Permit sports fields through PP&R's customer service center.
Westmoreland Park
The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.
Classification and evidence
Official page label: Park; Atlas classification rules. Classification: inferred.
Source captured: 2026-06-02. Human verification: Pending.
Check current official informationConfirm the inferred property type with PP&R.
Published activities: let my kids play, play on a field, and use a restroom.
Photo from the City's park pagePark history
Westmoreland Park began as a part of a residential subdivision that was subtracted from the Ladd Estate's Crystal Spring Stock Farm in 1909. In 1924, the property was used as golf links, likely in conjunction with what is today known as Eastmoreland Golf Course. Prior to the 1920s, dating back as far as 1852, the property was used as farmland. By the 1930s, the site east of the subdivision had been converted from a wetland to serve time as a dairy, brickyard, and airstrip known as Broomfield Field (named after a Reed College Graduate by the name of Hugh Broomfield who lost his life over German Lines in WWI while on a recon mission.) However, as development increased, residents requested that these empty fields be turned into a city park.
In 1935, the City Planning Commission recommended development of recreational amenities for the nearby residents and "the improved appearance and traffic safety of McLoughlin Boulevard as a major traffic freeway entrance to the city." In January 1936, the City of Portland purchased the 45-acre parcel called Fairways Addition from Oregon Iron & Steel Co., a business owned by the Ladd Estate Co. After purchasing the land, the City of Portland immediately commissioned Francis Benedict Jacobberger to create a Study Sketch and Preliminary Layout for the West Moreland Recreation Park. F. B. Jacobberger was the son of Joseph Jacobberger, a principal of the architecture firm Jacobberger & Smith, founded in 1912. From 1921, the younger Jacobberger worked as a draftsman in his father’s office; when the elder Jacobberger died in 1930, Francis Jacobberger continued the firm in his own name.
As initially conceived, the park included (from roughly north to south) a park office and restroom building, outdoor handball courts, a roller-skating rink, basketball courts, twelve tennis courts, two children’s play areas, two picnic parks, a model yacht lagoon, bowling greens, a horseshoe pitching area, a fly-casting pond with nearby dry-casting area and fly-caster’s club house, four baseball diamonds, two football fields, a lacrosse field, a soccer field, various portable bleachers, and dressing rooms. Water from Crystal Springs, which entered the park at the north end, was to feed both the model yacht lagoon and the casting pond before flowing through to the south end of the park. Both the lagoon and pond were also intended for use as ice-skating rinks in the colder winter months.
A partnership between the City of Portland and the federal Works Progress Administration (WPA) helped escalate the park’s construction. Viewed as an important opportunity to employ laborers during the rough economic times following the Great Depression, park construction focused on manual labor in order to employ the greatest number of people. The fly-casting pond, specifically, was hand excavated, and was one of the first features completed at the park. By August 1936, the pond was home to the 28th Annual International Casting competition.
From the City's page for this park.
Visitor amenities
Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.
- use a restroomRestroom
- use an accessible restroomAccessible restroom
- sit down to eatPicnic table
- let my kids playPlayground
- play in natureNature play area
- play on a courtAny sport court
- shoot hoopsBasketball court
- play tennisTennis court
- play on a fieldAny sport field
- play soccerSoccer or futsal field
- play ballBaseball or softball
- be in a parkAny park
- walk or roll on pavementPaved path
- walk a soft pathUnpaved path
- see public artPublic art
Potential additions to investigate
Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.
- Evening use — Programming after dusk — leagues, classes, walks.
- League play — Organized sport seasons.
- Youth drop-in — Free unstructured play with somewhere for adults to sit.
- Nature education — Environmental programs and guided walks.
- All-weather indoor — Programming that survives a Portland winter.
- Markets & festivals — Vendor events and neighborhood festivals.
- Gatherings & events — needs stage or amphitheater or plaza or terrace
- Summer water play — needs splash pad or wading pool or all swimming pools or interactive fountain
Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.
Something specific to this park — the thing you'd use it for if it were here.
Send an idea for this park →Through the year
Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.
Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.
Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.
- use a restroom
- walk or roll on pavement
- use an accessible restroom
- sit down to eat
- be in a park
- let my kids play
+6 more
- play in nature
- play on a court
- shoot hoops
- play tennis
- walk a soft path
- see public art
Fields and gardens open; showers between sun. Leagues, planting, first picnics.
