Expand facility; Develop strategy$25,863,466
Asset as named in source: Charles Jordan Community Center
$30M - Commissioner project - (likely over multiple fiscal years).
Old Project Description:
Develop a strategy for identifying potential appropriate pool expansion and/ or center expansion or relocation project for CJCC. Initial ideas include: expand facility by adding a therapy pool facility (from aquatic technical paper recommendation) and look at expanding parking area, property boundaries. This project should be determined with public input, after an aquatic strategy for N/NE Portland is developed.
KGW table row 1055. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗CJCC Roofing$10,730,324
Asset as named in source: Charles Jordan Community Center
Major roof repairs at Charles Jordan Community Center. Funded by one-time General Fund Discretionary.
KGW table row 1062. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Fire Protection improvement$724,906
Asset as named in source: Charles Jordan Community Center
Redesign the quantity and position of sprinklers in basement area. Provide sprinkler protection in unprotected crawl spaces.
KGW table row 1050. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Playground renovation$555,595
Asset as named in source: University Park
- The vinyl coating is coming off of the play structure platforms and is creating jagged edges, potential for a bad scrape.
- Install play equipment in the soft surface area at the north end of the building, new addition, and expand play area to add more equipment (current range is inadequate). Add sizeable free play area, per Technical Paper.
-Playground gets lots of mole hills so soil get mixed in with the playchips. Please put on list for bond projects for installing a barrier
KGW table row 1051. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Charles Jordan Community Center$438,450
Asset as named in source: Not specified
Replace old RTUs 6-11 on SE wing of Charles Jordan Community Center with new like-for-like more efficient models.. FIM Name: 03.00-0825 Air-Side & Unitary HVAC Equipment Upgrades
KGW table row 1052. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate parking lot_Parking Area A$209,296
Asset as named in source: Parking Area A
Repair parking lot that was rated 4 in condition assessment. Repair include surface, drainage and curb. approx area= 12801 sq.ft
KGW table row 1057. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Playground renovation$165,711
Asset as named in source: Play Area A
Renovation or repair playground that was rated as 4
during playground assessment in 2020
KGW table row 1058. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Charles Jordan Community Center$118,449
Asset as named in source: Not specified
Replace one existing 199 MBH natural gas fired domestic water heater (WH#2) at Charles Jordan Community Center with new high efficiency modulating natural gas domestic water heater.. FIM Name: 12.00-0825 New High Efficiency Domestic Water Heaters
KGW table row 1059. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Renovate the Roof of Restroom - Storage building$80,426
Asset as named in source: Restroom A
Fix or replace the Roof that is rated 4 through buildings' assessment
KGW table row 1049. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Pathway Renovation$40,176
Asset as named in source: Internal Pathway/ Sidewalk
Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment
KGW table row 1053. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗Upgrade Sidewalk$29,983
Asset as named in source: University Park
The sidewalk at University Park, north side, extends from the community center, down Alaska to the restroom building where it stops. There is about 180' space between the end of that sidewalk piece and the sidewalk that runs along in front of the residences. It is not ADA accessible, just a dirt path in that area. Please add installing this "missing" piece of sidewalk to the CIP list for improved access to the community center.
KGW table row 1054. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Charles Jordan Community Center$21,211
Asset as named in source: Not specified
CJCC; Install 100 occupancy sensor plug load power strips throughout the facility to reduce plug load power consumption for loads that do not need to be on 24/7 such as computer monitors, TVs, scanners, paper shredders, printers, speakers, etc. All CPUs, modems, and routers to be plugged into "always on" ports in power strip to ensure connectivity for the IT department to push updates.. FIM Name: 16.02-0825 Install Plug Load Management
KGW table row 1056. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-III_Buildings Lighting to LEDs$11,760
Asset as named in source: Community Center
LED conversion for Exterior and Interior Lights
KGW table row 1060. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-III_Buildings Lighting to LEDs$11,760
Asset as named in source: Restroom - Storage
LED conversion for Exterior and Interior Lights
KGW table row 1061. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗ESPC-II_ Charles Jordan Community Center$1,149
Asset as named in source: Not specified
CJCC - Retro commission all irrigation sprinkler systems and heads to ensure proper thrown and timing. Replace 10% of all rotary and spray heads.. FIM Name: 18.10-0825 Irrigation System Improvements
KGW table row 1063. Source field: “Escalated Estimate.” Estimate date, inflation basis, funded amount and completion status are not supplied.
Original source table ↗