parks Replacement Bond. This building was constructed in the mid-1920s as a concession stand and is used now as a kitchen space for park reservations.

From the City's page for this park.

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…stay a while
…play
…compete
…get here and move
…remember and belong

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Evening use — Programming after dusk — leagues, classes, walks.
  • League play — Organized sport seasons.
  • Summer water play — Cooling and swim programs.
  • Youth drop-in — Free unstructured play with somewhere for adults to sit.
  • Nature education — Environmental programs and guided walks.
  • Markets & festivals — Vendor events and neighborhood festivals.
One addition to investigate
  • Gatherings & events — needs stage or amphitheater or plaza or terrace
  • All-weather indoor — needs indoor space or community center or arts or cultural center or gymnasium

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • use a restroom
  • walk or roll on pavement
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • let my kids play
  • +6 more
    • play on a court
    • shoot hoops
    • play pickleball
    • walk a soft path
    • picnic with everyone
    • see public art
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • let my kids play
  • play on a field
  • play soccer
  • play ball
  • walk a soft path
  • use a restroom
  • +9 more
    • use an accessible restroom
    • sit down to eat
    • be in a park
    • play on a court
    • shoot hoops
    • play pickleball
    • walk or roll on pavement
    • picnic with everyone
    • see public art
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • sit down to eat
  • use a restroom
  • use an accessible restroom
  • be in a park
  • let my kids play
  • play on a court
  • +9 more
    • shoot hoops
    • play pickleball
    • play on a field
    • play soccer
    • play ball
    • walk or roll on pavement
    • walk a soft path
    • picnic with everyone
    • see public art
396 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • use a restroom
  • play on a field
  • use an accessible restroom
  • sit down to eat
  • be in a park
  • let my kids play
  • +9 more
    • play on a court
    • shoot hoops
    • play pickleball
    • play soccer
    • play ball
    • walk or roll on pavement
    • walk a soft path
    • picnic with everyone
    • see public art
0 programs · 0 events starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
5210
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
000
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

What's on

No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.

Reserve at Sellwood Park

This park has facilities you can reserve. Booking happens on the city's official systems — every link below goes straight there.

Picnic sites
Reserve a site
SiteTablesFeeFeatures
A11$76.50
B8$53.75
C6$41.00
PowerKey
D8$53.75
E5$35.25
F8$53.75
G4$35.25
H11$76.50
I8$53.75

Fees and inventory from PP&R's 2026 picnic brochure. A $27.50 application fee applies. Reserve online or call 503-823-2525.

Partners & friends

The whole ecosystem

Community organizations that steward, fund, operate, or run programs at Sellwood Park. Labels show what is confirmed and what is still being filled in.

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

Sellwood Park

$9.2M

17 distinct source rows. Proposed repair and improvement costs, not a current funding gap.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

What the estimates cover

Energy & building systems$5.6M
Pools & water features$2.5M
Courts, fields & golf$599.4K
Paths & access$388.3K
Roofs & buildings$91.6K

Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.

The work, cost & reason (17 source rows)
General Improvements to the building, HVAC, Window$5,139,608

Asset as named in source: Sellwood Community Center

General Improvements to Selwood CC including Building envelope: replace windows; Egress & fire alarm corrections; structural repairs; HVAC upgrades; and correct interior ADA issues

KGW table row 940. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Sellwood Pool Replaster$2,261,677

Asset as named in source: Sellwood Pool

- This is Recurrence paroject that due every 10. Sellwood pool will need to be replastered on or before 2024. See Project phases - We try to replaster one pool per year to keep them operational. Filter and boiler are also overdue. Pool at risk of closure/not being heated.

KGW table row 947. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Repair of the tennis court and pickelball$470,419

Asset as named in source: Sellwood Park

- Replacement/repair of the tennis court and stripping for pickelball. - Old Description: *PENDING SUPPORT FROM EXECUTED PI PLAN AND SMT. Change upper tennis court to pickle ball court, a popular sport.

KGW table row 941. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Pathway Renovation$388,261

Asset as named in source: Sellwood Park

Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

KGW table row 942. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Boiler Replacement$338,237

Asset as named in source: Sellwood Pool

Replace failing boiler and heat exchanger, piping and registers. They are past their useful life. Add ventilation system and sprinklers system

KGW table row 944. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Sport court renovation$129,000

Asset as named in source: Basketball court 1

Renovate courts rated 4 or 5 in condition assessment

KGW table row 950. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Pool sand filter replacment$117,605

Asset as named in source: Sellwood Pool

-The filter wasn’t serviced since installed in 1997, and it needs to be serviced every 15-20 years. - The filter can not be serviced by PPK shop because of insufficient clearence to access the filter - This Project is impotant and urgent. Attached email from Andy Amato states that failing started in these filters.

KGW table row 951. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
UV System for Sellwood Pool$108,566

Asset as named in source: Sellwood Pool

Add UV system to pool filter, increasing the quality of the pool environment and improving disease prevention.

KGW table row 952. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Change light poles base connection$73,440

Asset as named in source: Light poles

Case: Some light poles are connected to the footing by steel wires that deteriorating over time because of water/moisture influence. Additionally , these bases are not designed for lateral loads produced by wind and other tension equipment. Proposal: replace wire type connection by other type that resist coded lateral loads and more durable against environmental effects Number of poles is 24 approximately with estimated cost $3000/ pole.