- let my kids play
- play on a field
- play soccer
- play ball
- walk a soft path
- use a restroom
+9 more
- use an accessible restroom
- sit down to eat
- be in a park
- play in nature
- play on a court
- shoot hoops
- play tennis
- walk or roll on pavement
- see public art
Water, shade, long evenings — the season the system is built around.
- sit down to eat
- use a restroom
- use an accessible restroom
- be in a park
- let my kids play
- play in nature
+9 more
- play on a court
- shoot hoops
- play tennis
- play on a field
- play soccer
- play ball
- walk or roll on pavement
- walk a soft path
- see public art
Light shortens and leagues wind down; shelters and lighting carry the season.
- use a restroom
- play on a field
- use an accessible restroom
- sit down to eat
- be in a park
- let my kids play
+9 more
- play in nature
- play on a court
- shoot hoops
- play tennis
- play soccer
- play ball
- walk or roll on pavement
- walk a soft path
- see public art
| Season | Programs | Recurring events | One-time |
|---|---|---|---|
Winter Dec–Feb Not yet published | — | — | — |
Spring Mar–May Recorded from 2026-06-11 | 0 | 0 | 0 |
Summer Jun–Aug Recorded from 2026-06-11 | 0 | 0 | 0 |
Fall Sep–Nov Recorded through 2026-10; 1 month still to come | 0 | 0 | 0 |
What's on
No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.
Reserve at Westmoreland Park
This park has facilities you can reserve. Booking happens on the city's official systems — every link below goes straight there.
| Site | Tables | Fee | Features |
|---|---|---|---|
| A | 4 | $35.25 | |
| B | 4 | $35.25 | |
| C | 4 | $35.25 | |
| D | 4 | $35.25 | |
| E | 4 | $35.25 | |
| F | 3 | $35.25 | |
| G | 4 | $35.25 | |
| H | 4 | $35.25 |
- · No vehicle access allowed.
Fees and inventory from PP&R's 2026 picnic brochure. A $27.50 application fee applies. Reserve online or call 503-823-2525.
Partners & friends
The whole ecosystemCommunity organizations that steward, fund, operate, or run programs at Westmoreland Park. Labels show what is confirmed and what is still being filled in.
Support this park
Real ways to help Westmoreland Park and parks like it. This site does not process donations; every link below goes to an official giving or volunteering channel.
How it's holding up
The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.
Historical cost profile · 2023 reporting
Westmoreland Park
$1.7M
17 distinct source rows. Proposed repair and improvement costs, not a current funding gap.
All-in annual service cost: Not established
Current remaining repair cost: Not verified
What the estimates cover
Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.
The work, cost & reason (17 source rows)
Ballfield Improvements$580,919
Asset as named in source: Westmoreland Park
Replace fencing at four fields, backstops. Level four fields (add dirt).
KGW table row 1126. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Westmoreland Park Repair & Replace Bridges$347,132
Asset as named in source: Westmoreland Park
The abutments need repairs and possible replacement. Propose to remove the old bridges. Have the abutments repaired or replaced per engineering. Then have freshly engineered, ADA compliant, weather resistant bridges installed as their replacements
KGW table row 1130. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Parking Lots Improvements$347,132
Asset as named in source: Parking lot A and C
- Repair tennis court parking lot that is rated 5 in condition assessment. Repair include surface, drainage and curb. - Repair southren parking lot that was rated 4 in condition assessment. Repair includes add curbing, landscaping and planter islands for aesthetic & functional reasons. Define parking areas better, sign for handicapped accessibility, improve compliance with COP stormwater manual.
KGW table row 1131. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Park Entry Improvements$111,879
Asset as named in source: Westmoreland Park
Install signs and entry markers, add accessibility ramps to provide access to park to more people. Use pillars salvaged from Bybee bridge replacement to mark entries.
KGW table row 1139. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Tennis Courts: Renovation$100,691
Asset as named in source: Westmoreland Park
- Relocate tennis courts to south end of park between Skavone Stadium and parking lot along SE 23rd. - Add new lights poles as replacement of removed ones in sport courts. - One of the four light poles fell down and was removed leaving exposed wires. - There is no more electrical panel, or power to turn on these lights. This court service needs to be rebuilt from the ground up, including 4 new light poles.
