Portland Downtown · District 4 · Large park · 34 acres

Gov Tom McCall Waterfront Park

Developed parkPublic entry documented

The captured official page publishes visiting hours. Check the source for current closures. Public-entry status is separate from wheelchair accessibility.

Classification and evidence

Official page label: Park; Atlas classification rules. Classification: inferred.

Source captured: 2026-06-02. Human verification: Pending.

Check current official information

Confirm the inferred property type with PP&R.

Suggest a correction

Published activities: use a restroom, find a published trail, and walk or roll on pavement.

Hours
5:00am-midnight
Getting there
Naito Parkway between S Harrison Street and NW Glisan Street Portland, OR 97204
Dogs
Dogs on leash
Access
Accessible restroom
Waterfront Park Salmon Springs Fountain Tom MccallPhoto from the City's park page

Park history

The idea for this park came at the turn of the century when the 1903 Olmsted Report pointed out the need not only for parks within the city, but for a greenway scheme for the riverbanks in order to ensure their preservation for future generations. The 1912 Bennett Plan again showed a need for more parks and river greenways, but instead of reorienting itself to the river, the city's focus was pulled further inland. In the late 1920s, the seawall was built along the Willamette's west bank for the protection of downtown from the annual floods. The seawall not only cut off the water from the people, but the people from the water as well. The construction of Harbor Drive along the west bank in the 1940s continued the trend of isolating the public from the river.

With the opening of the Eastbank Freeway (Marquam Bridge, I-5), Harbor Drive became less important to the traffic flow of the city. Governor Tom McCall created the Harbor Drive Task Force in 1968 in order to study proposals for creating a public open space in its place. In 1974, Harbor Drive was torn up and construction of a waterfront park began. It was completed and dedicated in 1978, gaining instant popularity. In 1984, the park was renamed Governor Tom McCall Waterfront Park.

From the City's page for this park.

Visitor amenities

Published amenities are checked separately from entry conditions. Each links to other documented locations; confirm current hours before visiting.

…stay a while
…gather
…cool off
…compete
…get here and move
…be in nature
…remember and belong

Potential additions to investigate

Passing the initial size-and-type screen is not a feasibility finding. Usable space, existing uses, habitat, public access, utilities, permission, construction costs, and ongoing maintenance funding require site-specific review. Missing acreage or uncertain classification remains unassessed.

Enabling assets recorded
  • Evening use — Programming after dusk — leagues, classes, walks.
  • Gatherings & events — Concerts, movies, cultural events.
  • Summer water play — Cooling and swim programs.
  • Nature education — Environmental programs and guided walks.
  • Markets & festivals — Vendor events and neighborhood festivals.
One addition to investigate
  • League play — needs any sport field or any sport court
  • Youth drop-in — needs playground
  • All-weather indoor — needs indoor space or community center or arts or cultural center or gymnasium

Inventory-based screening only. Recorded assets do not establish opening hours, program staffing, permission, or operating funding. Potential additions require review of usable space, habitat, utilities, access, and ongoing maintenance. Unverified properties remain unassessed.

What else should this park let you do?

Something specific to this park — the thing you'd use it for if it were here.

Send an idea for this park →

Through the year

Seasonal facilities and listings captured by the Atlas. These records do not measure attendance, utilization or all activity at the site.

Counts describe captured listings, not attendance or all activity. No listings captured does not mean the site is unused.

Winter
Dec–Feb

Dark by 5 and wet most days: cover, lighting, indoor rooms, and paths that drain.

  • use a restroom
  • walk or roll on pavement
  • find a published trail
  • use an accessible restroom
  • meet in a public square
  • be in a park
  • +6 more
    • sit by a fountain
    • ride a bike
    • launch a boat
    • look out over water
    • see public art
    • visit a historic place
0 programs · 0 events starts captured
Fewest modeled facilities
Spring
Mar–May

Fields and gardens open; showers between sun. Leagues, planting, first picnics.

