Next in line

Portland Parks & Recreation has 1,814 repairs and replacements on its open backlog. This page lists them top to bottom in the bureau's own priority order, with the reasons PP&R recorded for each, and shows what the backlog is made of: where the money is and what kind of work it is. It shows what the bureau rates most urgent. It cannot yet show what will be fixed next, because the funded list, current costs and the rule for breaking ties are not public.

PP&R's backlog projects map workbook, extract dated 2026-10-12. Scores are the bureau's, unchanged. Capital budgets are from the FY 2026–27 adopted budget.

Read this first

Why the top of this list is not yet a spending plan

  1. Most items share a score.1,510 items have a score above zero, but there are only 33 different scores among them. 11 items tie at the top score of 100, and 60 score 75 or higher. PP&R publishes no rule for ordering items with the same score, so the list below lets you choose one and says which is in use.
  2. Cost is not part of the score.40 of the 60 items scored 75 or higher match a November 2023 estimate, $11M together. The other 20 have no published cost. Among the items tied at 100, the 2023 estimates run from $30,000 (renovate retaining wall, Kelly Butte Natural Area) to $739,490 (building renovation, Maint Facility - SE 136th and Holgate).
  3. How many people use a place is not part of the score.5 of the 11 items tied at the top are at a staff maintenance yard or a fee-supported golf or racing site. The score weighs an asset's risk of failing and the neighborhood around it.
  4. Funding status is not public.13 of the 31 places with an item scored 75 or higher have any money in this year's adopted capital budget, and that money may be for other work at the site. Another $69.4M of the capital budget could not be tied to any site, much of it citywide programs and new parks, so a park with no line here may still be getting work.
  5. Waiting time is not part of the score.The oldest item scored 75 or higher, “Replace Elephant Barn Roof” at Washington Park, was requested in FY 09/10, 17 years ago.

What the backlog is made of

17 projects hold half the cost

PP&R's backlog workbook lists 1,814 open items. 941 of them match a November 2023 cost estimate, and those estimates add up to $506.2M. The other 873 have no published cost, so that total is not the size of the backlog. PP&R's own headline, about $759M, counts with a different scope and date, and the two can't be matched item by item.

A few large projects, many small ones

The 17 largest items account for $257M, half of the priced total, and the ten largest alone for 39%. PP&R marks 13 of those 17 as partly adding capacity, not only repairing what exists. At the other end, half of all priced items cost $70.1K or less, and together they come to $11.8M, 2.3% of the total. The cheapest 85%, 800 items of $470.4K or less each, add up to $75M.

Priced backlog items by the size of their 2023 estimate: share of items and share of dollars
2023 estimateItemsShare of itemsDollarsShare of dollars
Under $100,00053557%$17.1M3.4%
$100,000 to $1 million33335%$102.9M20%
$1 million to $10 million646.8%$195.9M39%
$10 million or more9under 1%$190.2M38%

What kind of work it is

Master plans, expansions and redevelopment is the largest type by cost: 46 items and $140.9M, 28% of the priced total, though only 16 of the 46 carry a price. The most numerous types are small jobs. 239 energy-efficiency retrofits, many of them LED lighting, come to $7.2M, and 214 path, trail and stair items come to $39.3M.

Open backlog items by type of work: items, items with a 2023 estimate, total and median estimate
Type of workItemsWith a price2023 estimatesShare of dollarsTypical item
Buildings$152.3M30% of dollars
Community centers and other buildings8438$92.5M$145.2K
Seismic and structural3020$19.3M$188.9K
Staff workspaces7625$15M$30K
Heating, plumbing and other building systems6133$14.6M$81.7K
Roofs7328$10.9M$112.7K
Recreation facilities$106.5M21% of dollars
Sports fields and courts147100$87.2M$221.7K
Playgrounds7853$14.1M$206K
Pools and splash pads4012$4.4M$116.3K
Restrooms227$733.6K$65.3K
Paths, parking and bridges$74.2M15% of dollars
Paths, trails and stairs214164$39.3M$75.2K
Parking lots and roads8953$27.6M$209.3K
Bridges, docks and boardwalks4114$6.9M$273.2K
Accessible routes (ADA)1694$502.5K$85.9K
Grounds, water and energy$31.8M6.3% of dollars
Natural areas and trees8366$12.3M$147K
Energy-efficiency retrofits239197$7.2M$11.8K
Walls, fences, plazas and other site features7637$6.2M$60K
Site lighting and electrical3721$3.1M$58.1K
Irrigation, water and drainage8251$2.9M$10K
Expansions and new parks$140.9M28% of dollars
Master plans, expansions and redevelopment4616$140.9M$7.6M
New parks and unnamed future projects1221$12.8K$12.8K
Other$492.2Kunder 1% of dollars
Other or unclear51$492.2K$492.2K

Each item has one type. The Atlas reads it from PP&R's title, then the description, using keyword rules and a hand-checked list for the largest mixed projects, so a whole-building renovation counts as a building even when it includes a new roof. It is a reading, not a City field. Select a type to see its items below; the type is also a column in the spreadsheet, so you can check or regroup it.

Repair or added capacity, by PP&R's own measure

PP&R gives every item a growth percentage: the share of the project that adds capacity for a growing city, the part that System Development Charges on new construction can pay for. The 86 items it marks 50% growth hold $256.3M, 51% of the priced total. None of the 492 items marked 100% growth has a 2023 estimate. Taking PP&R's percentages at face value, about $128.2M of the $506.2M is growth rather than repair.

No growth: repair and replacement

1,236 items · 857 priced · $249.9M

50% growth

86 items · 84 priced · $256.3M

100% growth

492 items · 0 priced · no estimates

What the most urgent items would cost

The items PP&R scores highest are mostly small jobs. The 343 items scored 48 or higher come to $56.3M for the 228 that have a price, 11% of the priced total. Items scored 24 to 47 hold 51% of the dollars.