KGW table row 1140. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Renovation$83,114
Asset as named in source: Internal Pathway/ Sidewalk
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
KGW table row 1124. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate electrical and mechanical equipment$50,000
Asset as named in source: Sckavone stadium
Electrical and mechanical equipment’s passed 25 year of service and need to replace.
KGW table row 1127. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Repair/Reinforce Boardwalk$35,281
Asset as named in source: Westmoreland Park
Hand rails need reinforced and boardwalk has significant slip, trip, and fall hazards, particularly during the wet winter months.
KGW table row 1129. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Westmoreland Park$32,170
Asset as named in source: Not specified
Westmoreland Park - Retro commission all irrigation sprinkler systems and heads to ensure proper thrown and timing. Replace 10% of all rotary and spray heads.. FIM Name: 18.10-0852 Irrigation System Improvements
KGW table row 1132. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Westmoreland Park Path Paving$15,481
Asset as named in source: Pathway
Pave a short section of path related to the nature play project
KGW table row 1137. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace Backflow preventer device$12,000
Asset as named in source: Irrigation
-Replace out of compliance backflow preventers - Assembly: Double Check Valve Assembly (DCVA) - Move to property line, if needed - Hazard: well Site & flood plain - See components for detail
KGW table row 1138. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Westmoreland Park Bowling Green Bldg$5,137
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-1137 Building Interior Lighting LED Conversion
KGW table row 1128. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Westmoreland Park$3,295
Asset as named in source: Not specified
Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0852 Building Exterior Lighting Controls
KGW table row 1133. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Westmoreland Park$2,984
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-0852 Building Interior Lighting LED Conversion
KGW table row 1134. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Westmoreland Park$2,871
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0852 Building Exterior Lighting LED Conversion
KGW table row 1135. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Westmoreland Park Bowling Green Bldg$733
Asset as named in source: Not specified
Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-1137 Building Exterior Lighting Controls
KGW table row 1125. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Westmoreland Park Bowling Green Bldg$194
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-1137 Building Exterior Lighting LED Conversion
KGW table row 1136. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗22 of 248 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.
Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.
Compare repair estimates across parks →Annual service · FY 2026–27 adopted
A complete annual cost is not yet available.
This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.
Later budget supplements and unallocated shared services are not included.
Annual breakdown & district context →District picture · District 4
This park in the district picture
The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.
People nearby
- Residents within a half mile
- 10,213
- Households within a half mile
- 4,911
2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.
Recorded backlog
- Open backlog IDs
- 22
- Closed backlog IDs
- 10
Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.
Active capital projects
- Active geocoded projects
- 0
Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.
Registered programs
- Program sections
- 1
- Registrations
- 21
- On a waitlist
- 6
- Venue
- Westmoreland Park is in SE Portland. Meet at the entrance near SE 22nd Avenue and Rex. https://maps.app.goo.gl/HFBQ8mF9RnUuZerU8
ActiveNet snapshot taken September 15, 2026. Sections are scheduled classes or sessions; registrations are enrolments on that date, not attendance.
Who is on record
No partner agreement on record
The department-provided directory names no agreement here. Friends groups without a formal agreement are not captured.
From the department-provided partnership directory. It records what is on paper, not who does each task.
Condition across all assets
Citywide condition atlasAcross 248 assessed assets at this park, 9% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.
This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.
Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.
Repair ledger
Public data does not currently flag repair candidates for this park. Additional PP&R maintenance exports can be added without changing the page structure.
Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.
Send a condition note →Public assets
All 117Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.
From the City's park page
Westmoreland Park on Portland.gov
A New Pedestrian Bridge is Coming Soon to Westmoreland Park
Westmoreland Park visitors will soon have a great new connection! Portland Parks & Recreation is replacing one of the park’s pedestrian bridges over Crystal Springs Creek as part of the Westmoreland Park Master Plan. The new crossing, on the north side of the nature-based play area, will replace the bridge removed in 2018.
The new pedestrian crossing will be safer and more accessible for park visitors. A longer bridge span will improve habitat conditions and contribute to stream restoration efforts. The new bridge features low maintenance, long-lasting materials and will reflect other design elements in the park.
Park hours: 5am to midnight To reserve a picnic area, call 503-823-2525 or visit our Picnic Reservation page.
All dogs must be leashed in this park.
This page, on a sign
The QR label for this park points here. Print labels →
https://parks.portlandciviclab.org/parks/westmoreland-park-852?utm_source=park_qr&utm_medium=sign&utm_campaign=park_852
Where this comes from
Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.