Visitor Centers$22,499,450
Asset as named in source: Washington Park
South Entry Garden Plaza, indoor garden, amphitheater upgrades
KGW table row 1102. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Staff Facility Improvements$14,197,681
Asset as named in source: Washington Park
Natural Area Maintenance Facility, current maintenance facilities expansion, Rose Garden restroom and Curators office upgrade
KGW table row 1106. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Playground and Recreation Improvements$9,594,648
Asset as named in source: Washington Park
Forest Canopy Walk,
KGW table row 1088. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Visitor Centers, Plaza Improvements, Food$7,459,839
Asset as named in source: Washington Park
Hoyt Center improvements, W. Burnside Gateway, Zoo entry court, South entry visitor center, Depot Café, Rose Garden Interim Visitor Center, Rose Garden Plaza
KGW table row 1089. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Transportation, Parking and Entry Improvements$3,597,993
Asset as named in source: Washington Park
New parking lots,
KGW table row 1100. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Fischer Lane Trailhead for Wildwood Trail Access$2,352,096
Asset as named in source: Not specified
- Fischer Lane Trailhead for Wildwood Trail Access (Washington Park Master Plan 2018 Phase 1).
- The project was proposed by staff in October, 2019, and is the next phase of improvements to support the Bridge over Burnside.
- The project is included in the 2018 Washington Park Master Plan
KGW table row 1103. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Demolish Portland children museum building$1,020,002
Asset as named in source: Portland children museum
Demolish At-Risk Building (based on third-party analysis). Significant operational expenditure and risk to keep in-as-is state. Coordinate with Property. Removal allows increased operational investment at public-serving facilities.
Property Priority - complication with Verizon lease
KGW table row 1115. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Rock Wall Repairs$1,017,755
Asset as named in source: Washington Park
Disassemble and re-stack or modify dry-stack and mortar stone walls at Washington Park. A drainage ditch may also be required. Replaces CIP 2352, projects were split out by site.
KGW table row 1116. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace Elephant Barn Roof$529,222
Asset as named in source: Washington Park
- Roof is leaking and deteriorated.
- The soffit and facer boards on the southwest corner show signs of rotting and may need to be replaced.
- The roof need to replace
KGW table row 1092. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Ecological Improvements$359,799
Asset as named in source: Washington Park
Invasive Species Removal - replanting
KGW table row 1096. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Playground renovation$328,039
Asset as named in source: Play Area A
Renovation or repair playground that was rated as 4
during playground assessment in 2020
KGW table row 1097. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Gold Medal Garden Path Repair$320,831
Asset as named in source: Washington Park - International Rose Test Garden
pave new perimeter path to prevent mud and dirt footpaths toward the exterior of the Gold Medal Garden
KGW table row 1098. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Gutters$309,615
Asset as named in source: Washington Park
Rebuild gutters along pedestrian path from North Restroom to Burnside.
KGW table row 1099. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Wash Pk Old Maintenance Building Demolished$177,042
Asset as named in source: Washington Park
Replaces 2355A $ 127,400 Demolish old maintenance building, costs are too high to refurbish existing structure.
KGW table row 1104. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Reservoir Trail$119,933
Asset as named in source: Washington Park
Water Bureau contribution $50K toward construction of a soft surface trail connector from the lower portion of SW Sherwood Blvd to the MAC Trail, behind the Rose Garden. (email from Victor Sanders March 2017)
KGW table row 1108. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate parking lot_Parking Area K$115,711
Asset as named in source: Parking Area K
Repair parking lot that was rated 5 in condition assessment. Repair include surface, drainage and curb. approx area= 4000 sq.ft
KGW table row 1109. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Decomposing of stairs$65,963
Asset as named in source: Washington Park
The stairs from the bear house to W Burnside St. is in very bad condition. They need to decompose as there is alternative way from bear house to W Burnside St.
KGW table row 1090. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Playground A Repair$58,802
Asset as named in source: Washington Park
Near Elephant House:
- Removal and replacement of existing Wildwood play structures near elephant house.
- Wildwood play equipment is no longer manufactured. Structures have outlived their useful life.
- Remove large areas of concrete and rubber surfacing, expand play area footprint.
- Playground Surface Area, tile surfacing- rubber tiles have reached the end of their lifespan. Large gaps and edges starting to lift all over playground area. This is creating trip hazards.
- Plastic spinner metal alphabet tabs coming loose creating a hazard
Note that these improvements could trigger the requirement to bring other aspects of the park up to ADA.
KGW table row 1091. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Automatic ceiling sprinklers- Children Museum$47,042
Asset as named in source: Children Museum
Improve and provide Sprinkler system to chidlen museum as below:
- Provide automatic ceiling sprinklers in the "Fish Bowl" section of the building per the City's property insurer, FM Global.
- Provide automatic sprinklers for the unprotected concealed spaces per the City's property insurer, FM Global.
-Improve seismic bracing on the automatic sprinkler system per the City's property insurer, FM Global.
KGW table row 1093. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Install new evaporator$45,575
Asset as named in source: Washington Park
Furnish and install new evaporator on 30RAN chiller #2. Recharge both circuits to factory specs.
KGW table row 1094. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair the gutters of restroom C$41,977
Asset as named in source: Washington Park
Repair the gutters of Men's and women's bathroom. They are leaking inside the restrooms
KGW table row 1095. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Seismic protection improvement$29,983
Asset as named in source: Portland Childrens Museum
Improve seismic bracing on the automatic sprinkler system.
KGW table row 1101. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Rose garden Sidewalk$17,641
Asset as named in source: Washington Park
No reason or scope description supplied.
KGW table row 1105. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Bike Lane in front of the zoo$12,497
Asset as named in source: Road
Please repair uneven and broken up surface of the bike lane in front of the zoo in PP&R's parking lot.
KGW table row 1107. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗MAC Trail concrete repair$11,760
Asset as named in source: Washington Park
Scrape out footprint of MAC Trail concrete repair
KGW table row 1110. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-III_Buildings Lighting to LEDs$11,760
Asset as named in source: Maintenance
LED conversion for Exterior and Interior Lights
KGW table row 1111. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-III_Buildings Lighting to LEDs$11,760
Asset as named in source: Restroom
LED conversion for Exterior and Interior Lights
KGW table row 1112. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace old HVAC system$11,571
Asset as named in source: Rose Garden Store and Downtown District Headquarters
Placeholder: replace HVAC system that was installed before 2000
KGW table row 1113. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate parking lot_Parking Area X$11,571
Asset as named in source: Parking Area X
Repair parking lot that was rated 4 in condition assessment. Repair include surface, drainage and curb. approx area= 378 sq.ft
KGW table row 1114. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Upgrade building upon workspace assessment outcome$0
Asset as named in source: Not specified
No reason or scope description supplied.
KGW table row 1117. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