Top · 75 and above

60 items · 40 priced · $11M

High · 48 to 74

283 items · 188 priced · $45.3M

Medium · 24 to 47

822 items · 523 priced · $259.4M

Lower · 1 to 23

345 items · 141 priced · $104M

Unscored · no score, or a score of 0

304 items · 49 priced · $86.5M

The same job, park by park

PP&R lists many identical jobs separately at each place. Its public records don't say whether they are designed and bid together or one park at a time, which can change what they cost. These titles each appear at ten or more places.

Backlog titles that appear at ten or more places
PP&R's titlePlacesWith a price2023 estimatesTypical item
Provide ADA compliance accessible path of travel1600——
Pathway Renovation135134$29.7M$77.4K
ESPC-III_Buildings Lighting to LEDs7048$564.5K$11.8K
Playground renovation3837$9.3M$205.8K
Replace Backflow preventer device3837$482K$10K
ESPC-III_Pathway Lighting to LEDs2929$1.3M$21.2K
Renovate parking lot_Parking Area A1818$9M$258.2K
Renovate parking lot area180——
Renovate sport field1716$14.2M$714.2K
Replace old HVAC system1713$11.3M$113.1K

How to read these numbers

  • Costs are November 2023 planning estimates published by KGW, matched to today's items only where the title and description match at the same place. They are not bids or current prices.
  • 873 items have no estimate, including every item PP&R marks 100% growth and nearly every accessible-route item, so every total here leaves them out.
  • Scores and growth percentages are PP&R's own. The type of work is the Atlas's reading of PP&R's words.

The list

Every open item, in PP&R's order

Every item as a spreadsheet (CSV)
Show only
Showing 100 of 1,814 items. Numbers are positions in this list.

Score 100 · 11 items, tied

PP&R publishes no order for items with the same score. Listed here oldest request first. 2023 estimates for 9 of 11: $2.1M.

  1. #1100Top

    Fire Protection improvement

    University Park · District 2

    $724.9K2023 estimate

    Heating, plumbing and other building systems · Failure risk 25 of 25 · equity 4 of 5 · Staff project entry · requested FY 18/19, 8 years ago · CIP 805

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    Redesign the quantity and position of sprinklers in basement area. Provide sprinkler protection in unprotected crawl spaces.

  2. #2100Top

    Renovate the Roof of Residence building

    Leach Botanical Garden · District 1

    $90.8K2023 estimate

    Roofs · Failure risk 25 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1729

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment 17-18 Project update upon condition assessment outcome 24-25

  3. #3100Top

    Renovate the Roof of Maintenance building

    Portland International Raceway · District 2

    $122.2K2023 estimate

    Roofs · Failure risk 25 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1751

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment 17-18 Project update upon condition assessment outcome 24-25

  4. #4100Top

    Renovate sport field

    Gilbert Primary Park · District 1

    $225.1K2023 estimate

    Sports fields and courts · Failure risk 25 of 25 · equity 4 of 5 · Condition assessment · requested FY 22/23, 4 years ago · CIP 2012

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Sport fields rated 4 or 5 in condition assessment

  5. #5100Top

    Building renovation

    Maint Facility - SE 136th and Holgate · District 1

    $739.5K2023 estimate

    Community centers and other buildings · Failure risk 25 of 25 · equity 4 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 4380

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Renovate buildings rated 4 or 5 in condition assessment 17-18 Project update upon condition assessment outcome 24-25- need full renovation including the roof

  6. #6100Top

    Renovate retaining wall

    Kelley Point Park · District 2

    $30K2023 estimate

    Walls, fences, plazas and other site features · Failure risk 25 of 25 · equity 4 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 4422

    FY 2026–27 capital budget at this site: $1.5M (Kelley Point Picnic Improvements). It may pay for other work at the site.

    What PP&R's record says

    investigate and repair or replace retaining walls

  7. #7100Top

    Renovate retaining wall

    Kelly Butte Natural Area · District 1

    $30K2023 estimate

    Walls, fences, plazas and other site features · Failure risk 25 of 25 · equity 4 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 4423

    FY 2026–27 capital budget at this site: $400K (Kelly Butte Access Impr). It may pay for other work at the site.

    What PP&R's record says

    investigate and repair or replace retaining walls

  8. #8100Top

    Renovate electrical and mechanical equipment

    Maint Facility - SE 136th and Holgate · District 1

    $50K2023 estimate

    Heating, plumbing and other building systems · Failure risk 25 of 25 · equity 4 of 5 · Staff project entry · requested FY 23/24, 3 years ago · CIP 4425

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Electrical and mechanical equipment’s passed 25 year of service and need to replace.

  9. #9100Top

    Renovate electrical and mechanical equipment

    Portland International Raceway · District 2

    $100K2023 estimate

    Heating, plumbing and other building systems · Failure risk 25 of 25 · equity 4 of 5 · Staff project entry · requested FY 23/24, 3 years ago · CIP 4432

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Electrical and mechanical equipment’s passed 25 year of service and need to replace.

  10. #10100Top

    Replace or fix play surface

    Ventura Park · District 1

    No cost published

    Playgrounds · Failure risk 25 of 25 · equity 4 of 5 · Work order · requested FY 24/25, 2 years ago · CIP 4724

    Levy category · playground

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Replace/fix paly surface (AstroTurf) at artful play equipment which is torn and frayed, causing ripping hazard. Seams around edge of rocks have become loose and are no longer attached.

  11. #11100Top

    Carport roof replacement

    Portland International Raceway · District 2

    No cost published

    Roofs · Failure risk 25 of 25 · equity 4 of 5 · Condition assessment · requested FY 24/25, 2 years ago · CIP 4806

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Building condition assessment 24-25: replace the roof

Score 80 · 28 items, tied

PP&R publishes no order for items with the same score. Listed here oldest request first. 2023 estimates for 22 of 28: $5.4M.

  1. #1280Top

    Roof replacement

    Chimney Park · District 2

    $199.9K2023 estimate

    Roofs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 18/19, 8 years ago · CIP 1158

    FY 2026–27 capital budget at this site: $4K (Columbia Blvd Bridge @ Chimney Park). It may pay for other work at the site.