  • find a published trail
  • use a restroom
  • use an accessible restroom
  • meet in a public square
  • be in a park
  • splash in a fountain
  • +7 more
    • sit by a fountain
    • ride a bike
    • walk or roll on pavement
    • launch a boat
    • look out over water
    • see public art
    • visit a historic place
0 programs · 0 events starts captured
Summer
Jun–Aug

Water, shade, long evenings — the season the system is built around.

  • use a restroom
  • use an accessible restroom
  • meet in a public square
  • be in a park
  • splash in a fountain
  • sit by a fountain
  • +7 more
    • ride a bike
    • walk or roll on pavement
    • find a published trail
    • launch a boat
    • look out over water
    • see public art
    • visit a historic place
0 programs · 0 events starts captured
Fall
Sep–Nov

Light shortens and leagues wind down; shelters and lighting carry the season.

  • use a restroom
  • find a published trail
  • use an accessible restroom
  • meet in a public square
  • be in a park
  • splash in a fountain
  • +7 more
    • sit by a fountain
    • ride a bike
    • walk or roll on pavement
    • launch a boat
    • look out over water
    • see public art
    • visit a historic place
0 programs · 0 events starts captured
What the record holds here, by season
SeasonProgramsRecurring eventsOne-time
Winter Dec–Feb
Not yet published
———
Spring Mar–May
Recorded from 2026-06-11
000
Summer Jun–Aug
Recorded from 2026-06-11
000
Fall Sep–Nov
Recorded through 2026-10; 1 month still to come
000
Our reading of the calendar
Which facilities count as in season is our model of Portland's year (splash pads and wading pools in summer; fields, gardens and interactive fountains spring through fall; everything else year-round) — not the City's schedule. Check posted hours for pools, splash pads, and restrooms. From 16 weekly catalog snapshots (2026-06-11 to 2026-10-12). "Programs" are distinct titles; "sections" are the catalog's individual records — a swim level at one time slot for one week is one section. Complete through 2026-10; later months fill in as registration opens. Winter counts fill in when winter registration opens.

What's on

No current listings were captured and matched to this property. This does not establish that no activity takes place. See the citywide calendar and programs.

Partners & friends

The whole ecosystem

Community organizations that steward, fund, operate, or run programs at Gov Tom McCall Waterfront Park. Labels show what is confirmed and what is still being filled in.

How it's holding up

The City's own inventory of what is here and the condition it last recorded for each item. Dates are the source's; old dates mean no newer public assessment, not that nothing has happened since. Historical project estimates appear below; they are separate from these condition records.

Historical cost profile · 2023 reporting

Gov Tom McCall Waterfront Park

$30.5M

9 distinct source rows. Proposed repair and improvement costs, not a current funding gap.

All-in annual service cost: Not established

Current remaining repair cost: Not verified

What the estimates cover

Bridges & retaining walls$28.8M
Other / mixed scope$1.4M
Paths & access$167.1K
Energy & building systems$78.5K
Roofs & buildings$37K

Categories are Atlas labels based on project titles. Expansion and new provision are included where proposed; a project can include several kinds of work.

The work, cost & reason (9 source rows)
Salmon Street Springs to Morrison Bridge; Waterfro$20,977,337

Asset as named in source: Gov Tom McCall Waterfront Park

Naito Parkway sidewalk, relocate drop-off area, build new plaza with cantilevered deck, connect to Morrison Bridge, expand "Portland Spirit" dock and repave Esplanade.

KGW table row 401. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Hawthorne Bridge to Salmon Street Springs$7,831,539

Asset as named in source: Gov Tom McCall Waterfront Park

Naito Parkway sidewalk, build new dock for sternwheeler, renovate restroom, add terraced concrete steps, relocate WWII Memorial, build new plaza, repave Esplanade. Reseed lawns.

KGW table row 398. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
USS Oregon Battleship Mast Renovation$1,288,505

Asset as named in source: Gov Tom McCall Waterfront Park

Complete unfinished items from Navey League's survey of needed mast repairs, including replacing side shell steel, replacingtop exterior platform, restoring sliding doors, repainting, replacing interior, circular platform, rebuilding three platforms, inspecting newly installed electrical systems and wiring.

