Renovate Basketball sport court at Laurelhurst Park$798,242
Asset as named in source: Basketball Court
Sport court assessment: Fix or replace the Nike Resurf surface of the court that is rated 4 through courts' assessment
WO: Basketball court surface has large bubble around area that is already missing. Trip hazard needs repaired. Entire surface needs to be replaced
KGW table row 553. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace old HVAC system$306,001
Asset as named in source: Laurelhurst Studio and Ankeny building
Placeholder: replace or upgrade HVAC system that was installed before 2000
KGW table row 557. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Renovation$135,262
Asset as named in source: Internal Pathway/ Sidewalk
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
KGW table row 565. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Park$92,653
Asset as named in source: Not specified
Replace Laurelhurst Park's old well pump/pump motor with a new and more efficient pump/pump motor.. FIM Name: 18.02-0224 Replace Well Pump
KGW table row 552. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Park$63,802
Asset as named in source: Not specified
Laurelhurst Park - Retro commission all irrigation sprinkler systems and heads to ensure proper thrown and timing. Replace 10% of all rotary and spray heads.. FIM Name: 18.10-0224 Irrigation System Improvements
KGW table row 554. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Replace Backflow preventer device$30,000
Asset as named in source: Property
- Replace out of compliance backflow preventers
- Assembly: Double Check Valve Assembly (DCVA)
- Move to property line, if needed
- Hazard: well site
- See components for detail
KGW table row 558. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Park$28,826
Asset as named in source: Not specified
Replace Laurelhurst Park's irrigation sump pump/pump motor with a new and more efficient pump/pump motor.. FIM Name: 18.11-0224 Replace Irrigation Pump(s)
KGW table row 559. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Tennis Courts Resurface$22,929
Asset as named in source: Laurelhurst Park
Resurface tennis courts.
KGW table row 560. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Park$10,606
Asset as named in source: Not specified
Refurbish existing well at Laurelhurst Park via sonar-jet cleaning of well casing to disintegrate mineral and bacterial deposits.. FIM Name: 18.01-0224 Refurbish Existing Well
KGW table row 566. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Remove fence compromise trees$10,200
Asset as named in source: Fence
Short-term fix: Remove fencing that is compromising trees in Laurelhurst Studio/Sports field block. Install plastic construction fencing or other material to create a barrier between the park and street without injuring the trees.
Long Term Fix: Replace entire fence around Laurelhurst Studio/Sports Field block. Fence is old and causing damage to many trees in the area.
KGW table row 567. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Studio$6,929
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-1114 Building Interior Lighting LED Conversion
KGW table row 555. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Studio$2,633
Asset as named in source: Not specified
Install low flow aerators, low flow shower heads, and RCx water closet flush valves.. FIM Name: 18.00-1114 Water Fixture Retrofits
KGW table row 561. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Park$2,510
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-0224 Building Interior Lighting LED Conversion
KGW table row 562. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Studio$2,197
Asset as named in source: Not specified
Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-1114 Building Exterior Lighting Controls
KGW table row 563. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Park$2,057
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0224 Building Exterior Lighting LED Conversion
KGW table row 564. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Studio$1,997
Asset as named in source: Not specified
Tighten schedules and setpoints to match occupancy and maintain a 5F deadband between occupied heating and cooling setpoints.. FIM Name: 04.01-1114 DDC/Control System Optimization
KGW table row 568. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Park$1,464
Asset as named in source: Not specified
Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0224 Building Exterior Lighting Controls
KGW table row 569. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Laurelhurst Studio$513
Asset as named in source: Not specified
Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-1114 Building Exterior Lighting LED Conversion
KGW table row 556. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.