    What PP&R's record says

    - The roof of Garage and maintenance facility is in end of life cycle - This project derived from Building assessment - Project update upon condition assessment 24-25

  2. #1380Top

    Playground renovation

    University Park · District 2

    $555.6K2023 estimate

    Playgrounds · Failure risk 20 of 25 · equity 4 of 5 · Work order · requested FY 19/20, 7 years ago · CIP 1050

    Levy category · playground

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    - The vinyl coating is coming off of the play structure platforms and is creating jagged edges, potential for a bad scrape. - Install play equipment in the soft surface area at the north end of the building, new addition, and expand play area to add more equipment (current range is inadequate). Add sizeable free play area, per Technical Paper. -Playgroun…

  3. #1480Top

    Pathway Renovation

    Harney Park · District 3

    $238.8K2023 estimate

    Paths, trails and stairs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1092

    FY 2026–27 capital budget at this site: $201.2K (Replace Harney Play Structure). It may pay for other work at the site.

    What PP&R's record says

    Pathway: - Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment - The concrete path leading to the basketball courts near the bike lock up. Most of the pathway is in need of replacement 400’x8’wide Sidewalk: - Report from PDX Reporter that there is a hazardous raised/sunken sidewalk just north of the socc…

  4. #1580Top

    Pathway Renovation

    Kelley Point Park · District 2

    $645.3K2023 estimate

    Paths, trails and stairs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1099

    FY 2026–27 capital budget at this site: $1.5M (Kelley Point Picnic Improvements). It may pay for other work at the site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  5. #1680Top

    Pathway Renovation

    Leach Botanical Garden · District 1

    $28.8K2023 estimate

    Paths, trails and stairs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1123

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  6. #1780Top

    Pathway Renovation

    Stark Street Island · District 1

    $76.4K2023 estimate

    Paths, trails and stairs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1143

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  7. #1880Top

    ESPC-II_ Maint Facility - SE 136th and Holgate

    Maint Facility - SE 136th and Holgate · District 1

    $6.2K2023 estimate

    Energy-efficiency retrofits · Failure risk 20 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1336

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Add R-38 fiberglass batt insulation to underside of roof deck in shop area.. FIM Name: 13.02-0675 Add Roof Insulation

  8. #1980Top

    ESPC-II_ Charles Jordan Community Center

    University Park · District 2

    $21.2K2023 estimate

    Energy-efficiency retrofits · Failure risk 20 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1342

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    CJCC; Install 100 occupancy sensor plug load power strips throughout the facility to reduce plug load power consumption for loads that do not need to be on 24/7 such as computer monitors, TVs, scanners, paper shredders, printers, speakers, etc. All CPUs, modems, and routers to be plugged into "always on" ports in power strip to ensure connectivity for the…

  9. #2080Top

    ESPC-II_ East Portland Community Center & Pool

    Floyd Light Park · District 1

    $1.1K2023 estimate

    Energy-efficiency retrofits · Failure risk 20 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1415

    FY 2026–27 capital budget at this site: $90K (EPCC Roof Repair). It may pay for other work at the site.

    What PP&R's record says

    EPCC - Retro commission all irrigation sprinkler systems and heads to ensure proper thrown and timing. Replace 10% of all rotary and spray heads.. FIM Name: 18.10-0104 Irrigation System Improvements

  10. #2180Top

    ESPC-III_Buildings Lighting to LEDs

    Floyd Light Park · District 1

    $11.8K2023 estimate

    Energy-efficiency retrofits · Failure risk 20 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1458

    FY 2026–27 capital budget at this site: $90K (EPCC Roof Repair). It may pay for other work at the site.

    What PP&R's record says

    LED conversion for Exterior and Interior Lights

  11. #2280Top

    ESPC-III_Buildings Lighting to LEDs

    University Park · District 2

    No cost published

    Energy-efficiency retrofits · Failure risk 20 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1505

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    LED conversion for Exterior and Interior Lights

  12. #2380Top

    Renovate the Roof of Administration building

    Portland International Raceway · District 2

    $360.4K2023 estimate

    Roofs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1735

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment 17-18 Project update upon condition assessment outcome 24-25

  13. #2480Top

    Renovate the Roof of Shelter - Restroom building

    Kelley Point Park · District 2

    $103.1K2023 estimate

    Roofs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1760

    Levy category · restroom

    FY 2026–27 capital budget at this site: $1.5M (Kelley Point Picnic Improvements). It may pay for other work at the site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment Project update upon condition assessment outcome 24-25

  14. #2580Top

    Renovate the Roof of Restroom - Storage building

    University Park · District 2

    $80.4K2023 estimate

    Roofs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1761

    Levy category · restroom

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment 17-18 Project update upon condition assessment outcome 24-25.

  15. #2680Top

    Renovate the Roof of Visitor Services building

    Portland International Raceway · District 2

    $33.4K2023 estimate

    Roofs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1783

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment Project update upon condition assessment outcome 24-25

  16. #2780Top

    Pathway Renovation

    Portland International Raceway · District 2

    $235.2K2023 estimate

    Paths, trails and stairs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 4433

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  17. #2880Top

    Renovate parking lot_Parking Area A

    University Park · District 2

    $209.3K2023 estimate

    Parking lots and roads · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1637

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    Repair parking lot that was rated 4 in condition assessment. Repair include surface, drainage and curb. approx area= 12801 sq.ft Project update upon condition assessment outcome 24-25

  18. #2980Top

    Playground renovation

    Hancock Park · District 3

    $328K2023 estimate

    Playgrounds · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1874

    At risk of closure · playgroundLevy category · playground

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    - Renovation or repair playground that was rated as 4 during playground assessment in 2020 - Potentially joining Metro Bond Local Share Pathways Work.

