Portland ParksAtlas
District 2 / North-Northeast

Sumner-Albina Park

Public asset records for this park are shown as a transparency layer. Itemized repair costs remain pending until Portland Parks & Recreation provides verified estimates.

0
Acres
1
Assets
0
Repair candidates
0
Replacement-flagged

Support this park

Real ways to help Sumner-Albina Park and parks like it. This site does not process donations; every link below goes to an official giving or volunteering channel.

Official Portland.gov profile

City-published park details

Sumner-Albina Park on Portland.gov

Open official page

Learn more about closures and postponements related to the COVID-19 pandemic response.

City label
Park
Year acquired
1998
Official acres
0.082
City section
NE
Neighborhood
Humboldt
Location

5134-5138 N Albina Street Portland, OR 97217

Directions
Hours

Park hours: 5:00am-midnight

Amenities and activities
Paths (paved)
Park history

A new mural was commissioned by the Regional Arts & Culture Council (RACC) in 2009. Created by Portland artists Chris Johanson and Jo Jackson, Cherry Sprout Market shows the harmony of nature, farming, wildlife, and plants. All greens used in the mural match the neighborhood region.

All dogs must be leashed in this park.

Partners & friends

The whole ecosystem
Opportunity signal

No known partner is currently linked to Sumner-Albina Park in the Partnership Atlas. This is an opportunity signal, not an official priority.

See opportunity signals

Condition across all assets

Citywide condition atlas

Across 5 assessed assets at this park, 80%are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

Good · 0Above fair · 0Fair · 1Poor · 4Very bad · 0
Assessed asset families here
Pathways & trails

Condition is rated 1 (good) to 5 (very bad); blank means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. No repair costs — those aren't published.

Repair ledger

Assessment dates are copied from the public Parks Amenities layer. Old dates mean this source does not publish a newer assessment for that asset, not that we have confirmed no newer internal inspection exists. PP&R does not publish itemized repair costs, so this ledger shows needs without dollar figures.

Public data does not currently flag repair candidates for this park. Additional PP&R maintenance exports can be added without changing the page structure.

QR destination

https://parks.portlandciviclab.org/parks/sumner-albina-park-714?utm_source=park_qr&utm_medium=sign&utm_campaign=park_714

Public assets

All 1

The public asset layer includes `PictureID` and `Hyper_pic`, but those values point to PP&R internal file-share paths, not public image URLs. Asset-level inspection photos need a PP&R export or public ArcGIS attachments before this app can render them.

A photo of the colorful mural at Sumner-Albina Park.Public photo from the official Portland.gov park page
Bench
Condition: Unknown · Status: Active