KGW table row 405. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Pathway Renovation$167,109

Asset as named in source: Gov Tom McCall Waterfront Park

Replace the damaged pathway, trails and sidewalks that have been rated as 5 in Pathway assessment

KGW table row 402. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Waterfront Pk Turf Renovation$91,103

Asset as named in source: Not specified

Remove 1" to 2" layer of organic matter fromms and-based turf areas, regrade, improve irrigation, reseed

KGW table row 397. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Replace Backflow preventer device$55,000

Asset as named in source: Property

- Replace out of compliance backflow preventers - Assembly: Double Check Valve Assembly (DCVA) - Move to property line, if needed - Hazard: well Site - See components for detail

KGW table row 399. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
Building renovation$36,977

Asset as named in source: Utility C

Renovate buildings rated 4 or 5 in building assessment

KGW table row 400. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-III_Buildings Lighting to LEDs$11,760

Asset as named in source: Utility

LED conversion for Exterior and Interior Lights

KGW table row 403. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗
ESPC-III_Buildings Lighting to LEDs$11,760

Asset as named in source: Restroom

LED conversion for Exterior and Interior Lights

KGW table row 404. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.

Original source table ↗

16 of 411 assessed built records are rated poor or very bad in the separate condition dataset. Condition ratings do not determine these dollar estimates.

Source: KGW’s November 2023 table. Current status, remaining scope and funding are unverified. Exact duplicate rows count once; other scope overlaps remain unresolved.

Compare repair estimates across parks →

Annual service · FY 2026–27 adopted

A complete annual cost is not yet available.

This property has no named account linked in the public budget extract. Shared crews and citywide programs may still fund its care.

Later budget supplements and unallocated shared services are not included.

Annual breakdown & district context →

District picture · District 4

This park in the district picture

The same public records, read the same way for every property, so this park can be set next to its district. Each figure keeps its own source and date. “Not available” means the source has no record for this property. It is not a zero.

People nearby

Residents within a half mile
16,579
Households within a half mile
11,620

2020 Census blocks whose centre point lies within a half mile of the park boundary, measured in a straight line. Residents, not visitors. Blocks outside the city limits count.

Recorded backlog

Open backlog IDs
25
Closed backlog IDs
4

Records in the PP&R backlog map workbook that name this property. The workbook publishes no cost field, so these are counts of records, not dollars.

Active capital projects

Active geocoded projects
0

Geocoded PP&R capital projects at this property, a subset of the full capital program. The cost is the published estimated total project cost, not spending to date.

Who is on record

Partner operates an asset here

A partner is on record operating a facility or program site at this property. City crews may still care for the grounds.

  • American Waterways · License, Jul 1, 2021 to Feb 28, 2034American Waterways Inc at Waterfront Park
  • Freetime Inc · Lease, Sep 22, 2025 to Mar 31, 2027Kiosk lease at Waterfront Park - Freetime Inc
  • Japanese American Museum of Oregon · Stewardship Agreement, Dec 21, 2023 to Dec 14, 2028Stewardship of Japanese American Historical Plaza
  • Portland Saturday Market · Lease, Jun 4, 2008 to Jul 1, 2028Saturday Market - Waterfront Park/Ankeny Plaza
  • State of Oregon · Lease, Jul 1, 2021 to May 31, 2034DSL-ML-7521-16852-ML Waterfront Park/Portland Spir

Partners at assets here: Japanese American Museum of Oregon (operates a facility or program site); Portland Rose Festival Foundation (operates a facility or program site)

From the department-provided partnership directory. It records what is on paper, not who does each task. Each agreement links to its entry on PP&R's agreements with partners, with the public text where it's posted, how to request it where it isn't, and the rules that govern partnerships.

Condition across all assets

Citywide condition atlas

Across 411 assessed assets at this park, 4% are in poor or very-bad condition (rated 4–5). Pooled from the City's public assessment layers — buildings, bridges, playgrounds, courts, fields, fences, paths and amenities.

This count comes from the City's rated asset layers; the “Public assets” list below is a separate furnishings inventory, so its items and scores are counted separately and the two totals need not match.