  19. #3080Top

    Playground renovation

    Argay Park · District 1

    $177K2023 estimate

    Playgrounds · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1875

    At risk of closure · playgroundLevy category · playground

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Renovation or repair playground that was rated as 4 during playground assessment in 2020

  20. #3180Top

    Playground renovation

    University Park · District 2

    $165.7K2023 estimate

    Playgrounds · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1891

    Levy category · playground

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    Renovation or repair playground that was rated as 4 during playground assessment in 2020

  21. #3280Top

    Playground renovation

    Wilkes Park · District 1

    $404.6K2023 estimate

    Playgrounds · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 4394

    At risk of closure · playgroundLevy category · playground

    FY 2026–27 capital budget at this site: $875K (Wilkes Headwaters; Wilkes Headwaters Development). It may pay for other work at the site.

    What PP&R's record says

    Renovation or repair playground that was rated as 5 during playground assessment in 2020

  22. #3380Top

    Renovate sport field

    Argay Park · District 1

    $1M2023 estimate

    Sports fields and courts · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 22/23, 4 years ago · CIP 2003

    Site named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Sport fields rated 4 or 5 in condition assessment

  23. #3480Top

    Renovate sport field

    Floyd Light Park · District 1

    $522.6K2023 estimate

    Sports fields and courts · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 22/23, 4 years ago · CIP 2011

    FY 2026–27 capital budget at this site: $90K (EPCC Roof Repair). It may pay for other work at the site.

    What PP&R's record says

    Sport fields rated 4 or 5 in condition assessment

  24. #3580Top

    Sport courts renovation- assessment outcome

    Raymond Park · District 1

    No cost published

    Sports fields and courts · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 4535

    FY 2026–27 capital budget at this site: $255.7K (Raymond Pk Play&Sewer). It may pay for other work at the site.

    What PP&R's record says

    Renovate volleyball court rated badthrough sport court condition assessment in 2023.

  25. #3680Top

    Renovate Off leash area

    Chimney Park · District 2

    No cost published

    Walls, fences, plazas and other site features · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 4629

    FY 2026–27 capital budget at this site: $4K (Columbia Blvd Bridge @ Chimney Park). It may pay for other work at the site.

    What PP&R's record says

    Renovate dog off leash area rated 4 or 5 in asset condition assessment

  26. #3780Top

    Renovate Off leash area

    Cherry Park · District 1

    No cost published

    Walls, fences, plazas and other site features · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 4631

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Renovate dog off leash area rated 4 or 5 in asset condition assessment

  27. #3880Top

    Replace Electrical Wiring and Lighting

    Chimney Park · District 2

    No cost published

    Site lighting and electrical · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 24/25, 2 years ago · CIP 4718

    FY 2026–27 capital budget at this site: $4K (Columbia Blvd Bridge @ Chimney Park). It may pay for other work at the site.

    What PP&R's record says

    Problem Statement: The branch wiring and commercial lighting exceeds its useful life. Solution Statement: Replace 11,554 SF of branch wiring with updated commercial led lighting.

  28. #3980Top

    Restroom South roof replacement

    Portland International Raceway · District 2

    No cost published

    Roofs · Failure risk 20 of 25 · equity 4 of 5 · Condition assessment · requested FY 24/25, 2 years ago · CIP 4805

    Fee-supported site: golf or RacewayLevy category · restroom

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Building condition assessment 24-25: renovate/replace the roof

Score 75 · 21 items, tied

PP&R publishes no order for items with the same score. Listed here oldest request first. 2023 estimates for 9 of 21: $3.5M.

  1. #4075Top

    Replace Elephant Barn Roof

    Washington Park · District 4

    $529.2K2023 estimate

    Roofs · Failure risk 25 of 25 · equity 3 of 5 · Work order · requested FY 09/10, 17 years ago · CIP 33

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $50K (WaPk Wayfinding). It may pay for other work at the site.

    What PP&R's record says

    - Roof is leaking and deteriorated - ongoing leak confirmed in 2026 carpentry roof inspection. - The soffit and facer boards on the southwest corner show signs of rotting and may need to be replaced. - The roof needs replacment. - Need to add sufficient fall protection measures (tie offs, etc.) when roof is replaced. Project update upon condition assessme…

  2. #4175Top

    Rose Garden Restroom Renovation

    Washington Park · District 4

    No cost published

    Restrooms · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 14/15, 12 years ago · CIP 602

    Site named at risk of closureLevy category · restroom

    FY 2026–27 capital budget at this site: $50K (WaPk Wayfinding). It may pay for other work at the site.

    What PP&R's record says

    Renovation of the 1928 restroom B in the Rose Garden parking lot. Roof replacement, seismic upgrades, interior repairs to walls that have suffered water damage, upgrade plumbing, electrical, computer wiring. Project update upon condition assessment outcome 24-25.

  3. #4275Top

    Renovate main building

    Heron Lakes Golf Course · District 2

    No cost published

    Community centers and other buildings · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 18/19, 8 years ago · CIP 1063

    Fee-supported site: golf or RacewayAt risk of closure · roof replacement

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Roof and structure in Bad condition and rated as bad through condition aseesment Project update upon condition assessment outcome 24-25: renovate structure of main building

  4. #4375Top

    Replace car barns roof

    Colwood Property · District 2

    No cost published

    Roofs · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 18/19, 8 years ago · CIP 1159

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    - The roof of Cart Barn is in end of life cycle. Drip edge, fasica and shingles need to replace - This project derived from Building assessment 17-18 and updated 24-25

  5. #4475Top

    Renovate the Roof of Maintenance building

    Pier Park · District 2

    $154K2023 estimate

    Roofs · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1750

    Site named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment 17-18 Project update upon condition assessment outcome 24-25: comprehensive renovation including roof, foundation, and internal. replacment is recommended

  6. #4575Top

    Renovate the Roof of Restroom building

    Plaza Blocks · District 4

    No cost published

    Roofs · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1772

    Levy category · restroom

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment 17-18 Project update upon condition assessment outcome 24-25

  7. #4675Top

    Renovate the Roof of Equipment shelter

    Red Tail Golf Course

    $12K2023 estimate

    Roofs · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 4434

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Fix or replace the Roof that is rated 4 through buildings' assessment 17-18 Project update upon condition assessment outcome 24-25: replace 3 shelters