KGW table row 938. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate the Roof of Restroom - Storage building$71,864

Asset as named in source: Restroom B

Fix or replace the Roof that is rated 4 through buildings' assessment

KGW table row 939. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Replace Backflow preventer device$24,000

Asset as named in source: Irrigation

- Replace out of compliance backflow preventers - Assembly: Double Check Valve Assembly (DCVA) and Reduced Pressure Backflow Assembly (RPBA) - Move to property line, if needed - Hazard: well site - See components for detail

KGW table row 945. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Sellwood Pool Solar Thermal Installation$20,537

Asset as named in source: Sellwood Pool

Installation of a new solar thermal hot water system.

KGW table row 946. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Renovate the Structure of Restroom building$19,746

Asset as named in source: Restroom A

Fix or replace the Structure that is rated 4 through buildings' assessment

KGW table row 948. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Sellwood Park$17,655

Asset as named in source: Not specified

Sellwood Park - Retro commission all irrigation sprinkler systems and heads to ensure proper thrown and timing. Replace 10% of all rotary and spray heads.. FIM Name: 18.10-0666 Irrigation System Improvements

KGW table row 949. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Sellwood Park$1,225

Asset as named in source: Not specified

Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-0666 Building Interior Lighting LED Conversion

KGW table row 953. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Sellwood Park$366

Asset as named in source: Not specified

Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0666 Building Exterior Lighting Controls

KGW table row 943. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-II_ Sellwood Park$98

Asset as named in source: Not specified

Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0666 Building Exterior Lighting LED Conversion

KGW table row 937. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗

17 of 252 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

$470.4K in linked site-account budgets

This is the known portion across 1 named account, including personnel, materials, City services and any capital outlay. It is budgeted, not actual spending or the full cost of this park.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 4

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
4,949
Households within a half mile
2,550

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
17
Closed backlog IDs
10

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
0

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

Partner operates an asset here

A partner is on record operating a facility or program site at this property. City crews may still care for the grounds.

  • Friends of Sellwood Community House · Lease, Apr 25, 2025 to Apr 24, 2030Lease of Sellwood Park Kitchen/Shack
  • The Human Access Project · MOU, May 1, 2023 to Aug 31, 2027MOU for swim ladder replacements

Partners at assets here: Sellwood Community House (operates a facility or program site)

From the department-provided partnership directory. It records what is on paper, not who does each task. Each agreement links to its entry on PP&R's agreements with partners, with the public text where it's posted, how to request it where it isn't, and the rules that govern partnerships.

Condition across all assets

Citywide condition atlas

Across 252 assessed assets at this park, 7% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 77Above fair · 65Fair · 93Poor · 15Very bad · 2
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Buildings2018Fences2022Pathways & trailsPlayground equipment2020Sport fieldsSport courts

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.

AssetConditionStatusReplacementAssessed
Bench
Condition very bad. Priority urgent.
Record 86
Very bad condition
code 5
Activeno2007-09-05
Bench
Condition rated poor (code 4); status is Removed. Priority high.
Record 2888
Poor condition
code 4
Removedno2007-09-05
Picnic Table
Replacement field says yes. Priority high.
Record 4291
Good condition
code 1
Activeyes2007-09-05
Bench
Condition rated poor (code 4); status is Removed. Priority high.
Record 6145
Poor condition
code 4
Removedno2007-09-05
Bench
Condition rated poor (code 4). Priority high.
Record 6924
Poor condition
code 4
Activeno2007-09-05
Drinking Fountain
Condition rated poor (code 4). Priority high.
Record 0666-DF-3
Poor condition
code 4
Activeno2007-09-05
Bench
Condition rated poor (code 4). Priority high.
Record 7574
Poor condition
code 4
Activeno2007-09-05
Bench
Condition rated poor (code 4). Priority high.
Record 7755
Poor condition
code 4
Activeno2007-09-05
Picnic Table
Replacement field says yes. Priority high.
Record 8568
Good condition
code 1
Activeyes2007-09-05
Showing all 9 public repair candidates.
Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 141

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Picnic Table×82
2×171×65
Bench×20
5×14×53×52×8–×1
Permanent Bollard×13
3×92×4
Permanent Trash Can×8
33212312
Bleacher×6
222222
Bike Rack×4
2222
Memorial×4
––––
Drinking Fountain×3
134
Flag Pole×1
1
Official Portland.gov profile

From the City's park page

Sellwood Park on Portland.gov

Open official page

Learn more about closures and postponements related to the COVID-19 pandemic response.

City label
Park
Year acquired
1909
Official acres
16.649
City section
SE
Neighborhood
Sellwood-Moreland
Location

SE 7th Avenue and Miller Street Portland, OR 97202

Directions
Hours

Park hours: 5:00am-midnight. Parking lot closed at 10:00pm. To reserve a sports field or picnic area, call 503-823-2525. This park is funded through a partnership between Portland Parks & Recreation and Columbia Sportswear, Inc.

Amenities and activities
Accessible picnic areaAccessible restroomHorseshoe pitPicnic tablePlaygroundStatue or public artPaths (paved)Paths (unpaved)Baseball fieldSoccer fieldSoftball fieldBasketball courtTennis backboardPickleball court

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/sellwood-park-666?utm_source=park_qr&utm_medium=sign&utm_campaign=park_666