Good · 32Above fair · 222Fair · 141Poor · 16Very bad · 0
Assessed asset families here
Amenities & furnishings2007 (2007–2026)Buildings2018Pathways & trails

Condition is rated 1 (good) to 5 (very bad); no score means not yet assessed and is excluded. Park trees are inventoried separately and not counted here. These assessment records do not contain repair costs. Historical project estimates are shown separately.

Repair ledger

Each row is one record from PP&R's public asset layer. No itemized repair cost is published for these records, so none is shown. Dates are the source's last published assessment; treat older ones as unverified.

AssetConditionStatusReplacementAssessed
Bench
Condition rated poor (code 4). Priority high.
Record 241
Poor condition
code 4
Activeno2007-07-09
Permanent Trash Can
Condition rated poor (code 4). Priority high.
Public note: ARPA Victor Stanley
Record 2205
Poor condition
code 4
Activeno2007-07-09
Bench
Condition rated poor (code 4). Priority high.
Record 3933
Poor condition
code 4
Activeno2007-07-09
Bench
Condition rated poor (code 4). Priority high.
Record 4598
Poor condition
code 4
Activeno2007-07-09
Bench
Condition rated poor (code 4). Priority high.
Record 6128
Poor condition
code 4
Activeno2007-07-09
Bench
Condition rated poor (code 4). Priority high.
Record 6506
Poor condition
code 4
Activeno2007-07-09
Bench
Condition rated poor (code 4). Priority high.
Record 7417
Poor condition
code 4
Activeno2007-07-09
Bench
Condition rated poor (code 4). Priority high.
Record 8162
Poor condition
code 4
Activeno2007-07-09
Showing all 8 public repair candidates.
Know this park?

Seen something here that's broken, fixed, or missing from this list? Records are updated periodically; tell us what you see.

Send a condition note →

Public assets

All 326

Furnishings the City inventories here, with each item's condition score — 1 is good, 5 is very bad. Asset photos aren't public yet.

Bench×132
4×73×152×951×2–×13
Bike Rack×74
3×182×451×11
Permanent Trash Can×52
4×13×122×29–×10
Permanent Bollard×27
3×92×18
Memorial×16
3×42×31×1–×7–×1
Flag Pole×8
222222–3
Telescope×8
12121122
Drinking Fountain×6
332322
Art Work×3
2––
Official Portland.gov profile

From the City's park page

Governor Tom McCall Waterfront Park on Portland.gov

Open official page

UPDATED May 7, 2025

In early 2025, Multnomah County constructed a 10-foot diameter shaft (or foundation) just north of the west end of the bridge in Tom McCall Waterfront Park. Multnomah County’s Earthquake Ready Burnside Bridge Project now has a clearer picture of how soil composition will interact with new Burnside Bridge foundations. This comes after several months of work building a 10-foot diameter test shaft (foundation) just north of the Burnside Bridge in Tom McCall Waterfront Park. Construction and subsequent testing finished in March and fencing around the construction site came down Friday, May 2. Check out the project’s time-lapse video for a full look at the test shaft work.

For more information and updates, please visit the County's project page at multco.us/info/burnside-bridge-test-shaft-work

City label
Park
Year acquired
1927
Official acres
30.902
City section
Downtown
Neighborhood
Portland Downtown
Location

Naito Parkway between S Harrison Street and NW Glisan Street Portland, OR 97204

Directions
Hours

Park hours: 5:00am-midnight

Amenities and activities
Accessible restroomHistorical sitePlazaStatue or public artVisitor attractionBoat dockRiverfront viewsPaths (paved)Trails (biking)FountainFountain (interactive)

All dogs must be leashed in this park.

This page, on a sign

The QR label for this park points here. Print labels →

https://parks.portlandciviclab.org/parks/gov-tom-mccall-waterfront-park-156?utm_source=park_qr&utm_medium=sign&utm_campaign=park_156

Where this comes from

Facilities from the City's amenity pages and asset layers; hours, photo, and history from the City's park page; programs and events from its catalogs; condition from PortlandMaps public records. Where the City publishes nothing, this page says so instead of guessing.