  8. #4775Top

    Secure hanging fiberglass insulation

    East Delta Park · District 2

    $231.4K2023 estimate

    Roofs · Failure risk 25 of 25 · equity 3 of 5 · Work order · requested FY 20/21, 6 years ago · CIP 1725

    Site named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Problem: Fiberglass insulation of tool storage barn attached to naintenance building is falling. Rain water go through the roof, make the fiberglass wet and heavy, and tend to fall Solution1 (Recommended): Fix the roof and replace the insulation Solution2 (Temporary): Use steel strap to hold the fiberglass where there is potentially falling. Straps, scr…

  9. #4875Top

    Playground renovation

    Unnamed location

    No cost published

    Playgrounds · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1871

    Levy category · playground
    What PP&R's record says

    Renovation or repair playground that was rated as 5 during playground assessment in 2020

  10. #4975Top

    Renovate sport field

    Pier Park · District 2

    $2M2023 estimate

    Sports fields and courts · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 22/23, 4 years ago · CIP 2018

    Site named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Sport fields rated 4 or 5 in condition assessment

  11. #5075Top

    Renovate electrical and mechanical equipment

    Heron Lakes Golf Course · District 2

    $50K2023 estimate

    Heating, plumbing and other building systems · Failure risk 25 of 25 · equity 3 of 5 · Staff project entry · requested FY 23/24, 3 years ago · CIP 4414

    Fee-supported site: golf or RacewaySite named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Electrical and mechanical equipment’s passed 25 year of service and need to replace.

  12. #5175Top

    Renovate electrical and mechanical equipment

    Oaks Pioneer Church and Park · District 4

    $50K2023 estimate

    Heating, plumbing and other building systems · Failure risk 25 of 25 · equity 3 of 5 · Staff project entry · requested FY 23/24, 3 years ago · CIP 4431

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Electrical and mechanical equipment’s passed 25 year of service and need to replace.

  13. #5275Top

    Renovate electrical and mechanical equipment

    Westmoreland Park · District 4

    $50K2023 estimate

    Heating, plumbing and other building systems · Failure risk 25 of 25 · equity 3 of 5 · Staff project entry · requested FY 23/24, 3 years ago · CIP 4436

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $538.7K (Westmoreland Irrigation Main; Repair WstMrlnd Ntr Ply Logs). It may pay for other work at the site.

    What PP&R's record says

    Electrical and mechanical equipment’s passed 25 year of service and need to replace.

  14. #5375Top

    Renovate Off leash area

    East Delta Park · District 2

    No cost published

    Walls, fences, plazas and other site features · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 4625

    Site named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Renovate dog off leash area rated 4 or 5 in asset condition assessment

  15. #5475Top

    Renovate the Roof of Administration building

    East Delta Park · District 2

    $376.8K2023 estimate

    Roofs · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 24/25, 2 years ago · CIP 1730

    Site named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    - Fix or replace the Roof that is rated 4 through buildings' assessment 17-18 - Project update upon condition assessment outcome 24-25- Roof rate 5 and structure 4, and windows and doors 4

  16. #5575Top

    Replace Single Ply Roofing

    Gov Tom McCall Waterfront Park · District 4

    No cost published

    Roofs · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 24/25, 2 years ago · CIP 4696

    FY 2026–27 capital budget at this site: $550K (Wtrnt Pk Bowl Redvlp; Salmon Street Fountain Electrical). It may pay for other work at the site.

    What PP&R's record says

    Problem Statement: Roof has standing water in big portions which eventually will lead to failure and leaks. Solution Statement: Replace 3,650 SF of single ply roof and redevelop roof pitch to accommodate proper drainage.

  17. #5675Top

    Renovate clubhouse

    Heron Lakes Golf Course · District 2

    No cost published

    Community centers and other buildings · Failure risk 25 of 25 · equity 3 of 5 · Condition assessment · requested FY 24/25, 2 years ago · CIP 4776

    Fee-supported site: golf or RacewayAt risk of closure · roof replacement

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Condition assessment 24-25: renovate roof and siding of clubhouse

  18. #5775Top

    Replace Pour In Place play area surface

    Thomas Cully Property · District 2

    No cost published

    Playgrounds · Failure risk 25 of 25 · equity 3 of 5 · Work order · requested FY 25/26, 1 year ago · CIP 4871

    Levy category · playground

    FY 2026–27 capital budget at this site: $300K (Cully Natv Gath Grdn). It may pay for other work at the site.

    What PP&R's record says

    Replace failed playground surface (PIP- Pebbleflex Brand) that developing holes and tearing- approx. 2000 sq.ft. Check WO request for detail

  19. #5875Top

    Replace Poured In Place play surface

    Gateway Discovery Park · District 1

    No cost published

    Playgrounds · Failure risk 25 of 25 · equity 3 of 5 · Work order · requested FY 25/26, 1 year ago · CIP 4872

    Levy category · playground

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Replace failed poured in place (PIP) surface (Pebbleflex Brand) that has developed holes and cracks- approx. 5000 sq.ft. Check WO request for detail

  20. #5975Top

    Replace Poured In Place play surface

    Lents Park · District 1

    No cost published

    Playgrounds · Failure risk 25 of 25 · equity 3 of 5 · Work order · requested FY 25/26, 1 year ago · CIP 4873

    Site named at risk of closureLevy category · playground

    FY 2026–27 capital budget at this site: $4.8K (Lents Irrig Replacement). It may pay for other work at the site.

    What PP&R's record says

    - Replace failed poured in place (PIP) surface (Pebbleflex Brand) that developing holes and cracks- approx. 7000 sq.ft. - Fix grass turf issue around play area - Fix drainage issue in synthetic play area Check WO request for detail

  21. #6075Top

    Replace wooden retaining wall

    Washington Park · District 4

    No cost published

    Walls, fences, plazas and other site features · Failure risk 25 of 25 · equity 3 of 5 · Work order · requested FY 25/26, 1 year ago · CIP 4890

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $50K (WaPk Wayfinding). It may pay for other work at the site.

    What PP&R's record says

    Replace failing wooden retaining wall with dry stack rock wall. Approximate dimension of new wall is 100’ length and 8’ high. Check attached report for more detail.

Score 64 · 29 items, tied

PP&R publishes no order for items with the same score. Listed here oldest request first. 2023 estimates for 18 of 29: $5.6M.

  1. #6164High

    Rebuild trail from Airport Way to NE 185th

    Big Four Corners Natural Area · District 1

    $154.8K2023 estimate

    Community centers and other buildings · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 09/10, 17 years ago · CIP 40

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Rebuild distressed portions of the trail from Airport Way to NE 185th. Would need to amend the South Shore plan to allow for an upgrade to the trail.

  2. #6264High

    Wading Pool Conversion to Splash Pa

    Ventura Park · District 1

    No cost published

    Pools and splash pads · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 09/10, 17 years ago · CIP 170

    Growth · SDC-eligible

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Convert a wading pool to a splash pad at high-ranking site (CIP1). Standard assumptions: flow-through, all ground-spray, avg. 1,300 s.f. wetted area (cap. 50 users) plus spectator zone, in-house design/build. High Priority

  3. #6364High

    District Skatepark #4

    Ventura Park · District 1

    No cost published

    Sports fields and courts · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 09/10, 17 years ago · CIP 208

    Growth · SDC-eligible

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Build one 12K sq ft district skatepark that can accommodate 40-100 users. Assumes location already has drinking fountains and RR.

  4. #6464High

    Manor House - Retaining Wall

    Leach Botanical Garden · District 1

    $913.2K2023 estimate

    Community centers and other buildings · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 14/15, 12 years ago · CIP 638

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Repair retaining wall below the manor. Showing signs of distress.

  5. #6564High

    Park Development

    SE Division St and SE 150th Ave Property · District 1

    No cost published

    New parks and unnamed future projects · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 18/19, 8 years ago · CIP 891

    Levy category · restroomGrowth · SDC-eligible

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Add amenities, plaza entrance, skate spot, basketball court, flexible lawn space with space for a soccer field, picnic shelter, pollinator garden, restroom, community garden, playground, parking lot, and fenced dog off leash area

  6. #6664High

    Repair Nike basketball surface

    Harney Park · District 3

    $23.5K2023 estimate

    Sports fields and courts · Failure risk 16 of 25 · equity 4 of 5 · Work order · requested FY 19/20, 7 years ago · CIP 1054

    FY 2026–27 capital budget at this site: $201.2K (Replace Harney Play Structure). It may pay for other work at the site.

    What PP&R's record says

    The new Nike basketball court surface is peeling and needs repaired before the damage spreads

  7. #6764High

    ESPC-II_ Maint Facility - Chimney Park

    Chimney Park · District 2

    $32.9K2023 estimate

    Energy-efficiency retrofits · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1253

    FY 2026–27 capital budget at this site: $4K (Columbia Blvd Bridge @ Chimney Park). It may pay for other work at the site.

    What PP&R's record says

    Retrocommission all astronomical and mechanical timeclocks to ensure proper operation and correct current time.. FIM Name: 05.00-1399 Retro Commissioning Astronomical & Mech Timeclocks Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-1399 Building Interior Lighting LED Conversion Tighten schedules and setpoints to match…

  8. #6864High

    ESPC-II_ Maint Facility - SE 136th and Holgate

    Maint Facility - SE 136th and Holgate · District 1

    $5.1K2023 estimate

    Energy-efficiency retrofits · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1283

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.06-0675 Building Interior Lighting LED Conversion

  9. #6964High

    ESPC-II_ Maint Facility - SE 136th and Holgate

    Maint Facility - SE 136th and Holgate · District 1

    $1.1K2023 estimate

    Energy-efficiency retrofits · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1321

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Install a GE control node on each pathway light fixture. Node for parks with <50 fixtures will be model #ELWM18BXXXXAD. Node for parks with >50 fixtures will be model #ELWN08BXXXXAD.. FIM Name: 09.17-0675 Building Exterior Lighting Controls

  10. #7064High

    ESPC-II_ Maint Facility - SE 136th and Holgate

    Maint Facility - SE 136th and Holgate · District 1

    $2K2023 estimate

    Energy-efficiency retrofits · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1348

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Tighten schedules and setpoints to match occupancy and maintain a 5F deadband between occupied heating and cooling setpoints.. FIM Name: 04.01-0675 DDC/Control System Optimization

  11. #7164High

    ESPC-II_ Maint Facility - SE 136th and Holgate

    Maint Facility - SE 136th and Holgate · District 1

    $1.6K2023 estimate

    Energy-efficiency retrofits · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1371

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Convert existing lighting to LED technology via a re-lamp approach.. FIM Name: 09.07-0675 Building Exterior Lighting LED Conversion

  12. #7264High

    ESPC-III_Buildings Lighting to LEDs

    Portland International Raceway · District 2

    No cost published

    Energy-efficiency retrofits · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1405

    Fee-supported site: golf or Raceway

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    LED conversion for Exterior and Interior Lights

  13. #7364High

    ESPC-II_ Maint Facility - SE 136th and Holgate

    Maint Facility - SE 136th and Holgate · District 1

    $48.2K2023 estimate

    Energy-efficiency retrofits · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1431

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Move the existing CCTV/security station cabinet on E wall of the building into the maintenance supervisor’s office. Cabinet to be mounted so that the top of the cabinet is at the same height as the supervisor’s desk. Propose relocating to the left of the window on the southern wall of the supervisor’s office.. FIM Name: 20.00-0675 Relocate Existing CCTV/S…

  14. #7464High

    ESPC-III_Buildings Lighting to LEDs

    McCoy Park · District 2

    No cost published

    Energy-efficiency retrofits · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 19/20, 7 years ago · CIP 1523

    FY 2026–27 capital budget at this site: $323 (McCoy Drainage). It may pay for other work at the site.

    What PP&R's record says

    LED conversion for Exterior and Interior Lights

  15. #7564High

    Renovate the Structure of Visitor Services building

    Leach Botanical Garden · District 1

    $190.7K2023 estimate

    Seismic and structural · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1784

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Fix or replace the Structure that is rated 4 through buildings' assessment Project update upon condition assessment outcome 24-25

  16. #7664High

    Renovate Basketball sport court at Wilkes Park

    Wilkes Park · District 1

    $75.6K2023 estimate

    Sports fields and courts · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 19/20, 7 years ago · CIP 1802

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $875K (Wilkes Headwaters; Wilkes Headwaters Development). It may pay for other work at the site.

    What PP&R's record says

    Fix or replace the Nike Resurf surface of the court that is rated 4 through courts' assessment

  17. #7764High

    Pathway Renovation

    Chimney Park · District 2

    $51.2K2023 estimate

    Paths, trails and stairs · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1672

    FY 2026–27 capital budget at this site: $4K (Columbia Blvd Bridge @ Chimney Park). It may pay for other work at the site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  18. #7864High

    Pathway Renovation

    Jason Lee Middle School · District 3

    No cost published

    Paths, trails and stairs · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1682

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  19. #7964High

    Pathway Renovation

    Argay Park · District 1

    $54.6K2023 estimate

    Paths, trails and stairs · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1690

    Site named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  20. #8064High

    Pathway Renovation

    McCoy Park · District 2

    $20.2K2023 estimate

    Paths, trails and stairs · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1713

    FY 2026–27 capital budget at this site: $323 (McCoy Drainage). It may pay for other work at the site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  21. #8164High

    Pathway Renovation

    University Park · District 2

    $40.2K2023 estimate

    Paths, trails and stairs · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1719

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  22. #8264High

    Pathway Renovation

    Ventura Park · District 1

    $128.3K2023 estimate

    Paths, trails and stairs · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 20/21, 6 years ago · CIP 1720

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Replace the damaged pathway, trails and sidewalks that have been rated as 4 and 5 in Pathway assessment

  23. #8364High

    Renovate buildings in Leach Botanical Garden

    Leach Botanical Garden · District 1

    $3.6M2023 estimate

    Community centers and other buildings · Failure risk 16 of 25 · equity 4 of 5 · Staff project entry · requested FY 20/21, 6 years ago · CIP 1821

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Renovate Manor house/gift shop, Carriage House, Stone Cabin, and remove Aluminum Bridge Cost details in attached project summary

  24. #8464High

    Renovate Basketball sport court at Ed Benedict Park

    Ed Benedict Park · District 1

    $200.8K2023 estimate

    Sports fields and courts · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 1799

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $3K (Repair Ed Benedict Path/Trail/Sidewalk). It may pay for other work at the site.

    What PP&R's record says

    Fix or replace the Nike Resurf surface of the court that is rated 4 through courts' assessment

  25. #8564High

    Provide ADA compliance accessible path of travel

    Glenfair Park · District 1

    No cost published

    Accessible routes (ADA) · Failure risk 16 of 25 · equity 4 of 5 · 2022 LOS guidance · requested FY 23/24, 3 years ago · CIP 4256

    ADA scope2022 LOS guidanceGrowth · SDC-eligible

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Provide 2 ADA compliance accessible path of travel. For Growth and SDC eligibility, this project will increase the capacity of the park by adding/upgrading circulation trails and pathways.

  26. #8664High

    Provide ADA compliance accessible path of travel

    Ventura Park · District 1

    No cost published

    Accessible routes (ADA) · Failure risk 16 of 25 · equity 4 of 5 · 2022 LOS guidance · requested FY 23/24, 3 years ago · CIP 4315

    ADA scope2022 LOS guidanceGrowth · SDC-eligible

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Provide 1 ADA compliance accessible path of travel. For Growth and SDC eligibility, this project will increase the capacity of the park by adding/upgrading circulation trails and pathways.

  27. #8764High

    Workspace- Site configuration and safety

    Maint Facility - SE 136th and Holgate · District 1

    No cost published

    Staff workspaces · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 23/24, 3 years ago · CIP 4507

    Staff site: maintenance yard or office

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Project components: Improvement Type: Parking, Category: Relcoate storage, Subcategory: NA, Description: Move Tough Shed Storage to Leased faciltiy, Invest#: 675.06 Improvement Type: Parking, Category: Site Configuration, Subcategory: Parking - paving, Description: Pave Visitor/Overflow parking, Invest#: 675.05 Improvement Type: Parking, Category: Site Co…

  28. #8864High

    Replace water fountains with a bottle filling stations

    Floyd Light Park · District 1

    No cost published

    Walls, fences, plazas and other site features · Failure risk 16 of 25 · equity 4 of 5 · Work order · requested FY 24/25, 2 years ago · CIP 4730

    Levy category · restroom

    FY 2026–27 capital budget at this site: $90K (EPCC Roof Repair). It may pay for other work at the site.

    What PP&R's record says

    Replace the water fountains outside the lobby restrooms and at the pool deck with a bottle filling stations.

  29. #8964High

    Inspect and fix foundation

    University Park · District 2

    No cost published

    Seismic and structural · Failure risk 16 of 25 · equity 4 of 5 · Condition assessment · requested FY 24/25, 2 years ago · CIP 4816

    FY 2026–27 capital budget at this site: $1M (University Park Amenities; CJCC HVAC Grant). It may pay for other work at the site.

    What PP&R's record says

    Building condition assessment 24-25: incline cracks in perimeter foundation could indicate settlement failure. Need special inspection and potential remedy

Score 60 · 98 items, tied

PP&R publishes no order for items with the same score. Listed here oldest request first. 2023 estimates for 81 of 98: $23.3M.

  1. #9060High

    Renovate and improve picnic shelter and picnic sit

    Columbia Park · District 2

    No cost published

    Walls, fences, plazas and other site features · Failure risk 20 of 25 · equity 3 of 5 · Staff project entry · requested FY 04/05, 22 years ago · CIP 530

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $1.8M (Columbia Pool Structural Assessment; Columbia Park Amenities; 1 more). It may pay for other work at the site.

    What PP&R's record says

    Replace the roof that was rated 4 in condition assessment 24-25 Assess picnic shelter and perform necessary safety upgrades and repairs. Renovate picnic sites as needed. Replaces CIP 1951, projects were split out.

  2. #9160High

    Play Area Safety and ADA

    DeWitt Park · District 4

    $207.8K2023 estimate

    Playgrounds · Failure risk 20 of 25 · equity 3 of 5 · Staff project entry · requested FY 09/10, 17 years ago · CIP 173

    ADA scopeLevy category · playground

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Removal and replacement of existing Wildwood play structures. Wildwood play equipment is no longer manufactured. Structures have outlived their useful life. Add small free play area, per Technical Paper.

  3. #9260High

    Renovation of tennis courts

    Glenwood Park · District 1

    $267.8K2023 estimate

    Sports fields and courts · Failure risk 20 of 25 · equity 3 of 5 · Condition assessment · requested FY 09/10, 17 years ago · CIP 190

    At risk of closure · court

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Resurface 2 courts, provide drinking fountain, new benches, fencing and nets/standards. Priority 1

  4. #9360High

    Roof repair replacment

    Northgate Park · District 2

    No cost published

    Roofs · Failure risk 20 of 25 · equity 3 of 5 · Condition assessment · requested FY 09/10, 17 years ago · CIP 504

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $5.7K (Nrthgte Rugby Fld #9). It may pay for other work at the site.

    What PP&R's record says

    Replace roof on picnic shelter at Northgate Park. Replace shingles, fascia boards, seal. Replaces previous CIP 2287, projects were split out by site. Project update upon condition assessment outcome 24-25- replace roof and renovate the structure

  5. #9460High

    Restroom Upgrades

    Washington Park · District 4

    No cost published

    Restrooms · Failure risk 20 of 25 · equity 3 of 5 · Staff project entry · requested FY 09/10, 17 years ago · CIP 593

    Site named at risk of closureLevy category · restroom

    FY 2026–27 capital budget at this site: $50K (WaPk Wayfinding). It may pay for other work at the site.

    What PP&R's record says

    Repair restroom at the Holocaust Memorial at Washington Park. Repair exterior surfaces, repaint. Requires lead abatement. Replaces CIP 2286, projects were split out. Updated through condition assessment 24-25

  6. #9560High

    Pool Solar Thermal Installation

    Pier Park · District 2

    $31K2023 estimate

    Energy-efficiency retrofits · Failure risk 20 of 25 · equity 3 of 5 · Staff project entry · requested FY 11/12, 15 years ago · CIP 395

    Site named at risk of closure

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    Installation of a new solar thermal hot water system.

  7. #9660High

    Install Boiler

    Ida B Wells-Barnett Outdoor Pool · District 4

    $219.9K2023 estimate

    Heating, plumbing and other building systems · Failure risk 20 of 25 · equity 3 of 5 · Staff project entry · requested FY 14/15, 12 years ago · CIP 644

    The Atlas found no FY 2026–27 capital budget line for this site.

    What PP&R's record says

    1- Project is reliant on pool filter installations. Heated pool water is provided by PPS. Their boilers are inefficient, causing disruptions to pool programming. 2- Steam from PPS during winters has caused a problem of steam entering a very cold climate causing any excess or exhaust of steam to immediately condense in the mechanical room making everythi…

  8. #9760High

    Columbia Cottage HVAC and Roof

    Columbia Park · District 2

    $216.5K2023 estimate

    Roofs · Failure risk 20 of 25 · equity 3 of 5 · Condition assessment · requested FY 14/15, 12 years ago · CIP 656

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $1.8M (Columbia Pool Structural Assessment; Columbia Park Amenities; 1 more). It may pay for other work at the site.

    What PP&R's record says

    - Replace failing furnace. System is at end of life. - Replace the roof as it is in the end of life cycle. Roof condition was detremind through building assessment - Project update following outcome of condition assessment 24-25- fix settlement in the foundation

  9. #9860High

    Electrical system replacement

    SW Carwash Fountain · District 4

    $111.1K2023 estimate

    Site lighting and electrical · Failure risk 20 of 25 · equity 3 of 5 · Staff project entry · requested FY 15/16, 11 years ago · CIP 685

    What PP&R's record says

    Electrical system is unsafe to operate and has been disconnected. Fountain cannot operate until new system is installed. This is for installation of new system.

  10. #9960High

    Restroom Renovation

    Columbia Park · District 2

    $294K2023 estimate

    Restrooms · Failure risk 20 of 25 · equity 3 of 5 · Condition assessment · requested FY 15/16, 11 years ago · CIP 857

    At risk of closure · restroomLevy category · restroom

    FY 2026–27 capital budget at this site: $1.8M (Columbia Pool Structural Assessment; Columbia Park Amenities; 1 more). It may pay for other work at the site.

    What PP&R's record says

    Restroom A: Repair / replace roof , fixtures, lighting, access Renovate the roofs of restroom A and B that were rated 4 in condition assessment 24-25

  11. #10060High

    Rose garden Sidewalk

    Washington Park · District 4

    $17.6K2023 estimate

    Paths, trails and stairs · Failure risk 20 of 25 · equity 3 of 5 · Work order · requested FY 17/18, 9 years ago · CIP 965

    Site named at risk of closure

    FY 2026–27 capital budget at this site: $50K (WaPk Wayfinding). It may pay for other work at the site.

What would settle it

Records that would turn this ranking into what gets fixed next

  • Funded status for every backlog IDWhich items are in this year's capital budget, the five-year capital plan, the major-maintenance list or the levy project list, matched by project number.
  • Current cost for every itemThe estimate PP&R holds now, with its date and basis, so items can be compared on cost as well as need.
  • The two ratings behind each failure-risk numberLikelihood and consequence recorded separately, with what each step on the 1-to-5 scales means, and how the equity rating is built.
  • How PP&R chooses among tied itemsThe procedure for picking which scored items get funded, and which funding sources may pay for which items.
  • Why 304 items have no usable score293 have no score and 11 have a score of 0.
  • Where this year's capital money goesThe property each capital project line serves, including the $69.4M the Atlas could not place.